Deck 8: Facility and Work Design
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/78
Play
Full screen (f)
Deck 8: Facility and Work Design
1
Product layouts offer higher flexibility with low productivity and process layouts have limited flexibility with high productivity.
False
2
In a product layout, a breakdown of one piece of equipment will not cause the entire process to shut down.
False
3
The facility layout in a library would most likely be a process layout.
True
4
Cycle time is related to the output rate and the available time to produce output.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
5
Cellular layouts are designed according to the functional characteristics of equipment much in the same fashion as process layouts.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
6
Flow-blocking and lack-of-work delays can be reduced by assigning an appropriate level of capacity at each workstation.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
7
Services such as legal and medical specialties employ cellular-type layouts as do manufacturers.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
8
Product layouts are less flexible than process layouts.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
9
The predominant layout type used in hospitals is the fixed-position layout.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
10
A fixed position layout is based on the sequence of operations that is performed during the manufacturing of a good or delivery of a service.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
11
Facility layout is not only concerned with the arrangement of physical facilities, but also the material handling capabilities within the facility.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
12
The objective of assembly line balancing is to group tasks among workstations so that the amount of work assigned to each workstation is highly variable, thus maximizing flexibility.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
13
Process layouts generally require less investment in equipment than product layouts because the equipment is less specialized.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
14
Workers in cellular layouts generally have greater responsibilities than those who work in product or process layouts.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
15
Cycle time should be smaller than the largest operation time.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
16
Cycle time in assembly line balancing is the maximum amount of time it takes to process a part at some workstation along the line.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
17
An assembly line is a type of product layout.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
18
Changes in goods and services for a firm's customer benefit package do not impact facility layouts.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
19
In a perfectly balanced assembly line, no bottlenecks exist.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
20
In a product layout such as an assembly line, a flow blocking delay occurs whenever one stage completes work and no units from the previous stage are waiting processing.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
21
Because of precedence relationships, assembly-line efficiencies will generally be very high.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
22
Teams are a way of accomplishing job enrichment.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
23
Ergonomics is the science that is concerned with determining specific job tasks and responsibilities.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
24
ALDEP is a process layout technique that focuses on materials handling costs as the primary solution.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
25
A ____ layout is an arrangement based on the sequence of operations that are performed during the manufacturing of a good or the delivery of a service.
A)Product
B)Process
C)Cellular
D)Fixed position
A)Product
B)Process
C)Cellular
D)Fixed position
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following is not a common reason for facility layout studies?
A)There is significant change in demand or throughput volume.
B)A new good or service is introduced to the customer benefit package.
C)A new material supplier is used.
D)Different process, equipment and/or technology are installed.
A)There is significant change in demand or throughput volume.
B)A new good or service is introduced to the customer benefit package.
C)A new material supplier is used.
D)Different process, equipment and/or technology are installed.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
27
A line balancing solution has been developed for the assembly line for fertilizer spreaders at Green Grass, Inc.The desired output rate of 30 spreaders per hour will be achieved.The sum of times for all tasks performed on the line is 1200 seconds for each spreader assembled.Which of the following statements must be true?
A)The cycle time is 30 seconds per spreader.
B)The theoretical minimum number of work stations is 10.
C)If the solution calls for 12 stations, the efficiency is 80%.
D)If the solution calls for 11 stations, the efficiency is 80%.
A)The cycle time is 30 seconds per spreader.
B)The theoretical minimum number of work stations is 10.
C)If the solution calls for 12 stations, the efficiency is 80%.
D)If the solution calls for 11 stations, the efficiency is 80%.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
28
Which is true for product layout?
A)Very flexible
B)Lower work-in-process inventories
C)High job satisfaction
D)Easy to add new products
A)Very flexible
B)Lower work-in-process inventories
C)High job satisfaction
D)Easy to add new products
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
29
Self-managed teams perform entire jobs, rather than specialized assembly-line work.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
30
Job enlargement approaches give workers more variety of work, but not necessarily more responsibility.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
31
A ____ layout consists of a functional grouping of equipment or activities that do similar work.
A)Product
B)Process
C)Cellular
D)Fixed position
A)Product
B)Process
C)Cellular
D)Fixed position
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
32
A ____ layout is an arrangement based on self-contained groups of equipment needed to produce a particular set of goods or services.
A)Product
B)Process
C)Cellular
D)Fixed position
A)Product
B)Process
C)Cellular
D)Fixed position
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
33
CRAFT is a process layout technique that tries to improve on a current solution by exchanging two or three departments at a time to determine if total materials handling costs have been reduced.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
34
All of the following are common objectives of layout studies except
A)Minimize delays in materials handling and customer movement
B)Minimize the number of workstations
C)Provide for good housekeeping and maintenance
D)Maintain flexibility
A)Minimize delays in materials handling and customer movement
B)Minimize the number of workstations
C)Provide for good housekeeping and maintenance
D)Maintain flexibility
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
35
A Gallup study showed that workers who are allowed to personalize their workplaces were no more productive than those who are not allowed.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
36
An assembly line with 28 operations is to be balanced.The total amount of time required for all 28 operations is 39 minutes.The longest operation takes 2.2 minutes and the shortest takes 0.8 minutes.The line will operate for 450 minutes per day.
1. Determine the minimum and maximum cycle time.
2. What is the output rate if the cycle time is set at 2.2 minutes?
A)min cycle time = 0.8; max cycle time = 39; output rate = 204.5
B)min cycle time = 2.2; max cycle time = 39; output rate = 204.5
C)min cycle time = 2.2; max cycle time = 31.2; output rate = 562.5
D)min cycle time = 0.8; max cycle time = 2.2; output rate = 562.5
1. Determine the minimum and maximum cycle time.
2. What is the output rate if the cycle time is set at 2.2 minutes?
A)min cycle time = 0.8; max cycle time = 39; output rate = 204.5
B)min cycle time = 2.2; max cycle time = 39; output rate = 204.5
C)min cycle time = 2.2; max cycle time = 31.2; output rate = 562.5
D)min cycle time = 0.8; max cycle time = 2.2; output rate = 562.5
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
37
Virtual teams are empowered work teams that assume many traditional management responsibilities.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
38
The typical layout of facilities in a hospital would be an example of a ____ layout.
A)Product
B)Process
C)Cellular
D)Fixed position
A)Product
B)Process
C)Cellular
D)Fixed position
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
39
Assembly line balancing problems involving many distinct products (mixed-model line balancing) are generally easier to solve than single-model balancing problems because there are more alternatives available to assign tasks to workstations.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
40
The production of large goods such as airplanes is best accomplished using a ____ layout.
A)Product
B)Process
C)Cellular
D)Fixed position
A)Product
B)Process
C)Cellular
D)Fixed position
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
41
____ is vertical expansion of job duties to give the worker more responsibility.
A)Job enlargement
B)Job rotation
C)Job enrichment
D)Job design
A)Job enlargement
B)Job rotation
C)Job enrichment
D)Job design
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
42
The determination of specific job tasks and responsibilities is called ____.
A)Job design
B)Ergonomics
C)Job enlargement
D)Job enrichment
A)Job design
B)Ergonomics
C)Job enlargement
D)Job enrichment
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following is not a disadvantage of virtual teams?
A)Security
B)Working hours
C)Synchronizing calendars
D)Socialization
A)Security
B)Working hours
C)Synchronizing calendars
D)Socialization
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
44
For a given cycle time in line balancing, assembly-line efficiency can be increased by
A)Speeding the line
B)Slowing the line
C)Decreasing the number of work stations
D)Increasing the number of work stations
A)Speeding the line
B)Slowing the line
C)Decreasing the number of work stations
D)Increasing the number of work stations
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
45
A(n) ____ performs entire jobs rather than specialized, assembly line work.
A)Virtual team
B)Self-managed team
C)Natural work team
D)Ergonomic team
A)Virtual team
B)Self-managed team
C)Natural work team
D)Ergonomic team
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
46
Considering ergonomics, which of the following does not fit?
A)Improving productivity
B)Group technology
C)Designing equipment and instrumentation
D)Considering physical capability of people
A)Improving productivity
B)Group technology
C)Designing equipment and instrumentation
D)Considering physical capability of people
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
47
Which is not true regarding fixed-position layout?
A)Synonymous with project
B)High demand volume
C)An example is a sporting event
D)Used with large items
A)Synonymous with project
B)High demand volume
C)An example is a sporting event
D)Used with large items
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
48
Which one of the following fits best with process layout?
A)Skilled workers
B)Standardization
C)Specialized equipment
D)Little work-in-process inventories
A)Skilled workers
B)Standardization
C)Specialized equipment
D)Little work-in-process inventories
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
49
____ classifies parts into families so that cellular layouts can be effectively used.
A)Ergonomics
B)Job enlargement
C)Group technology
D)CRAFT
A)Ergonomics
B)Job enlargement
C)Group technology
D)CRAFT
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
50
Discuss four reasons for conducting a facility-layout study.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
51
____ set their own goals and inspect their own work, often hire their own replacements and prepare their own budgets.
A)Virtual teams
B)Enlarged teams
C)Socio-technical teams
D)Self-managed teams
A)Virtual teams
B)Enlarged teams
C)Socio-technical teams
D)Self-managed teams
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following is not a common approach for designing process layouts?
A)CRAFT
B)ALDEP
C)NIOSH
D)CORELAP
A)CRAFT
B)ALDEP
C)NIOSH
D)CORELAP
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
53
Differentiate among product layout, process layout, cellular layout, and fixed-position layout.State the advantages and disadvantages of each.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
54
Assembly line balancing
A)Is a one-time activity.
B)Tries to minimize the production rate for a given number of work stations.
C)Tries to minimize the number of work stations for a given production rate.
D)Attempts to load work into early work stations.
A)Is a one-time activity.
B)Tries to minimize the production rate for a given number of work stations.
C)Tries to minimize the number of work stations for a given production rate.
D)Attempts to load work into early work stations.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
55
All of the following are true regarding assembly lines except
A)Lower cost
B)Only one model can be assembled on a line
C)Makes good affordable to mass markets
D)Used in services,e.g., insurance policies and sorting mail
A)Lower cost
B)Only one model can be assembled on a line
C)Makes good affordable to mass markets
D)Used in services,e.g., insurance policies and sorting mail
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
56
Differentiate between a "flow blocking delay" and a "lack of work delay." How can each be reduced?
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
57
All of the following are limitations to process layout except
A)Higher movement and transportation costs
B)More complicated planning and control systems
C)Longer total processing time
D)Limited range of products
A)Higher movement and transportation costs
B)More complicated planning and control systems
C)Longer total processing time
D)Limited range of products
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
58
Explain assembly line balancing.Discuss the three types of information needed to balance an assembly line.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
59
Describe approaches used for process layout design.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
60
Which type of layout is best for high volumes of demand with few if any setups/changeovers?
A)Product
B)Process
C)Cellular
D)Fixed position
A)Product
B)Process
C)Cellular
D)Fixed position
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
61
The eleven tasks necessary to assemble an MP3 player along with their time (in seconds) and immediate predecessor(s) is given below:
Using this information, determine the theoretical minimum number of work stations needed if the company wants to produce 600 units in a 9-hour (32,400 seconds) day.

Using this information, determine the theoretical minimum number of work stations needed if the company wants to produce 600 units in a 9-hour (32,400 seconds) day.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
62
Explain the role of ergonomics in job design.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
63
Discuss the advantages and disadvantages of utilizing virtual teams.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
64
A company is setting up an assembly line to produce cellular telephones.They intend to use line balancing with the longest-task-time heuristic.They know the demand per hour is 40 phones and the productive time per hour is 54 minutes.Displayed below is the data they have collected regarding task precedence and times.
a.What is the cycle time?
b.What is the theoretical minimum number of workstations?
c.What tasks are assigned to the first workstation?
d.How many workstations are needed for the entire line?
e.What is the assembly-line efficiency?

a.What is the cycle time?
b.What is the theoretical minimum number of workstations?
c.What tasks are assigned to the first workstation?
d.How many workstations are needed for the entire line?
e.What is the assembly-line efficiency?
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
65
A product requires the following tasks to make it on an assembly line.Assume 7.6 hours per workday and 5 workdays per week.
a.Using only the information given, what would be the maximum output per day that can be achieved?
b.Assume that the activities have been assigned to five workstations.What is the line efficiency for a cycle time of 40 seconds?

a.Using only the information given, what would be the maximum output per day that can be achieved?
b.Assume that the activities have been assigned to five workstations.What is the line efficiency for a cycle time of 40 seconds?
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
66
Explain the socio-technical approach to job design and some ways to implement it.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
67
For the following assembly line data, balance the line for an output of 30 units in a 7.5 hour shift.Use the "longest task time first" rule.

Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
68
The twelve tasks necessary to assemble a food blender are listed below.The time to perform each task and the tasks that must immediately precede are also listed.200 blenders are needed per hour and 50 minutes per hour are productive:
a.Compute the cycle time per unit in minutes.
b.Compute the minimum number of workstations required.
c.Use the longest-task-time heuristic to balance the assembly line.
d.Compute the efficiency of your assembly line.

a.Compute the cycle time per unit in minutes.
b.Compute the minimum number of workstations required.
c.Use the longest-task-time heuristic to balance the assembly line.
d.Compute the efficiency of your assembly line.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
69
An assembly line with 28 activities is to be balanced.The total amount of time required for all 28 activities is 39 minutes.The longest activity is 2.2 minutes and the shortest is 0.8 minutes.The line will operate for 450 minutes per day.What is the assembly line efficiency with 11 stations and a product produced every 5 minutes?
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
70
A small electronics company assembles power supplies for use in computers, printers and Fax machines.They want to set up an assembly line to make their operation more efficient and plan to use line balancing with the longest-task-time heuristic.The demand for power supplies is 70 per hour, and the productive time per hour is 52 minutes.The following table provides details on their operation.
a.What is the cycle time?
b.What is the theoretical minimum number of workstations?
c.What tasks go into the first workstation?
d.How many workstations are needed for the entire line?
e.What is the assembly-line efficiency?

a.What is the cycle time?
b.What is the theoretical minimum number of workstations?
c.What tasks go into the first workstation?
d.How many workstations are needed for the entire line?
e.What is the assembly-line efficiency?
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
71
An assembly line with 28 activities is to be balanced.The total amount of time required for all 28 activities is 39 minutes.The longest activity is 2.2 minutes and the shortest is 0.8 minutes.The line will operate for 450 minutes per day.Using a cycle time of 60 seconds, determine an assembly line balance by selecting the longest task available.Compute the total idle time, and assembly line efficiency.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
72
Consider the following assembly line information for manufacturing the latest cell phone.
The firm wants to produce 80 cell phones per hour.
a.What is the required cycle time?
b.Balance the assembly line using your choice of balancing heuristic, with the goal of minimizing the number of workstations needed? (Specify the task(s) assigned to each workstation.)
c.What is the efficiency of your assembly line?
d.Is this a good assembly line balancing solution? Explain.What do you recommend?

a.What is the required cycle time?
b.Balance the assembly line using your choice of balancing heuristic, with the goal of minimizing the number of workstations needed? (Specify the task(s) assigned to each workstation.)
c.What is the efficiency of your assembly line?
d.Is this a good assembly line balancing solution? Explain.What do you recommend?
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
73
An assembly line with 28 operations is to be balanced.The total amount of time required for all 28 operations is 39 minutes.The longest operation takes 2.2 minutes and the shortest takes 0.8 minutes.The line will operate for 450 minutes per day.
a.Determine the minimum and maximum cycle time.
b.What is the maximum output rate that this assembly line can achieve?
c.What is the output rate if the cycle time is set at 2.2 minutes?
a.Determine the minimum and maximum cycle time.
b.What is the maximum output rate that this assembly line can achieve?
c.What is the output rate if the cycle time is set at 2.2 minutes?
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
74
In your first job you must set up an assembly line to assemble a computer mouse.The precedence diagram below is defined with task times in parentheses and stated in minutes.There are 480 minutes of assembly time per shift and there is one shift.The forecast (output rate) is 60 units per shift.
a.Compute the cycle time per unit in minutes.
b.Compute the minimum number of workstations required.
c.Use the longest-task-time heuristic to balance the assembly line.
d.Compute the efficiency of your assembly line.

a.Compute the cycle time per unit in minutes.
b.Compute the minimum number of workstations required.
c.Use the longest-task-time heuristic to balance the assembly line.
d.Compute the efficiency of your assembly line.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
75
An assembly line with 28 activities is to be balanced.The total amount of time required for all 28 activities is 39 minutes.The line will operate for 450 minutes per day.What must the cycle time be to achieve an output rate of 400 units/day?
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
76
List the many questions that must be addressed in designing a workstation.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
77
The Florida Appliance Company is installing an assembly line to produce vacuum cleaners, and you, as an operations manager, are responsible for balancing the line.The tasks to be performed are listed, along with their times and immediate predecessors.
The company is planning to operate 2 shifts per day, 8 hours per shift.The desired output rate of the line is 480 units per day.
a.Compute the cycle time per unit in minutes.
b.Compute the minimum number of workstations required.
c.Use the longest-task-time heuristic to balance the assembly line.
d.Compute the efficiency of your assembly line.

a.Compute the cycle time per unit in minutes.
b.Compute the minimum number of workstations required.
c.Use the longest-task-time heuristic to balance the assembly line.
d.Compute the efficiency of your assembly line.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
78
The nine tasks necessary to assemble a vacuum cleaner are listed below.The time to perform each task and the tasks that must immediately precede are also listed.300 vacuums are needed per hour and 50 minutes per hour are productive.
a.Compute the cycle time per unit in minutes.
b.Compute the minimum number of workstations required.
c.Use the longest-task-time heuristic to balance the production line.
d.Compute the efficiency of the assembly line.

a.Compute the cycle time per unit in minutes.
b.Compute the minimum number of workstations required.
c.Use the longest-task-time heuristic to balance the production line.
d.Compute the efficiency of the assembly line.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck