Exam 8: Project Quality Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

____________________ often results in requested changes and validated defect repair,resulting from recommended defect repair or corrective or preventive actions.

Free
(Short Answer)
4.9/5
(28)
Correct Answer:
Verified

Rework

____________________ design methods focus on eliminating defects by substituting scientific inquiry for trial-and-error methods.

Free
(Short Answer)
4.7/5
(35)
Correct Answer:
Verified

Robust

An important tool used in the ____ phase of the DMAIC process is the fishbone or Ishikawa diagram.

Free
(Multiple Choice)
4.9/5
(26)
Correct Answer:
Verified

C

Integration testing replaces the other forms of testing with a single comprehensive test.

(True/False)
4.8/5
(38)

____ correct(s)or prevent(s)further quality problems based on quality control measurements.

(Multiple Choice)
4.8/5
(29)

____ is a comprehensive and flexible systemfor achieving,sustaining and maximizing business success.

(Multiple Choice)
4.9/5
(31)

Quality is a lower priority than project scope,time,and cost.

(True/False)
4.8/5
(30)

Quality planning implies the ability to anticipate situations and prepare actions that bring about the desired outcome.

(True/False)
4.8/5
(33)

____ involves choosing part of a population of interest for inspection.

(Multiple Choice)
4.8/5
(41)

List and briefly describe the three project quality management processes.

(Essay)
4.9/5
(38)

____ involves periodically evaluating overall project performance to ensure that the project will satisfy the relevant quality standards.

(Multiple Choice)
4.9/5
(29)

What are the five phases in the DMAIC process? Briefly describe each one.

(Essay)
4.8/5
(38)

Projects that use Six Sigma principles for quality control normally follow a five-phase improvement process called ____________________.

(Short Answer)
4.8/5
(36)

If products are accepted,they are considered to be validated deliverables.

(True/False)
4.7/5
(28)

The International Organization for Standardization (ISO)defines ____________________ as "the totality of characteristics of an entity that bear on its ability to satisfy stated or implied needs."

(Short Answer)
4.8/5
(34)

A ____ is a bell-shaped curve that is symmetrical regarding the average value of the population (the data being analyzed).

(Multiple Choice)
4.8/5
(32)

____ is the ability of a product or service to perform as expected under normal conditions.

(Multiple Choice)
5.0/5
(34)

____ includes identifying which quality standards are relevant to the project and how to satisfy those standards.

(Multiple Choice)
5.0/5
(39)

What are the three main outcomes of quality control? Briefly describe each.

(Essay)
4.8/5
(32)

____ help(s)you identify the vital few contributors that account for most quality problems in a system.

(Multiple Choice)
4.9/5
(35)
Showing 1 - 20 of 100
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)