Deck 17: Scheduling

Full screen (f)
exit full mode
Question
The longest processing time (LPT)rule tends to complete larger jobs in-house when subcontracting is anticipated.
Use Space or
up arrow
down arrow
to flip the card.
Question
Minimizing overtime is one of several objectives that could be considered when constructing a schedule.
Question
The first-come,first-served (FCFS)sequencing rule should be only used when operating at high levels of capacity.
Question
The time required for a job to move through the system is referred to as flow time.
Question
The process of assigning work to limited resources is known as scheduling.
Question
Gantt charts show the planned and yet to be completed activities against total activities.
Question
Scheduling is considered the last stage of the planning process.
Question
Managers typically use multiple objective when constructing a schedule.
Question
The sequence in which jobs should be processed is determined using linear programming.
Question
Sequencing involves determining the order in which jobs are released to the shop floor.
Question
Determining the optimal allocation of jobs to machines or workers can be solved using the assignment method of linear programming.
Question
Johnson's rule gives an optimal sequence for jobs processed serially through a two step system.
Question
The process of prioritizing jobs that have been assigned to a resource is called sequencing.
Question
Job shop scheduling is usually performed by skilled machine operators.
Question
Increasing the capacity of a work center that is a bottleneck increases output.
Question
The shortest processing time (SPT)rule is most useful when the job shop is not congested.
Question
The wide variety of jobs in a job shop makes scheduling difficult.
Question
All sequencing rules strive to optimize both processing efficiency and due date performance.
Question
Scheduling specifies when labor,equipment and facilities are needed to produce a product.
Question
Finite scheduling will not load a resource beyond its fixed capacity.
Question
The time required to complete a group of jobs is referred to as

A)flow time.
B)makespan.
C)completion time.
D)none of the above.
Question
The assignment method of linear programming can be used for both loading and employee scheduling.
Question
Scheduling using the theory of constraints (TOC)requires that process batch sizes and transfer batch sizes always match.
Question
With drum-buffer-rope (DBR)the bottleneck resource is always the buffer.
Question
Typically,there are more options available when scheduling employees because labor is a very flexible resource.
Question
The sequencing rule that minimizes average tardiness for a set of jobs to be processed on one machine is

A)first-come-first served (FCFS).
B)longest processing time (LPT)
C)shortest process time (SPT)
D)due date (DDATE).
Question
The theory of constraints (TOC)approach to scheduling concentrates on scheduling the bottleneck resources.
Question
If the work remaining is greater than the time remaining,the critical ratio (CR)will be

A)less than one.
B)greater than one.
C)equal to one.
D)none of the above.
Question
If the following jobs are sequenced according to the first-come-first-served (FCFS)rule then the mean completion time in days for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the first-come-first-served (FCFS)rule then the mean completion time in days for all jobs is (assume zero for today's date)  </strong> A)33 days. B)22 days. C)6.6 days. D)4.4 days. <div style=padding-top: 35px>

A)33 days.
B)22 days.
C)6.6 days.
D)4.4 days.
Question
Which of the following is not typically considered an objective of scheduling?

A)minimizing job lateness
B)maximizing time in the system
C)minimizing overtime
D)maximizing machine utilization
Question
Tardiness is defined as the difference between a job's flow time and makespan.
Question
The process of assigning work to limited resources is known as

A)loading.
B)sequencing.
C)monitoring.
D)dispatching
Question
The process of prioritizing jobs that have been assigned to a resource is called

A)loading.
B)monitoring.
C)sequencing.
D)input/output analysis.
Question
The scheduling function for mass production and job shop production are basically the same.
Question
Job shop scheduling is also known as shop floor control.
Question
Input/output control provides the information necessary to regulate work flow in a job shop environment.
Question
In a job shop environment the process of prioritizing jobs assigned to a productive resource is called sequencing.
Question
The dispatch list contains the order in which work is assigned to a productive resource.
Question
If a job is ahead of schedule,then its critical ratio (CR)will be

A)less than one.
B)greater than one.
C)equal to one.
D)none of the above.
Question
The sequencing rule that will minimize average job completion time for a set number of jobs to be processed on one machine is

A)first-come-first served (FCFS).
B)longest processing time (LPT).
C)shortest process time (SPT).
D)due date (DDATE).
Question
If the following jobs are sequenced according to the LPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the LPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)118 days. B)6.6 days. C)33 days. D)23.6 days <div style=padding-top: 35px>

A)118 days.
B)6.6 days.
C)33 days.
D)23.6 days
Question
If the following jobs are sequenced according to the DDATE rule then the mean completion time (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the DDATE rule then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)16.4 days. B)22.6 days. C)28.7 days. D)33.0 days <div style=padding-top: 35px>

A)16.4 days.
B)22.6 days.
C)28.7 days.
D)33.0 days
Question
If the following jobs are sequenced according to the LPT rule then the total number of jobs that would be late is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the LPT rule then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)5 jobs. B)4 jobs. C)3 jobs. D)2 jobs. <div style=padding-top: 35px>

A)5 jobs.
B)4 jobs.
C)3 jobs.
D)2 jobs.
Question
If the following jobs are sequenced according to the SLACK rule then the maximum job tardiness (in days)is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SLACK rule then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)20 days. B)12 days. C)10 days. D)7 days <div style=padding-top: 35px>

A)20 days.
B)12 days.
C)10 days.
D)7 days
Question
If the following jobs are sequenced according to the SPT rule then job B is completed on day (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SPT rule then job B is completed on day (assume zero for today's date)  </strong> A)6. B)14. C)15. D)22 <div style=padding-top: 35px>

A)6.
B)14.
C)15.
D)22
Question
If the following jobs are sequenced according to the SPT rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SPT rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)16 days. B)13 days. C)5.2 days. D)3.2 days <div style=padding-top: 35px>

A)16 days.
B)13 days.
C)5.2 days.
D)3.2 days
Question
If the following jobs are sequenced according to the SLACK rule then the total number of jobs that would be late is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SLACK rule then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)1 jobs. B)2 jobs. C)3 jobs D)4 jobs <div style=padding-top: 35px>

A)1 jobs.
B)2 jobs.
C)3 jobs
D)4 jobs
Question
If the following jobs are sequenced according to the SPT rule then the maximum job tardiness (in days)is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SPT rule then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)26 days B)16 days C)10 days D)5.2 days <div style=padding-top: 35px>

A)26 days
B)16 days
C)10 days
D)5.2 days
Question
If the following jobs are sequenced according to the FCFS rule then the maximum job tardiness (in days)is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the FCFS rule then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)0 days. B)8 days. C)20 days. D)25 days. <div style=padding-top: 35px>

A)0 days.
B)8 days.
C)20 days.
D)25 days.
Question
If the following jobs are sequenced according to the SPT rule then the total number of jobs that would be late is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SPT rule then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)0 jobs. B)1 job. C)2 jobs. D)3 jobs. <div style=padding-top: 35px>

A)0 jobs.
B)1 job.
C)2 jobs.
D)3 jobs.
Question
If the following jobs are sequenced according to the FCFS rule then the mean tardiness (in days)for all jobs would be (assume zero for today's date)
<strong>If the following jobs are sequenced according to the FCFS rule then the mean tardiness (in days)for all jobs would be (assume zero for today's date)  </strong> A)5 days. B)8.33 days. C)10.6 days. D)25 days <div style=padding-top: 35px>

A)5 days.
B)8.33 days.
C)10.6 days.
D)25 days
Question
If the following jobs are sequenced according to the SLACK rule then the mean completion time (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SLACK rule then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)35 days. B)20.8 days. C)18.4 days. D)7 days. <div style=padding-top: 35px>

A)35 days.
B)20.8 days.
C)18.4 days.
D)7 days.
Question
If the following jobs are sequenced according to the FCFS rule then the total number of jobs that would be late is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the FCFS rule then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)4. B)3. C)2. D)1. <div style=padding-top: 35px>

A)4.
B)3.
C)2.
D)1.
Question
If the following jobs are sequenced according to the SLACK rule then job A would be completed on day (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SLACK rule then job A would be completed on day (assume zero for today's date)  </strong> A)8. B)7. C)15. D)12. <div style=padding-top: 35px>

A)8.
B)7.
C)15.
D)12.
Question
If the following jobs are sequenced according to the SLACK rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SLACK rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)11.25 days. B)9 days. C)20 days. D)12.5 days. <div style=padding-top: 35px>

A)11.25 days.
B)9 days.
C)20 days.
D)12.5 days.
Question
If the following jobs are sequenced according to the SPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)6.6 days. B)16 days. C)22 days. D)33 days. <div style=padding-top: 35px>

A)6.6 days.
B)16 days.
C)22 days.
D)33 days.
Question
If the following jobs are sequenced according to the LPT rule then the maximum job tardiness (in days)is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the LPT rule then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)7 days. B)10 days. C)20 days. D)25 days. <div style=padding-top: 35px>

A)7 days.
B)10 days.
C)20 days.
D)25 days.
Question
If the following jobs are sequenced according to the LPT rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the LPT rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)62 days. B)12.4 days. C)15.5 days. D)25 days <div style=padding-top: 35px>

A)62 days.
B)12.4 days.
C)15.5 days.
D)25 days
Question
If the following jobs are sequenced according to the FCFS rule then job C is completed on day (assume zero for today's date)
<strong>If the following jobs are sequenced according to the FCFS rule then job C is completed on day (assume zero for today's date)  </strong> A)11. B)17. C)25. D)30 <div style=padding-top: 35px>

A)11.
B)17.
C)25.
D)30
Question
If the following jobs are sequenced according to the LPT rule then job D would be completed on day (assume zero for today's date )
<strong>If the following jobs are sequenced according to the LPT rule then job D would be completed on day (assume zero for today's date )  </strong> A)5. B)25. C)30. D)33. <div style=padding-top: 35px>

A)5.
B)25.
C)30.
D)33.
Question
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
<strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   The minimum time required to complete all the products is</strong> A)29 minutes. B)27 minutes. C)33 minutes. D)36 minutes. <div style=padding-top: 35px>
The minimum time required to complete all the products is

A)29 minutes.
B)27 minutes.
C)33 minutes.
D)36 minutes.
Question
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
<strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 1 is assigned to</strong> A)machine A B)machine B C)machine C D)machine D <div style=padding-top: 35px>
If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 1 is assigned to

A)machine A
B)machine B
C)machine C
D)machine D
Question
A ________ chart is used to show both planned and completed activities against a time scale.

A)Gantt
B)Dispatch
C)Sequencing
D)None of the above.
Question
If the following jobs are sequenced according to the DDATE rule then the total number of jobs that would be late is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the DDATE rule then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)5 jobs. B)4 jobs. C)3 jobs. D)2 jobs. <div style=padding-top: 35px>

A)5 jobs.
B)4 jobs.
C)3 jobs.
D)2 jobs.
Question
If the following jobs are sequenced according to the DDATE rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the DDATE rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)9.0 days. B)5.4 days. C)3.2 days. D)2.8 days <div style=padding-top: 35px>

A)9.0 days.
B)5.4 days.
C)3.2 days.
D)2.8 days
Question
List some of the objectives in scheduling.
Question
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
<strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to</strong> A)machine A. B)machine B. C)machine C. D)machine D. <div style=padding-top: 35px>
If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to

A)machine A.
B)machine B.
C)machine C.
D)machine D.
Question
If the following jobs are sequenced according to the DDATE rule then job A would be completed on day (assume zero for today's date)
<strong>If the following jobs are sequenced according to the DDATE rule then job A would be completed on day (assume zero for today's date)  </strong> A)8. B)12. C)16. D)22 <div style=padding-top: 35px>

A)8.
B)12.
C)16.
D)22
Question
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job C would start processing on operation 2 at
<strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job C would start processing on operation 2 at  </strong> A)hour 13. B)hour 26. C)hour 47. D)hour 53 <div style=padding-top: 35px>

A)hour 13.
B)hour 26.
C)hour 47.
D)hour 53
Question
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
<strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management assigns products to machines so that the total time to complete all jobs is minimized,then the time to complete Product 1 is</strong> A)10 minutes. B)9 minutes. C)16 minutes. D)12 minutes <div style=padding-top: 35px>
If management assigns products to machines so that the total time to complete all jobs is minimized,then the time to complete Product 1 is

A)10 minutes.
B)9 minutes.
C)16 minutes.
D)12 minutes
Question
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is
<strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is  </strong> A)42 hours. B)53 hours. C)90 hours. D)95 hours. <div style=padding-top: 35px>

A)42 hours.
B)53 hours.
C)90 hours.
D)95 hours.
Question
Why is monitoring an important component of job shop scheduling?
Question
The scheduling rule that minimizes the makespan time for a set of jobs that must be processed through a two-step system where every job follows the same sequence through the two processes is

A)the shortest processing time (SPT).
B)Johnson's Rule.
C)the assignment method.
D)the minimal slack rule.
Question
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
<strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 3 is assigned to</strong> A)machine A. B)machine B. C)machine C. D)machine D <div style=padding-top: 35px>
If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 3 is assigned to

A)machine A.
B)machine B.
C)machine C.
D)machine D
Question
If the following jobs are sequenced according to the DDATE rule then the maximum job tardiness (in days)is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the DDATE rule then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)12 days. B)15 days. C)16 days. D)27 days. <div style=padding-top: 35px>

A)12 days.
B)15 days.
C)16 days.
D)27 days.
Question
Who developed the theory of constraints (TOC)and what is its approach to scheduling?
Question
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job A would complete processing on operation 2 at
<strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job A would complete processing on operation 2 at  </strong> A)hour 21. B)hour 35. C)hour 38. D)hour 47. <div style=padding-top: 35px>

A)hour 21.
B)hour 35.
C)hour 38.
D)hour 47.
Question
The following set of jobs must be processed serially through a two-step system.If Johnson's Rule is used to sequence the jobs then the order in which the jobs would be performed is
<strong>The following set of jobs must be processed serially through a two-step system.If Johnson's Rule is used to sequence the jobs then the order in which the jobs would be performed is  </strong> A)A-B-C-D-E B)C-B-E-D-A C)E-B-D-A-C D)D-E-B-A-C <div style=padding-top: 35px>

A)A-B-C-D-E
B)C-B-E-D-A
C)E-B-D-A-C
D)D-E-B-A-C
Question
What is the difference between infinite scheduling and finite scheduling?
Question
What makes scheduling so difficult in a job shop?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/80
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 17: Scheduling
1
The longest processing time (LPT)rule tends to complete larger jobs in-house when subcontracting is anticipated.
True
2
Minimizing overtime is one of several objectives that could be considered when constructing a schedule.
True
3
The first-come,first-served (FCFS)sequencing rule should be only used when operating at high levels of capacity.
False
4
The time required for a job to move through the system is referred to as flow time.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
5
The process of assigning work to limited resources is known as scheduling.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
6
Gantt charts show the planned and yet to be completed activities against total activities.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
7
Scheduling is considered the last stage of the planning process.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
8
Managers typically use multiple objective when constructing a schedule.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
9
The sequence in which jobs should be processed is determined using linear programming.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
10
Sequencing involves determining the order in which jobs are released to the shop floor.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
11
Determining the optimal allocation of jobs to machines or workers can be solved using the assignment method of linear programming.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
12
Johnson's rule gives an optimal sequence for jobs processed serially through a two step system.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
13
The process of prioritizing jobs that have been assigned to a resource is called sequencing.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
14
Job shop scheduling is usually performed by skilled machine operators.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
15
Increasing the capacity of a work center that is a bottleneck increases output.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
16
The shortest processing time (SPT)rule is most useful when the job shop is not congested.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
17
The wide variety of jobs in a job shop makes scheduling difficult.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
18
All sequencing rules strive to optimize both processing efficiency and due date performance.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
19
Scheduling specifies when labor,equipment and facilities are needed to produce a product.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
20
Finite scheduling will not load a resource beyond its fixed capacity.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
21
The time required to complete a group of jobs is referred to as

A)flow time.
B)makespan.
C)completion time.
D)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
22
The assignment method of linear programming can be used for both loading and employee scheduling.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
23
Scheduling using the theory of constraints (TOC)requires that process batch sizes and transfer batch sizes always match.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
24
With drum-buffer-rope (DBR)the bottleneck resource is always the buffer.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
25
Typically,there are more options available when scheduling employees because labor is a very flexible resource.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
26
The sequencing rule that minimizes average tardiness for a set of jobs to be processed on one machine is

A)first-come-first served (FCFS).
B)longest processing time (LPT)
C)shortest process time (SPT)
D)due date (DDATE).
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
27
The theory of constraints (TOC)approach to scheduling concentrates on scheduling the bottleneck resources.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
28
If the work remaining is greater than the time remaining,the critical ratio (CR)will be

A)less than one.
B)greater than one.
C)equal to one.
D)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
29
If the following jobs are sequenced according to the first-come-first-served (FCFS)rule then the mean completion time in days for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the first-come-first-served (FCFS)rule then the mean completion time in days for all jobs is (assume zero for today's date)  </strong> A)33 days. B)22 days. C)6.6 days. D)4.4 days.

A)33 days.
B)22 days.
C)6.6 days.
D)4.4 days.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following is not typically considered an objective of scheduling?

A)minimizing job lateness
B)maximizing time in the system
C)minimizing overtime
D)maximizing machine utilization
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
31
Tardiness is defined as the difference between a job's flow time and makespan.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
32
The process of assigning work to limited resources is known as

A)loading.
B)sequencing.
C)monitoring.
D)dispatching
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
33
The process of prioritizing jobs that have been assigned to a resource is called

A)loading.
B)monitoring.
C)sequencing.
D)input/output analysis.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
34
The scheduling function for mass production and job shop production are basically the same.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
35
Job shop scheduling is also known as shop floor control.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
36
Input/output control provides the information necessary to regulate work flow in a job shop environment.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
37
In a job shop environment the process of prioritizing jobs assigned to a productive resource is called sequencing.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
38
The dispatch list contains the order in which work is assigned to a productive resource.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
39
If a job is ahead of schedule,then its critical ratio (CR)will be

A)less than one.
B)greater than one.
C)equal to one.
D)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
40
The sequencing rule that will minimize average job completion time for a set number of jobs to be processed on one machine is

A)first-come-first served (FCFS).
B)longest processing time (LPT).
C)shortest process time (SPT).
D)due date (DDATE).
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
41
If the following jobs are sequenced according to the LPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the LPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)118 days. B)6.6 days. C)33 days. D)23.6 days

A)118 days.
B)6.6 days.
C)33 days.
D)23.6 days
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
42
If the following jobs are sequenced according to the DDATE rule then the mean completion time (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the DDATE rule then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)16.4 days. B)22.6 days. C)28.7 days. D)33.0 days

A)16.4 days.
B)22.6 days.
C)28.7 days.
D)33.0 days
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
43
If the following jobs are sequenced according to the LPT rule then the total number of jobs that would be late is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the LPT rule then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)5 jobs. B)4 jobs. C)3 jobs. D)2 jobs.

A)5 jobs.
B)4 jobs.
C)3 jobs.
D)2 jobs.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
44
If the following jobs are sequenced according to the SLACK rule then the maximum job tardiness (in days)is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SLACK rule then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)20 days. B)12 days. C)10 days. D)7 days

A)20 days.
B)12 days.
C)10 days.
D)7 days
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
45
If the following jobs are sequenced according to the SPT rule then job B is completed on day (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SPT rule then job B is completed on day (assume zero for today's date)  </strong> A)6. B)14. C)15. D)22

A)6.
B)14.
C)15.
D)22
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
46
If the following jobs are sequenced according to the SPT rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SPT rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)16 days. B)13 days. C)5.2 days. D)3.2 days

A)16 days.
B)13 days.
C)5.2 days.
D)3.2 days
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
47
If the following jobs are sequenced according to the SLACK rule then the total number of jobs that would be late is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SLACK rule then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)1 jobs. B)2 jobs. C)3 jobs D)4 jobs

A)1 jobs.
B)2 jobs.
C)3 jobs
D)4 jobs
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
48
If the following jobs are sequenced according to the SPT rule then the maximum job tardiness (in days)is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SPT rule then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)26 days B)16 days C)10 days D)5.2 days

A)26 days
B)16 days
C)10 days
D)5.2 days
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
49
If the following jobs are sequenced according to the FCFS rule then the maximum job tardiness (in days)is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the FCFS rule then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)0 days. B)8 days. C)20 days. D)25 days.

A)0 days.
B)8 days.
C)20 days.
D)25 days.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
50
If the following jobs are sequenced according to the SPT rule then the total number of jobs that would be late is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SPT rule then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)0 jobs. B)1 job. C)2 jobs. D)3 jobs.

A)0 jobs.
B)1 job.
C)2 jobs.
D)3 jobs.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
51
If the following jobs are sequenced according to the FCFS rule then the mean tardiness (in days)for all jobs would be (assume zero for today's date)
<strong>If the following jobs are sequenced according to the FCFS rule then the mean tardiness (in days)for all jobs would be (assume zero for today's date)  </strong> A)5 days. B)8.33 days. C)10.6 days. D)25 days

A)5 days.
B)8.33 days.
C)10.6 days.
D)25 days
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
52
If the following jobs are sequenced according to the SLACK rule then the mean completion time (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SLACK rule then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)35 days. B)20.8 days. C)18.4 days. D)7 days.

A)35 days.
B)20.8 days.
C)18.4 days.
D)7 days.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
53
If the following jobs are sequenced according to the FCFS rule then the total number of jobs that would be late is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the FCFS rule then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)4. B)3. C)2. D)1.

A)4.
B)3.
C)2.
D)1.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
54
If the following jobs are sequenced according to the SLACK rule then job A would be completed on day (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SLACK rule then job A would be completed on day (assume zero for today's date)  </strong> A)8. B)7. C)15. D)12.

A)8.
B)7.
C)15.
D)12.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
55
If the following jobs are sequenced according to the SLACK rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SLACK rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)11.25 days. B)9 days. C)20 days. D)12.5 days.

A)11.25 days.
B)9 days.
C)20 days.
D)12.5 days.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
56
If the following jobs are sequenced according to the SPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the SPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)6.6 days. B)16 days. C)22 days. D)33 days.

A)6.6 days.
B)16 days.
C)22 days.
D)33 days.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
57
If the following jobs are sequenced according to the LPT rule then the maximum job tardiness (in days)is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the LPT rule then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)7 days. B)10 days. C)20 days. D)25 days.

A)7 days.
B)10 days.
C)20 days.
D)25 days.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
58
If the following jobs are sequenced according to the LPT rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the LPT rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)62 days. B)12.4 days. C)15.5 days. D)25 days

A)62 days.
B)12.4 days.
C)15.5 days.
D)25 days
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
59
If the following jobs are sequenced according to the FCFS rule then job C is completed on day (assume zero for today's date)
<strong>If the following jobs are sequenced according to the FCFS rule then job C is completed on day (assume zero for today's date)  </strong> A)11. B)17. C)25. D)30

A)11.
B)17.
C)25.
D)30
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
60
If the following jobs are sequenced according to the LPT rule then job D would be completed on day (assume zero for today's date )
<strong>If the following jobs are sequenced according to the LPT rule then job D would be completed on day (assume zero for today's date )  </strong> A)5. B)25. C)30. D)33.

A)5.
B)25.
C)30.
D)33.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
61
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
<strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   The minimum time required to complete all the products is</strong> A)29 minutes. B)27 minutes. C)33 minutes. D)36 minutes.
The minimum time required to complete all the products is

A)29 minutes.
B)27 minutes.
C)33 minutes.
D)36 minutes.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
62
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
<strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 1 is assigned to</strong> A)machine A B)machine B C)machine C D)machine D
If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 1 is assigned to

A)machine A
B)machine B
C)machine C
D)machine D
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
63
A ________ chart is used to show both planned and completed activities against a time scale.

A)Gantt
B)Dispatch
C)Sequencing
D)None of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
64
If the following jobs are sequenced according to the DDATE rule then the total number of jobs that would be late is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the DDATE rule then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)5 jobs. B)4 jobs. C)3 jobs. D)2 jobs.

A)5 jobs.
B)4 jobs.
C)3 jobs.
D)2 jobs.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
65
If the following jobs are sequenced according to the DDATE rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the DDATE rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)9.0 days. B)5.4 days. C)3.2 days. D)2.8 days

A)9.0 days.
B)5.4 days.
C)3.2 days.
D)2.8 days
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
66
List some of the objectives in scheduling.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
67
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
<strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to</strong> A)machine A. B)machine B. C)machine C. D)machine D.
If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to

A)machine A.
B)machine B.
C)machine C.
D)machine D.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
68
If the following jobs are sequenced according to the DDATE rule then job A would be completed on day (assume zero for today's date)
<strong>If the following jobs are sequenced according to the DDATE rule then job A would be completed on day (assume zero for today's date)  </strong> A)8. B)12. C)16. D)22

A)8.
B)12.
C)16.
D)22
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
69
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job C would start processing on operation 2 at
<strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job C would start processing on operation 2 at  </strong> A)hour 13. B)hour 26. C)hour 47. D)hour 53

A)hour 13.
B)hour 26.
C)hour 47.
D)hour 53
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
70
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
<strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management assigns products to machines so that the total time to complete all jobs is minimized,then the time to complete Product 1 is</strong> A)10 minutes. B)9 minutes. C)16 minutes. D)12 minutes
If management assigns products to machines so that the total time to complete all jobs is minimized,then the time to complete Product 1 is

A)10 minutes.
B)9 minutes.
C)16 minutes.
D)12 minutes
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
71
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is
<strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is  </strong> A)42 hours. B)53 hours. C)90 hours. D)95 hours.

A)42 hours.
B)53 hours.
C)90 hours.
D)95 hours.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
72
Why is monitoring an important component of job shop scheduling?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
73
The scheduling rule that minimizes the makespan time for a set of jobs that must be processed through a two-step system where every job follows the same sequence through the two processes is

A)the shortest processing time (SPT).
B)Johnson's Rule.
C)the assignment method.
D)the minimal slack rule.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
74
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
<strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 3 is assigned to</strong> A)machine A. B)machine B. C)machine C. D)machine D
If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 3 is assigned to

A)machine A.
B)machine B.
C)machine C.
D)machine D
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
75
If the following jobs are sequenced according to the DDATE rule then the maximum job tardiness (in days)is (assume zero for today's date)
<strong>If the following jobs are sequenced according to the DDATE rule then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)12 days. B)15 days. C)16 days. D)27 days.

A)12 days.
B)15 days.
C)16 days.
D)27 days.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
76
Who developed the theory of constraints (TOC)and what is its approach to scheduling?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
77
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job A would complete processing on operation 2 at
<strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job A would complete processing on operation 2 at  </strong> A)hour 21. B)hour 35. C)hour 38. D)hour 47.

A)hour 21.
B)hour 35.
C)hour 38.
D)hour 47.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
78
The following set of jobs must be processed serially through a two-step system.If Johnson's Rule is used to sequence the jobs then the order in which the jobs would be performed is
<strong>The following set of jobs must be processed serially through a two-step system.If Johnson's Rule is used to sequence the jobs then the order in which the jobs would be performed is  </strong> A)A-B-C-D-E B)C-B-E-D-A C)E-B-D-A-C D)D-E-B-A-C

A)A-B-C-D-E
B)C-B-E-D-A
C)E-B-D-A-C
D)D-E-B-A-C
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
79
What is the difference between infinite scheduling and finite scheduling?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
80
What makes scheduling so difficult in a job shop?