Deck 5: Projects

Full screen (f)
exit full mode
Question
The Gantt chart is an example of a project control chart.
Use Space or
up arrow
down arrow
to flip the card.
Question
A work breakdown structure is used in project management but it is not used when the critical path method is involved.
Question
A matrix project attempts to blend properties of functional and pure project structures.
Question
The fact that organizations are flattening is one of the reasons that project management is important.
Question
CPM is an abbreviation for Critical Path Method.
Question
In CPM the late start time estimate is the latest time you can start an activity and still keep the entire project on schedule.
Question
The critical path in a CPM analysis is always the shortest path through the network.
Question
One of the disadvantages of a pure project organizational structure is that the project manager has full authority over the project.
Question
An event unit package is a subdivision of a project.
Question
A matrix project structure is often referred to as a "skunkworks."
Question
One of the advantages of a functional project organizational structure is that a team member can work on several projects.
Question
Upper level management must decide between pure,functional,and matrix structures as ways to organize projects.
Question
The second step in managing a project is writing the Statement of Work.
Question
A project may be defined as a series of related jobs directed toward some major output and requiring a significant period of time to perform.
Question
Slack activity time is the difference between the early start and the late finish of a project activity time.
Question
The critical path in a project is that sequence of activities that consume the longest amount of time in a project network of activities.
Question
A disadvantage of a matrix project organizational structure is that a project manager is held responsible for successful completion of the project.
Question
Complex projects are often subdivided into a series of tasks that are typically configured to be not longer than several months in duration.
Question
Project management can be defined as planning,directing,and controlling resources to meet the technical,cost,and time constraints of the project.
Question
The critical path of activities in a project is the sequence of activities that form the shortest chain in a project network of activities.
Question
The critical path in a CPM analysis is found by locating the activities times with zero slack.
Question
A project milestone is a specific event to be reached by a particular point in time.
Question
In the Time-Cost CPM model,cost is assumed to be a linear function of time.
Question
The valuations in an Earned Value Management analysis must be either profits or revenue.
Question
Derivative projects are those which address incremental changes to products or processes.
Question
A project can be subdivided into which of the following?

A) Job orders
B) Sub-jobs
C) Work Packages
D) Sub-paths
E) Events and decisions
Question
One of the assumptions made using CPM is that project activity sequence relationships can be specified and networked.
Question
Project management software available today combines CPM and other scheduling aids,like Gantt charting,to aid in tracking progress of project completion.
Question
Calculating the early start and early finish times for each activity in a CPM analysis does not provide any useful information.
Question
The activity direct costs associated with a project might include giving workers overtime to complete a project in less-than the expected time.
Question
Using the Time-Cost CPM model,the crash time is the shortest possible time allowed for each activity in the project.
Question
Earned Value Management (EVM)has the capability to combine measurements of scope,schedule and cost in a project.
Question
One of the assumptions made using CPM is that project activities can be identified with clear beginning and ending points.
Question
In a CPM analysis if you subtract the early start from the late start the result is the activity's slack time.
Question
Earned Value Management (EVM)is a technique for measuring project progress in an objective manner.
Question
In a CPM analysis if you subtract the late finish from the early finish the result is the activity's slack time.
Question
When reducing the planned duration of a project using the Time-Cost CPM model we select the activity to crash by determining the cost of each alternative and selecting the one whose cost is the greatest.
Question
You are managing a project and need to cut the cost of the project.You decide to transfer workers to another job to cut the project's costs.Costs associated with transferring the workers are an example of project indirect costs.
Question
Breakthrough projects are those that provide fundamental improvements to existing products.
Question
The project indirect costs associated with a project include overhead,facilities,and resource opportunity costs.
Question
A listing of immediate predecessor activities is important information in a CPM analysis for which of the following reasons?

A) It specifies the relationships in the CPM network of activities
B) It provides useful timing information
C) It includes cost information
D) It is the probability information required in the final step of CPM
E) None of the above
Question
You are looking at a chart that has the terms BCWS,BCWP and AC indicating lines on the chart.What kind of chart are you looking at?

A) Gantt Chart
B) PERT Chart
C) Bar/Milestone Chart
D) Total Program Cost Breakdown
E) EVM Chart
Question
A simple project listing of five activities,their predecessors and their respective time estimates are presented below:  Activity  Immediate Predecessor  Time in Days  A  None 2 B  A 2 C  A 1 D  B and C 3 E  D 1\begin{array} { | l | l | l | } \hline \text { Activity } & \text { Immediate Predecessor } & \text { Time in Days } \\\hline \text { A } & \text { None } & 2 \\\hline \text { B } & \text { A } & 2 \\\hline \text { C } & \text { A } & 1 \\\hline \text { D } & \text { B and C } & 3 \\\hline \text { E } & \text { D } & 1 \\\hline\end{array}
Using the CPM,which activities have slack in this project?

A) A
B) B
C) C
D) D
E) C and E
Question
You have been placed in charge of a large project.Shortened communication lines are required to insure quick resolution of problems as they arise.You recognize that the project is going to take a lot of time and require a lot of team pride,motivation,and commitment by all members.Which project management structure should you use in this situation?

A) Pure Project
B) Task force
C) Matrix Project
D) Functional Project
E) PERT
Question
A project starts out as which of the following?

A) A Statement of Work
B) Critical Path Method (CPM)
C) A series of milestones
D) A Gantt chart
E) A latest-start-time estimate
Question
A company must perform a maintenance project consisting of seven activities.The activities,their predecessors,and their respective time estimates are presented below:  Immediate  Activity  Designation  Predecessor  Time in Days  Break down both machines  A  None 3 Clean machine 1  B  A 3 Clean machine 2  C  A 3 Re-set machine 1  D  B 4 Re-set machine 2  E  C 2 Re-calibrate both machines  F  D and E 1 Final test  G  F 2\begin{array} { | l | l | l | l | } \hline & & \text { Immediate } & \\\hline \text { Activity } & \text { Designation } & \text { Predecessor } & \text { Time in Days } \\\hline \text { Break down both machines } & \text { A } & \text { None } & 3 \\\hline \text { Clean machine 1 } & \text { B } & \text { A } & 3 \\\hline \text { Clean machine 2 } & \text { C } & \text { A } & 3 \\\hline \text { Re-set machine 1 } & \text { D } & \text { B } & 4 \\\hline \text { Re-set machine 2 } & \text { E } & \text { C } & 2 \\\hline \text { Re-calibrate both machines } & \text { F } & \text { D and E } & 1 \\\hline \text { Final test } & \text { G } & \text { F } & 2 \\\hline\end{array}
Using CPM,which activities make up the critical path?

A) A,B,D,F,G
B) A,C,E,F,G
C) A,C,B,F,E
D) A,D,E
E) None of the above
Question
A simple project listing of five activities and their respective time estimates are presented below:  Activity  Immediate Predecessor  Time in Days  A  None 1 B  A 2 C  A 1 D  B and C 3 E  D 2\begin{array} { | l | l | l | } \hline \text { Activity } & \text { Immediate Predecessor } & \text { Time in Days } \\\hline \text { A } & \text { None } & 1 \\\hline \text { B } & \text { A } & 2 \\\hline \text { C } & \text { A } & 1 \\\hline \text { D } & \text { B and C } & 3 \\\hline \text { E } & \text { D } & 2 \\\hline\end{array}
Using CPM,which activities make up the critical path?

A) A,C,D,E
B) A,B,D,E
C) A,C,B,D,E
D) A,D,E
E) None of the above
Question
A series of projects that are organized in such a way that each project utilizes people from different functional areas is using which of the following organizational structures?

A) Matrix project
B) Integrated Task Force
C) Functional project
D) Pure project
E) Cross-functional flexible team
Question
A simple project listing of five activities,their predecessors and their respective time estimates are presented below:  Activity  Immediate Predecessor  Time in Days  A  None 3 B  A 2 C  A 1 D  B and C 3 E  D 4\begin{array} { | l | l | l | } \hline \text { Activity } & \text { Immediate Predecessor } & \text { Time in Days } \\\hline \text { A } & \text { None } & 3 \\\hline \text { B } & \text { A } & 2 \\\hline \text { C } & \text { A } & 1 \\\hline \text { D } & \text { B and C } & 3 \\\hline \text { E } & \text { D } & 4 \\\hline\end{array}
Using CPM,what is the Latest Finish Time for the last activity in this project (i.e. ,the total time to complete the project)?

A) 10 days
B) 7 days
C) 8 days
D) 12 days
E) 9 days
Question
In a Gantt chart the horizontal axis is usually which of the following?

A) Activities
B) Cost
C) Profit
D) Time
E) Milestones
Question
A company must perform a maintenance project consisting of seven activities.The activities,their predecessors,and their respective time estimates are presented below:  Immediate  Activity  Designation  Predecessor  Time in Days  Break down both machines  A  None 3 Clean machine 1  B  A 3 Clean machine 2  C  A 3 Re-set machine 1  D  B 4 Re-set machine 2  E  C 2 Re-calibrate both machines  F  D and E 1 Final test  G  F 1\begin{array} { | l | l | l | l | } \hline & & \text { Immediate } & \\\hline \text { Activity } & \text { Designation } & \text { Predecessor } & \text { Time in Days } \\\hline \text { Break down both machines } & \text { A } & \text { None } & 3 \\\hline \text { Clean machine 1 } & \text { B } & \text { A } & 3 \\\hline \text { Clean machine 2 } & \text { C } & \text { A } & 3 \\\hline \text { Re-set machine 1 } & \text { D } & \text { B } & 4 \\\hline \text { Re-set machine 2 } & \text { E } & \text { C } & 2 \\\hline \text { Re-calibrate both machines } & \text { F } & \text { D and E } & 1 \\\hline \text { Final test } & \text { G } & \text { F } & 1 \\\hline\end{array}
Using CPM,which activities have slack in this project?

A) A,B,C
B) B,D
C) Only C
D) C,E
E) F, G
Question
What is a work breakdown structure?

A) A list of the activities making up the higher levels of the project
B) A definition of the hierarchy of project tasks,subtasks,and work packages
C) A depiction of the activities making up a project
D) A Gantt chart
E) A structure that is incompatible with the Critical Path Method
Question
An advantage of a pure project where self-contained teams work full time on a project is which of the following?

A) Team members can work on several projects
B) Functional area is a "home" after the project is completed
C) There are duplicated resources
D) Lines of communication are shortened
E) Overall organizational policies and goals can be ignored
Question
For an activity in a CPM analysis the Early Finish time is 20 and the Late Finish time is 20.Which of the following statements is true?

A) The activity's late start must happen before its early start
B) The activity is on the critical path
C) The slack for this activity is 20
D) The duration of this task is zero
E) The duration of this task is 20
Question
A company must perform a maintenance project consisting of seven activities.The activities,their predecessors,and their respective time estimates are presented below:  Immediate  Activity  Designation  Predecessor  Time in Days  Break down both machines  A  None 3 Clean machine 1  B  A 3 Clean machine 2  C  A 3 Re-set machine 1  D  B 1 Re-set machine 2  E  C 2 Re-calibrate both machines  F  D and E 1 Final test  G  F 2\begin{array} { | l | l | l | l | } \hline & & \text { Immediate } & \\\hline \text { Activity } & \text { Designation } & \text { Predecessor } & \text { Time in Days } \\\hline \text { Break down both machines } & \text { A } & \text { None } & 3 \\\hline \text { Clean machine 1 } & \text { B } & \text { A } & 3 \\\hline \text { Clean machine 2 } & \text { C } & \text { A } & 3 \\\hline \text { Re-set machine 1 } & \text { D } & \text { B } & 1 \\\hline \text { Re-set machine 2 } & \text { E } & \text { C } & 2 \\\hline \text { Re-calibrate both machines } & \text { F } & \text { D and E } & 1 \\\hline \text { Final test } & \text { G } & \text { F } & 2 \\\hline\end{array}
Using CPM,what is the Latest Finish Time for the last activity in this project (i.e. ,the total time to complete the project)?

A) 9 days
B) 10 days
C) 11 days
D) 12 days
E) 13 days
Question
Some of the advantages of a functional project where the project is housed in a functional division include which of the following?

A) The project manager has full authority over the project
B) Team pride,motivation,and commitment are high
C) A team member can work on several projects
D) Needs of the client are secondary
E) None of the above
Question
PERT is an abbreviation for which of the following methodologies?

A) Product Evaluation,Result and Treatment
B) Programming and Evaluation Realization Technology
C) Program Evaluation and Review Technique
D) Process Evaluation and Review Technology
E) It is a name,not an abbreviation for anything
Question
For an activity in a CPM analysis,the Early Start time is 8 and the Late Start time is 10.Which of the following statements is true?

A) The Late Finish is 12
B) The Early Finish is 10
C) The slack for this activity is 2
D) The duration of this activity is 2
E) The activity is on the critical path
Question
You have just been assigned to oversee a series of projects.Functional areas will loan you personnel for each project and separate project managers will be responsible for separate projects.These project managers will report to you.Which project management structure is being used?

A) Pure Project
B) Task force
C) Matrix Project
D) Functional Project
E) PERT
Question
Which of the following is a graphic project report used in project management?

A) Project proposal
B) Approved project plan
C) Humphrey chart
D) Equipment and supplies chart
E) Cost and performance tracking schedule
Question
You know when you have arrived at the optimal solution in using the Time-Cost CPM Scheduling model analysis when what happens?

A) You have found the critical path
B) You have run out of crash time
C) You no longer have a linear relationship with costs
D) You have reached the minimum total cost
E) You have run out of crash costs
Question
What do the initials EVM stand for? _______________________________________
Question
You have the following time and cost information below for use in a Time-Cost CPM Scheduling model.  Activity  Normal Time  Crash Time  Normal Cost  Crash Cost  A 32$400$600 B 53$600$1200 C 41$300$1500\begin{array} { | l | l | l | l | l | } \hline \text { Activity } & \text { Normal Time } & \text { Crash Time } & \text { Normal Cost } & \text { Crash Cost } \\\hline \text { A } & 3 & 2 & \$ 400 & \$ 600 \\\hline \text { B } & 5 & 3 & \$ 600 & \$ 1200 \\\hline \text { C } & 4 & 1 & \$ 300 & \$ 1500 \\\hline\end{array}
What are the three costs per unit of time to expedite each activity?

A) A=$300,B=$200,C=$300
B) A=$100,B=$200,C=$400
C) A=$200,B=$200,C=$200
D) A=$100,B=$400,C=$300
E) A=$200,B=$300,C=$400
Question
You have collected the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the project "direct costs" are given below. You have collected the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the project direct costs are given below.   The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days the total indirect costs are $400,15 days they will be $250,14 days they will be $200,and 13 days they will be $100.If you crash this project by one day what is the total (i.e. ,direct and indirect)project cost? ____________________<div style=padding-top: 35px>
The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days the total indirect costs are $400,15 days they will be $250,14 days they will be $200,and 13 days they will be $100.If you crash this project by one day what is the total (i.e. ,direct and indirect)project cost? ____________________
Question
What is the criterion for determining whether a project activity is on the "critical path" or not?
Question
What is the most basic requirement of an EVM system? _____________________________________________________________
Question
What are "project milestones?" _________________________________________
Question
What is that sequence of activities that consume the longest amount of time in a project network of activities called? _______________________________
Question
You have collected the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the project "direct costs" are given below.  Immediate  Normal  Crash  Normal  Crash  Activity  Predecessor  Time  Time  Cost (Direct)  Cost (Direct)  A  None 32$300$400 B  A 33$100$100 C  A 11$200$200 D  B and C 32$400$550 E  D 21$500$900 F  E 33$200$200 G  F 22$100$100\begin{array} { | l | l | l | l | l | l | } \hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Predecessor } & \text { Time } & \text { Time } & \text { Cost (Direct) } & \text { Cost (Direct) } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 300 & \$ 400 \\\hline \text { B } & \text { A } & 3 & 3 & \$ 100 & \$ 100 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 200 & \$ 200 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 400 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline \text { F } & \text { E } & 3 & 3 & \$ 200 & \$ 200 \\\hline \text { G } & \text { F } & 2 & 2 & \$ 100 & \$ 100 \\\hline\end{array}
The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days the total indirect costs are $400,15 days they will be $250,14 days they will be $200,and 13 days they will be $100.If you crash this project by one day what is the total (i.e. ,direct and indirect)project cost?

A) $2,150
B) $2,300
C) $2,400
D) $2,450
E) $2,500
Question
Below are the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the costs include both direct and indirect costs.  Immediate  Normal  Crash  Normal  Crash  Activity  Predecessor  Time  Time  Cost  Cost  A  None 32$200$400 B  A 43$300$600 C  A 11$200$200 D  B and C 32$500$550 E  D 21$500$900\begin{array} { | l | l | l | l | l | l | } \hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Predecessor } & \text { Time } & \text { Time } & \text { Cost } & \text { Cost } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 200 & \$ 400 \\\hline \text { B } & \text { A } & 4 & 3 & \$ 300 & \$ 600 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 200 & \$ 200 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 500 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline\end{array}
What are the total time of this project and total normal cost?

A) Total time is 13 days,total cost is $1200
B) Total time is 12 days,total cost is $1700
C) Total time is 11 days,total cost is $1600
D) Total time is 10 days,total cost is $1750
E) Total time is 9 days,total cost is $1700
Question
You have just performed a CPM analysis and have found that more than one path through the project network has zero slack values.What can you conclude?

A) You have incorrectly performed the analysis
B) You have multiple critical paths
C) Only one path is optimal
D) More than one path is optimal
E) The project will not be completed by the desired time
Question
Below are the data for a Time-Cost CPM Scheduling analysis.The time is in days and the costs include both direct and indirect costs.  Immediate  Normal  Crash  Normal  Crash  Activity  Predecessor  Time  Time  Cost  Cost  A  None 32$200$400 B  A 43$300$600 C  A 11$200$200 D  B and C 32$500$550 E  D 21$500$900\begin{array} { | l | l | l | l | l | l | } \hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Predecessor } & \text { Time } & \text { Time } & \text { Cost } & \text { Cost } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 200 & \$ 400 \\\hline \text { B } & \text { A } & 4 & 3 & \$ 300 & \$ 600 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 200 & \$ 200 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 500 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline\end{array}
If you crash this project to reduce the total time by four days,what is the total time of the project and total cost?

A) Total time is 10 days,total cost is $2500
B) Total time is 9 days,total cost is $2300
C) Total time is 8 days,total cost is $2750
D) Total time is 8 days,total cost is $1850
Question
In CPM analysis it is generally expected that the relationship between activity direct costs and project indirect costs will be which of the following?

A) Positively related
B) Optimally related
C) Negatively related
D) Not related
E) Fractionally related
Question
Describe how CPM handles the trade-offs between time and cost in the scheduling of a project.
Question
Below are the data for a Time-Cost CPM Scheduling analysis.The time is in days and the costs include both direct and indirect costs. Below are the data for a Time-Cost CPM Scheduling analysis.The time is in days and the costs include both direct and indirect costs.   If you crash this project to reduce the total time by four days,what is the total time of the project and total cost? __________________<div style=padding-top: 35px>
If you crash this project to reduce the total time by four days,what is the total time of the project and total cost? __________________
Question
You have collected the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the project "direct costs" are given below.  Immediate  Normal  Crash  Normal  Crash  Activity  Immediate  Time  Time  Cost (Direct)  Cost (Direct)  A  None 32$300$400 B  A 33$100$100 C  A 11$200$200 D  B and C 32$400$550 E  D 21$500$900 F  E 33$200$200 G  F 22$100$100\begin{array} { | l | l | l | l | l | l | } \hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Immediate } & \text { Time } & \text { Time } & \text { Cost (Direct) } & \text { Cost (Direct) } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 300 & \$ 400 \\\hline \text { B } & \text { A } & 3 & 3 & \$ 100 & \$ 100 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 200 & \$ 200 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 400 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline \text { F } & \text { E } & 3 & 3 & \$ 200 & \$ 200 \\\hline \text { G } & \text { F } & 2 & 2 & \$ 100 & \$ 100 \\\hline\end{array}
The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days the total indirect costs are $400,15 days they will be $250,14 days they will be $200,and 13 days they will be $100.At what day do we achieve the lowest total project cost (i.e. ,direct plus indirect costs)?

A) 16 days
B) 15 days
C) 14 days
D) 13 days
E) 12 days
Question
Below are the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the costs include both direct and indirect costs.  Immediate  Normal  Crash  Normal  Crash  Activity  Predecessor  Time  Time  Cost  Cost  A  None 32$200$400 B  A 43$300$600 C  A 11$300$300 D  B and C 32$500$550 E  D 21$500$900\begin{array} { | l | l | l | l | l | l | } \hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Predecessor } & \text { Time } & \text { Time } & \text { Cost } & \text { Cost } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 200 & \$ 400 \\\hline \text { B } & \text { A } & 4 & 3 & \$ 300 & \$ 600 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 300 & \$ 300 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 500 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline\end{array}
If you crash this project to reduce the total time by one day what is the total time of the project and total cost?

A) Total time is 13 days,total cost is $1500
B) Total time is 12 days,total cost is $2000
C) Total time is 12 days,total cost is $2300
D) Total time is 11 days,total cost is $1850
E) Total time is 11 days, total cost is $2350
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/77
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 5: Projects
1
The Gantt chart is an example of a project control chart.
True
Explanation: Exhibit 5.4A is a sample Gantt chart,sometimes referred to as a bar chart,showing both the amount of time involved and the sequence in which activities can be performed.
2
A work breakdown structure is used in project management but it is not used when the critical path method is involved.
False
Explanation: Activities are identified as part of the work breakdown structure.Activities are also the essence of the Critical Path Method.Hence,the work breakdown structure is used when the critical path method is involved.
3
A matrix project attempts to blend properties of functional and pure project structures.
True
Explanation: The classic specialized organizational form,"the matrix project," attempts to blend properties of functional and pure project structures.
4
The fact that organizations are flattening is one of the reasons that project management is important.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
5
CPM is an abbreviation for Critical Path Method.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
6
In CPM the late start time estimate is the latest time you can start an activity and still keep the entire project on schedule.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
7
The critical path in a CPM analysis is always the shortest path through the network.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
8
One of the disadvantages of a pure project organizational structure is that the project manager has full authority over the project.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
9
An event unit package is a subdivision of a project.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
10
A matrix project structure is often referred to as a "skunkworks."
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
11
One of the advantages of a functional project organizational structure is that a team member can work on several projects.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
12
Upper level management must decide between pure,functional,and matrix structures as ways to organize projects.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
13
The second step in managing a project is writing the Statement of Work.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
14
A project may be defined as a series of related jobs directed toward some major output and requiring a significant period of time to perform.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
15
Slack activity time is the difference between the early start and the late finish of a project activity time.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
16
The critical path in a project is that sequence of activities that consume the longest amount of time in a project network of activities.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
17
A disadvantage of a matrix project organizational structure is that a project manager is held responsible for successful completion of the project.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
18
Complex projects are often subdivided into a series of tasks that are typically configured to be not longer than several months in duration.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
19
Project management can be defined as planning,directing,and controlling resources to meet the technical,cost,and time constraints of the project.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
20
The critical path of activities in a project is the sequence of activities that form the shortest chain in a project network of activities.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
21
The critical path in a CPM analysis is found by locating the activities times with zero slack.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
22
A project milestone is a specific event to be reached by a particular point in time.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
23
In the Time-Cost CPM model,cost is assumed to be a linear function of time.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
24
The valuations in an Earned Value Management analysis must be either profits or revenue.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
25
Derivative projects are those which address incremental changes to products or processes.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
26
A project can be subdivided into which of the following?

A) Job orders
B) Sub-jobs
C) Work Packages
D) Sub-paths
E) Events and decisions
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
27
One of the assumptions made using CPM is that project activity sequence relationships can be specified and networked.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
28
Project management software available today combines CPM and other scheduling aids,like Gantt charting,to aid in tracking progress of project completion.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
29
Calculating the early start and early finish times for each activity in a CPM analysis does not provide any useful information.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
30
The activity direct costs associated with a project might include giving workers overtime to complete a project in less-than the expected time.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
31
Using the Time-Cost CPM model,the crash time is the shortest possible time allowed for each activity in the project.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
32
Earned Value Management (EVM)has the capability to combine measurements of scope,schedule and cost in a project.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
33
One of the assumptions made using CPM is that project activities can be identified with clear beginning and ending points.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
34
In a CPM analysis if you subtract the early start from the late start the result is the activity's slack time.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
35
Earned Value Management (EVM)is a technique for measuring project progress in an objective manner.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
36
In a CPM analysis if you subtract the late finish from the early finish the result is the activity's slack time.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
37
When reducing the planned duration of a project using the Time-Cost CPM model we select the activity to crash by determining the cost of each alternative and selecting the one whose cost is the greatest.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
38
You are managing a project and need to cut the cost of the project.You decide to transfer workers to another job to cut the project's costs.Costs associated with transferring the workers are an example of project indirect costs.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
39
Breakthrough projects are those that provide fundamental improvements to existing products.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
40
The project indirect costs associated with a project include overhead,facilities,and resource opportunity costs.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
41
A listing of immediate predecessor activities is important information in a CPM analysis for which of the following reasons?

A) It specifies the relationships in the CPM network of activities
B) It provides useful timing information
C) It includes cost information
D) It is the probability information required in the final step of CPM
E) None of the above
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
42
You are looking at a chart that has the terms BCWS,BCWP and AC indicating lines on the chart.What kind of chart are you looking at?

A) Gantt Chart
B) PERT Chart
C) Bar/Milestone Chart
D) Total Program Cost Breakdown
E) EVM Chart
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
43
A simple project listing of five activities,their predecessors and their respective time estimates are presented below:  Activity  Immediate Predecessor  Time in Days  A  None 2 B  A 2 C  A 1 D  B and C 3 E  D 1\begin{array} { | l | l | l | } \hline \text { Activity } & \text { Immediate Predecessor } & \text { Time in Days } \\\hline \text { A } & \text { None } & 2 \\\hline \text { B } & \text { A } & 2 \\\hline \text { C } & \text { A } & 1 \\\hline \text { D } & \text { B and C } & 3 \\\hline \text { E } & \text { D } & 1 \\\hline\end{array}
Using the CPM,which activities have slack in this project?

A) A
B) B
C) C
D) D
E) C and E
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
44
You have been placed in charge of a large project.Shortened communication lines are required to insure quick resolution of problems as they arise.You recognize that the project is going to take a lot of time and require a lot of team pride,motivation,and commitment by all members.Which project management structure should you use in this situation?

A) Pure Project
B) Task force
C) Matrix Project
D) Functional Project
E) PERT
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
45
A project starts out as which of the following?

A) A Statement of Work
B) Critical Path Method (CPM)
C) A series of milestones
D) A Gantt chart
E) A latest-start-time estimate
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
46
A company must perform a maintenance project consisting of seven activities.The activities,their predecessors,and their respective time estimates are presented below:  Immediate  Activity  Designation  Predecessor  Time in Days  Break down both machines  A  None 3 Clean machine 1  B  A 3 Clean machine 2  C  A 3 Re-set machine 1  D  B 4 Re-set machine 2  E  C 2 Re-calibrate both machines  F  D and E 1 Final test  G  F 2\begin{array} { | l | l | l | l | } \hline & & \text { Immediate } & \\\hline \text { Activity } & \text { Designation } & \text { Predecessor } & \text { Time in Days } \\\hline \text { Break down both machines } & \text { A } & \text { None } & 3 \\\hline \text { Clean machine 1 } & \text { B } & \text { A } & 3 \\\hline \text { Clean machine 2 } & \text { C } & \text { A } & 3 \\\hline \text { Re-set machine 1 } & \text { D } & \text { B } & 4 \\\hline \text { Re-set machine 2 } & \text { E } & \text { C } & 2 \\\hline \text { Re-calibrate both machines } & \text { F } & \text { D and E } & 1 \\\hline \text { Final test } & \text { G } & \text { F } & 2 \\\hline\end{array}
Using CPM,which activities make up the critical path?

A) A,B,D,F,G
B) A,C,E,F,G
C) A,C,B,F,E
D) A,D,E
E) None of the above
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
47
A simple project listing of five activities and their respective time estimates are presented below:  Activity  Immediate Predecessor  Time in Days  A  None 1 B  A 2 C  A 1 D  B and C 3 E  D 2\begin{array} { | l | l | l | } \hline \text { Activity } & \text { Immediate Predecessor } & \text { Time in Days } \\\hline \text { A } & \text { None } & 1 \\\hline \text { B } & \text { A } & 2 \\\hline \text { C } & \text { A } & 1 \\\hline \text { D } & \text { B and C } & 3 \\\hline \text { E } & \text { D } & 2 \\\hline\end{array}
Using CPM,which activities make up the critical path?

A) A,C,D,E
B) A,B,D,E
C) A,C,B,D,E
D) A,D,E
E) None of the above
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
48
A series of projects that are organized in such a way that each project utilizes people from different functional areas is using which of the following organizational structures?

A) Matrix project
B) Integrated Task Force
C) Functional project
D) Pure project
E) Cross-functional flexible team
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
49
A simple project listing of five activities,their predecessors and their respective time estimates are presented below:  Activity  Immediate Predecessor  Time in Days  A  None 3 B  A 2 C  A 1 D  B and C 3 E  D 4\begin{array} { | l | l | l | } \hline \text { Activity } & \text { Immediate Predecessor } & \text { Time in Days } \\\hline \text { A } & \text { None } & 3 \\\hline \text { B } & \text { A } & 2 \\\hline \text { C } & \text { A } & 1 \\\hline \text { D } & \text { B and C } & 3 \\\hline \text { E } & \text { D } & 4 \\\hline\end{array}
Using CPM,what is the Latest Finish Time for the last activity in this project (i.e. ,the total time to complete the project)?

A) 10 days
B) 7 days
C) 8 days
D) 12 days
E) 9 days
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
50
In a Gantt chart the horizontal axis is usually which of the following?

A) Activities
B) Cost
C) Profit
D) Time
E) Milestones
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
51
A company must perform a maintenance project consisting of seven activities.The activities,their predecessors,and their respective time estimates are presented below:  Immediate  Activity  Designation  Predecessor  Time in Days  Break down both machines  A  None 3 Clean machine 1  B  A 3 Clean machine 2  C  A 3 Re-set machine 1  D  B 4 Re-set machine 2  E  C 2 Re-calibrate both machines  F  D and E 1 Final test  G  F 1\begin{array} { | l | l | l | l | } \hline & & \text { Immediate } & \\\hline \text { Activity } & \text { Designation } & \text { Predecessor } & \text { Time in Days } \\\hline \text { Break down both machines } & \text { A } & \text { None } & 3 \\\hline \text { Clean machine 1 } & \text { B } & \text { A } & 3 \\\hline \text { Clean machine 2 } & \text { C } & \text { A } & 3 \\\hline \text { Re-set machine 1 } & \text { D } & \text { B } & 4 \\\hline \text { Re-set machine 2 } & \text { E } & \text { C } & 2 \\\hline \text { Re-calibrate both machines } & \text { F } & \text { D and E } & 1 \\\hline \text { Final test } & \text { G } & \text { F } & 1 \\\hline\end{array}
Using CPM,which activities have slack in this project?

A) A,B,C
B) B,D
C) Only C
D) C,E
E) F, G
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
52
What is a work breakdown structure?

A) A list of the activities making up the higher levels of the project
B) A definition of the hierarchy of project tasks,subtasks,and work packages
C) A depiction of the activities making up a project
D) A Gantt chart
E) A structure that is incompatible with the Critical Path Method
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
53
An advantage of a pure project where self-contained teams work full time on a project is which of the following?

A) Team members can work on several projects
B) Functional area is a "home" after the project is completed
C) There are duplicated resources
D) Lines of communication are shortened
E) Overall organizational policies and goals can be ignored
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
54
For an activity in a CPM analysis the Early Finish time is 20 and the Late Finish time is 20.Which of the following statements is true?

A) The activity's late start must happen before its early start
B) The activity is on the critical path
C) The slack for this activity is 20
D) The duration of this task is zero
E) The duration of this task is 20
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
55
A company must perform a maintenance project consisting of seven activities.The activities,their predecessors,and their respective time estimates are presented below:  Immediate  Activity  Designation  Predecessor  Time in Days  Break down both machines  A  None 3 Clean machine 1  B  A 3 Clean machine 2  C  A 3 Re-set machine 1  D  B 1 Re-set machine 2  E  C 2 Re-calibrate both machines  F  D and E 1 Final test  G  F 2\begin{array} { | l | l | l | l | } \hline & & \text { Immediate } & \\\hline \text { Activity } & \text { Designation } & \text { Predecessor } & \text { Time in Days } \\\hline \text { Break down both machines } & \text { A } & \text { None } & 3 \\\hline \text { Clean machine 1 } & \text { B } & \text { A } & 3 \\\hline \text { Clean machine 2 } & \text { C } & \text { A } & 3 \\\hline \text { Re-set machine 1 } & \text { D } & \text { B } & 1 \\\hline \text { Re-set machine 2 } & \text { E } & \text { C } & 2 \\\hline \text { Re-calibrate both machines } & \text { F } & \text { D and E } & 1 \\\hline \text { Final test } & \text { G } & \text { F } & 2 \\\hline\end{array}
Using CPM,what is the Latest Finish Time for the last activity in this project (i.e. ,the total time to complete the project)?

A) 9 days
B) 10 days
C) 11 days
D) 12 days
E) 13 days
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
56
Some of the advantages of a functional project where the project is housed in a functional division include which of the following?

A) The project manager has full authority over the project
B) Team pride,motivation,and commitment are high
C) A team member can work on several projects
D) Needs of the client are secondary
E) None of the above
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
57
PERT is an abbreviation for which of the following methodologies?

A) Product Evaluation,Result and Treatment
B) Programming and Evaluation Realization Technology
C) Program Evaluation and Review Technique
D) Process Evaluation and Review Technology
E) It is a name,not an abbreviation for anything
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
58
For an activity in a CPM analysis,the Early Start time is 8 and the Late Start time is 10.Which of the following statements is true?

A) The Late Finish is 12
B) The Early Finish is 10
C) The slack for this activity is 2
D) The duration of this activity is 2
E) The activity is on the critical path
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
59
You have just been assigned to oversee a series of projects.Functional areas will loan you personnel for each project and separate project managers will be responsible for separate projects.These project managers will report to you.Which project management structure is being used?

A) Pure Project
B) Task force
C) Matrix Project
D) Functional Project
E) PERT
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following is a graphic project report used in project management?

A) Project proposal
B) Approved project plan
C) Humphrey chart
D) Equipment and supplies chart
E) Cost and performance tracking schedule
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
61
You know when you have arrived at the optimal solution in using the Time-Cost CPM Scheduling model analysis when what happens?

A) You have found the critical path
B) You have run out of crash time
C) You no longer have a linear relationship with costs
D) You have reached the minimum total cost
E) You have run out of crash costs
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
62
What do the initials EVM stand for? _______________________________________
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
63
You have the following time and cost information below for use in a Time-Cost CPM Scheduling model.  Activity  Normal Time  Crash Time  Normal Cost  Crash Cost  A 32$400$600 B 53$600$1200 C 41$300$1500\begin{array} { | l | l | l | l | l | } \hline \text { Activity } & \text { Normal Time } & \text { Crash Time } & \text { Normal Cost } & \text { Crash Cost } \\\hline \text { A } & 3 & 2 & \$ 400 & \$ 600 \\\hline \text { B } & 5 & 3 & \$ 600 & \$ 1200 \\\hline \text { C } & 4 & 1 & \$ 300 & \$ 1500 \\\hline\end{array}
What are the three costs per unit of time to expedite each activity?

A) A=$300,B=$200,C=$300
B) A=$100,B=$200,C=$400
C) A=$200,B=$200,C=$200
D) A=$100,B=$400,C=$300
E) A=$200,B=$300,C=$400
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
64
You have collected the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the project "direct costs" are given below. You have collected the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the project direct costs are given below.   The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days the total indirect costs are $400,15 days they will be $250,14 days they will be $200,and 13 days they will be $100.If you crash this project by one day what is the total (i.e. ,direct and indirect)project cost? ____________________
The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days the total indirect costs are $400,15 days they will be $250,14 days they will be $200,and 13 days they will be $100.If you crash this project by one day what is the total (i.e. ,direct and indirect)project cost? ____________________
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
65
What is the criterion for determining whether a project activity is on the "critical path" or not?
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
66
What is the most basic requirement of an EVM system? _____________________________________________________________
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
67
What are "project milestones?" _________________________________________
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
68
What is that sequence of activities that consume the longest amount of time in a project network of activities called? _______________________________
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
69
You have collected the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the project "direct costs" are given below.  Immediate  Normal  Crash  Normal  Crash  Activity  Predecessor  Time  Time  Cost (Direct)  Cost (Direct)  A  None 32$300$400 B  A 33$100$100 C  A 11$200$200 D  B and C 32$400$550 E  D 21$500$900 F  E 33$200$200 G  F 22$100$100\begin{array} { | l | l | l | l | l | l | } \hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Predecessor } & \text { Time } & \text { Time } & \text { Cost (Direct) } & \text { Cost (Direct) } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 300 & \$ 400 \\\hline \text { B } & \text { A } & 3 & 3 & \$ 100 & \$ 100 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 200 & \$ 200 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 400 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline \text { F } & \text { E } & 3 & 3 & \$ 200 & \$ 200 \\\hline \text { G } & \text { F } & 2 & 2 & \$ 100 & \$ 100 \\\hline\end{array}
The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days the total indirect costs are $400,15 days they will be $250,14 days they will be $200,and 13 days they will be $100.If you crash this project by one day what is the total (i.e. ,direct and indirect)project cost?

A) $2,150
B) $2,300
C) $2,400
D) $2,450
E) $2,500
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
70
Below are the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the costs include both direct and indirect costs.  Immediate  Normal  Crash  Normal  Crash  Activity  Predecessor  Time  Time  Cost  Cost  A  None 32$200$400 B  A 43$300$600 C  A 11$200$200 D  B and C 32$500$550 E  D 21$500$900\begin{array} { | l | l | l | l | l | l | } \hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Predecessor } & \text { Time } & \text { Time } & \text { Cost } & \text { Cost } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 200 & \$ 400 \\\hline \text { B } & \text { A } & 4 & 3 & \$ 300 & \$ 600 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 200 & \$ 200 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 500 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline\end{array}
What are the total time of this project and total normal cost?

A) Total time is 13 days,total cost is $1200
B) Total time is 12 days,total cost is $1700
C) Total time is 11 days,total cost is $1600
D) Total time is 10 days,total cost is $1750
E) Total time is 9 days,total cost is $1700
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
71
You have just performed a CPM analysis and have found that more than one path through the project network has zero slack values.What can you conclude?

A) You have incorrectly performed the analysis
B) You have multiple critical paths
C) Only one path is optimal
D) More than one path is optimal
E) The project will not be completed by the desired time
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
72
Below are the data for a Time-Cost CPM Scheduling analysis.The time is in days and the costs include both direct and indirect costs.  Immediate  Normal  Crash  Normal  Crash  Activity  Predecessor  Time  Time  Cost  Cost  A  None 32$200$400 B  A 43$300$600 C  A 11$200$200 D  B and C 32$500$550 E  D 21$500$900\begin{array} { | l | l | l | l | l | l | } \hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Predecessor } & \text { Time } & \text { Time } & \text { Cost } & \text { Cost } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 200 & \$ 400 \\\hline \text { B } & \text { A } & 4 & 3 & \$ 300 & \$ 600 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 200 & \$ 200 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 500 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline\end{array}
If you crash this project to reduce the total time by four days,what is the total time of the project and total cost?

A) Total time is 10 days,total cost is $2500
B) Total time is 9 days,total cost is $2300
C) Total time is 8 days,total cost is $2750
D) Total time is 8 days,total cost is $1850
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
73
In CPM analysis it is generally expected that the relationship between activity direct costs and project indirect costs will be which of the following?

A) Positively related
B) Optimally related
C) Negatively related
D) Not related
E) Fractionally related
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
74
Describe how CPM handles the trade-offs between time and cost in the scheduling of a project.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
75
Below are the data for a Time-Cost CPM Scheduling analysis.The time is in days and the costs include both direct and indirect costs. Below are the data for a Time-Cost CPM Scheduling analysis.The time is in days and the costs include both direct and indirect costs.   If you crash this project to reduce the total time by four days,what is the total time of the project and total cost? __________________
If you crash this project to reduce the total time by four days,what is the total time of the project and total cost? __________________
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
76
You have collected the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the project "direct costs" are given below.  Immediate  Normal  Crash  Normal  Crash  Activity  Immediate  Time  Time  Cost (Direct)  Cost (Direct)  A  None 32$300$400 B  A 33$100$100 C  A 11$200$200 D  B and C 32$400$550 E  D 21$500$900 F  E 33$200$200 G  F 22$100$100\begin{array} { | l | l | l | l | l | l | } \hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Immediate } & \text { Time } & \text { Time } & \text { Cost (Direct) } & \text { Cost (Direct) } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 300 & \$ 400 \\\hline \text { B } & \text { A } & 3 & 3 & \$ 100 & \$ 100 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 200 & \$ 200 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 400 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline \text { F } & \text { E } & 3 & 3 & \$ 200 & \$ 200 \\\hline \text { G } & \text { F } & 2 & 2 & \$ 100 & \$ 100 \\\hline\end{array}
The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days the total indirect costs are $400,15 days they will be $250,14 days they will be $200,and 13 days they will be $100.At what day do we achieve the lowest total project cost (i.e. ,direct plus indirect costs)?

A) 16 days
B) 15 days
C) 14 days
D) 13 days
E) 12 days
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
77
Below are the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the costs include both direct and indirect costs.  Immediate  Normal  Crash  Normal  Crash  Activity  Predecessor  Time  Time  Cost  Cost  A  None 32$200$400 B  A 43$300$600 C  A 11$300$300 D  B and C 32$500$550 E  D 21$500$900\begin{array} { | l | l | l | l | l | l | } \hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Predecessor } & \text { Time } & \text { Time } & \text { Cost } & \text { Cost } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 200 & \$ 400 \\\hline \text { B } & \text { A } & 4 & 3 & \$ 300 & \$ 600 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 300 & \$ 300 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 500 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline\end{array}
If you crash this project to reduce the total time by one day what is the total time of the project and total cost?

A) Total time is 13 days,total cost is $1500
B) Total time is 12 days,total cost is $2000
C) Total time is 12 days,total cost is $2300
D) Total time is 11 days,total cost is $1850
E) Total time is 11 days, total cost is $2350
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 77 flashcards in this deck.