Exam 17: Scheduling
Exam 1: Operations Management63 Questions
Exam 2: Quality Management71 Questions
Exam 3: Statistical Quality Control111 Questions
Exam 4: Product Design75 Questions
Exam 5: Service Design79 Questions
Exam 6: Processes and Technology61 Questions
Exam 17: Scheduling80 Questions
Exam 7: Capacity and Facilities83 Questions
Exam 8: Human Resources79 Questions
Exam 9: Project Management85 Questions
Exam 10: Supply Chain Management: Strategy and Design56 Questions
Exam 11: Global Supply Chain Procurement and Distribution69 Questions
Exam 12: Forecasting85 Questions
Exam 13: Inventory Management78 Questions
Exam 13: Operational Decision-Making Tools: Simulation22 Questions
Exam 14: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 14: The Sales and Operations Planning Process76 Questions
Exam 15: Resource Planning82 Questions
Exam 16: Lean Systems79 Questions
Exam 18: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 19: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 20: Decision-Making Tools: Facility Location Models23 Questions
Exam 21: Operational Decision-Making Tools: Work Measurement31 Questions
Select questions type
The time required for a job to move through the system is referred to as flow time.
Free
(True/False)
4.8/5
(39)
Correct Answer:
True
If the following jobs are sequenced according to the SPT rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)


Free
(Multiple Choice)
4.9/5
(28)
Correct Answer:
C
If the following jobs are sequenced according to the DDATE rule then the maximum job tardiness (in days)is (assume zero for today's date)


Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
C
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job C would start processing on operation 2 at


(Multiple Choice)
4.9/5
(31)
The process of prioritizing jobs that have been assigned to a resource is called sequencing.
(True/False)
4.8/5
(34)
Managers typically use multiple objective when constructing a schedule.
(True/False)
4.8/5
(38)
If the following jobs are sequenced according to the DDATE rule then job A would be completed on day (assume zero for today's date)


(Multiple Choice)
4.9/5
(33)
If the following jobs are sequenced according to the DDATE rule then the mean completion time (in days)for all jobs is (assume zero for today's date)


(Multiple Choice)
4.9/5
(36)
If the following jobs are sequenced according to the FCFS rule then the total number of jobs that would be late is (assume zero for today's date)


(Multiple Choice)
4.9/5
(37)
If the following jobs are sequenced according to the SPT rule then the total number of jobs that would be late is (assume zero for today's date)


(Multiple Choice)
4.9/5
(35)
The scheduling rule that minimizes the makespan time for a set of jobs that must be processed through a two-step system where every job follows the same sequence through the two processes is
(Multiple Choice)
4.8/5
(31)
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job A would complete processing on operation 2 at


(Multiple Choice)
4.9/5
(27)
The theory of constraints (TOC)approach to scheduling concentrates on scheduling the bottleneck resources.
(True/False)
4.8/5
(33)
Which of the following is not typically considered an objective of scheduling?
(Multiple Choice)
4.7/5
(34)
A ________ chart is used to show both planned and completed activities against a time scale.
(Multiple Choice)
4.9/5
(42)
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 1 is assigned to

(Multiple Choice)
4.7/5
(33)
Minimizing overtime is one of several objectives that could be considered when constructing a schedule.
(True/False)
4.8/5
(41)
If the following jobs are sequenced according to the FCFS rule then the mean tardiness (in days)for all jobs would be (assume zero for today's date)


(Multiple Choice)
4.9/5
(36)
The dispatch list contains the order in which work is assigned to a productive resource.
(True/False)
4.8/5
(34)
Tardiness is defined as the difference between a job's flow time and makespan.
(True/False)
4.8/5
(31)
Showing 1 - 20 of 80