Deck 26: Systems Development Project Management

Full screen (f)
exit full mode
Question
Which of the following is a characteristic of large-scale systems development projects?

A)avoidance of system localisation
B)single development site
C)short development intervals
D)50-100 development team members
Use Space or
up arrow
down arrow
to flip the card.
Question
What are the characteristics of large-scale systems development projects?
Question
In the context of a systems development project,which of the following statements is true of the relationships between requirements,cost,and time?

A)Reducing the requirements in a project rarely affects the time required to finish the project.
B)Increasing the time for the completion of a project always increases the cost of the project.
C)Reducing the number of requirements in a project reduces the overall cost of the project.
D)Increasing the cost of a project can always reduce the time required to finish the project.
Question
In the Project Management Body of Knowledge (PMBOK®)Guide,________ refer to the different stages in the life of a project.

A)knowledge areas
B)resource zones
C)process groups
D)configuration controls
Question
What are the trade-offs in a systems development project's requirements,cost,and time?
Question
Systems development projects require the balancing of three critical drivers: requirements,cost,and ________.

A)time
B)scope
C)value
D)performance
Question
Larger projects with longer development intervals will find it easier to meet baseline requirements.
Question
What is the Project Management Body of Knowledge (PMBOK®)Guide for project management?
Question
Knowledge areas refer to the factors in a project that need to be managed throughout the life of the project.
Question
The Project Management Body of Knowledge (PMBOK®)Guide identifies those practices that are known to be effective for different situations and briefly describes their use.
Question
The development of large-scale systems can involve the integration of products and services from different companies.
Question
Which of the following is a technique that stipulates phases and processes for constructing information systems (IS),but does not address the management of large-scale projects?

A)agile software development
B)structured system analysis
C)rapid application development
D)systems development life cycle
Question
________ is a knowledge area that concerns the creation of contracts with outside vendors for services,materials,and outsourcing of functions.

A)Communications management
B)Procurement management
C)Project integration
D)Quality management
Question
Increasing the cost of a project can reduce the time required to complete the project up to a certain point,beyond which,the time required would increase due to ________.

A)economies of scale
B)diseconomies of scale
C)economies of scope
D)diseconomies of scope
Question
Which of the following statements is true of large-scale systems development projects?

A)Their development is carried out in a single site to ensure consistency.
B)Their development involves the integration of services from several companies.
C)They use small development teams of less than 20 members to reduce complexity.
D)They use simple computer programs to ensure consistency and speed in development.
Question
________ is the knowledge area that refers to the management of an entire project and the construction of the final product.

A)Quality management
B)Procurement management
C)Communications management
D)Project integration
Question
The time involved in a project can always be reduced by increasing cost.
Question
________ is a knowledge area that concerns the methods,media,and schedules for exchanging information with a project's sponsors and others who have an interest in the progress of the project.

A)Procurement management
B)Communications management
C)Quality management
D)Project integration
Question
A plan that stipulates the tasks to be accomplished in a project,the labour and other resources assigned to those tasks,and the schedule for completion of the project is called the ________.

A)scatter plot
B)baseline
C)line of code
D)data model
Question
Large-scale systems development requires extended development intervals that extend up to 5 years.
Question
A loss of control over a project's configuration can be easily fixed through remedial measures.
Question
A(n)________ is the sequence of activities that determine the earliest date by which a project can be completed.

A)encryption algorithm
B)scatter plot
C)Gantt chart
D)critical path
Question
A well-managed project will never face problems of diseconomies of scale.
Question
A function point is a feature or function of a new program.
Question
Which of the following shows the tasks,dates,and task dependencies in a project?

A)push report
B)scatter plot
C)Gantt chart
D)exception report
Question
Prototypes are examples of deliverables in a systems development project.
Question
A(n)________ is a hierarchy of the tasks required to complete a project.

A)encryption algorithm
B)V-Model
C)scatter plot
D)work breakdown structure
Question
The biggest challenge in planning systems development is scheduling.
Question
The biggest challenge in planning large-scale systems development is scheduling.Describe the three approaches that organisations can take to address this challenge.
Question
________ refers to a set of management policies,practices,and tools that developers use to maintain control over a project's resources.

A)Configuration control
B)Critical path analysis
C)Perceptual mapping
D)Coordination control
Question
The smaller and shorter a project,the greater the chance of disruption due to unanticipated events.
Question
What is a critical path? How is a critical path analysis done?
Question
Each task in a systems development project should culminate in one or more ________.

A)zones
B)deliverables
C)segments
D)designs
Question
With respect to work breakdown structure (WBS),________ means to define the boundaries of a system.

A)code
B)scale
C)trade-off
D)scope
Question
Which of the following activities is the biggest challenge in planning systems development?

A)creating
B)testing
C)scheduling
D)analysing
Question
The critical path is a hierarchy of the tasks required to complete a project.
Question
In case of task dependencies in a project,all tasks must begin and end at the same time.
Question
Baseline WBS can be used for monitoring a project.
Question
One approach businesses take to address scheduling challenges in large-scale systems is avoiding the development of software in-house.
Question
The challenges of managing large-scale systems development projects arise from ________.

A)economies of scale
B)increase in configuration control
C)economies of scope
D)lack of coordination
Question
What are the biggest challenges for managing a large-scale systems development project?
Question
Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.
Question
________ is the process by which users agree to one set of conditions,then add a bit more,then add a bit more,and so forth.

A)Requirements creep
B)Diseconomies of scale
C)Configuration control
D)Coordination
Question
Requirements creep is the process by which a project manager reduces his/her responsibilities for requirements through miniscule rollbacks.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/44
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 26: Systems Development Project Management
1
Which of the following is a characteristic of large-scale systems development projects?

A)avoidance of system localisation
B)single development site
C)short development intervals
D)50-100 development team members
D
2
What are the characteristics of large-scale systems development projects?
A large-scale systems development project has many features and functions.It has large,complex computer programs and databases with hundreds of tables,dozens to hundreds of relationships,and terabytes of data.Such large development projects affect many business processes and support hundreds or thousands of concurrent users.They require a large development team of 50 to 100 or more systems analysts,programmers,PQA engineers,and managers.Large-scale systems are often simultaneously developed at multiple sites,often dispersed across different countries.Additionally,the development of large-scale systems can involve integrating products and services from different companies.Large-scale systems are frequently localised for different languages.Finally,a large-scale systems development requires extended development intervals,sometimes as long as 5 or 6 years.
3
In the context of a systems development project,which of the following statements is true of the relationships between requirements,cost,and time?

A)Reducing the requirements in a project rarely affects the time required to finish the project.
B)Increasing the time for the completion of a project always increases the cost of the project.
C)Reducing the number of requirements in a project reduces the overall cost of the project.
D)Increasing the cost of a project can always reduce the time required to finish the project.
C
4
In the Project Management Body of Knowledge (PMBOK®)Guide,________ refer to the different stages in the life of a project.

A)knowledge areas
B)resource zones
C)process groups
D)configuration controls
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
5
What are the trade-offs in a systems development project's requirements,cost,and time?
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
6
Systems development projects require the balancing of three critical drivers: requirements,cost,and ________.

A)time
B)scope
C)value
D)performance
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
7
Larger projects with longer development intervals will find it easier to meet baseline requirements.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
8
What is the Project Management Body of Knowledge (PMBOK®)Guide for project management?
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
9
Knowledge areas refer to the factors in a project that need to be managed throughout the life of the project.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
10
The Project Management Body of Knowledge (PMBOK®)Guide identifies those practices that are known to be effective for different situations and briefly describes their use.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
11
The development of large-scale systems can involve the integration of products and services from different companies.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following is a technique that stipulates phases and processes for constructing information systems (IS),but does not address the management of large-scale projects?

A)agile software development
B)structured system analysis
C)rapid application development
D)systems development life cycle
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
13
________ is a knowledge area that concerns the creation of contracts with outside vendors for services,materials,and outsourcing of functions.

A)Communications management
B)Procurement management
C)Project integration
D)Quality management
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
14
Increasing the cost of a project can reduce the time required to complete the project up to a certain point,beyond which,the time required would increase due to ________.

A)economies of scale
B)diseconomies of scale
C)economies of scope
D)diseconomies of scope
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following statements is true of large-scale systems development projects?

A)Their development is carried out in a single site to ensure consistency.
B)Their development involves the integration of services from several companies.
C)They use small development teams of less than 20 members to reduce complexity.
D)They use simple computer programs to ensure consistency and speed in development.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
16
________ is the knowledge area that refers to the management of an entire project and the construction of the final product.

A)Quality management
B)Procurement management
C)Communications management
D)Project integration
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
17
The time involved in a project can always be reduced by increasing cost.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
18
________ is a knowledge area that concerns the methods,media,and schedules for exchanging information with a project's sponsors and others who have an interest in the progress of the project.

A)Procurement management
B)Communications management
C)Quality management
D)Project integration
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
19
A plan that stipulates the tasks to be accomplished in a project,the labour and other resources assigned to those tasks,and the schedule for completion of the project is called the ________.

A)scatter plot
B)baseline
C)line of code
D)data model
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
20
Large-scale systems development requires extended development intervals that extend up to 5 years.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
21
A loss of control over a project's configuration can be easily fixed through remedial measures.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
22
A(n)________ is the sequence of activities that determine the earliest date by which a project can be completed.

A)encryption algorithm
B)scatter plot
C)Gantt chart
D)critical path
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
23
A well-managed project will never face problems of diseconomies of scale.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
24
A function point is a feature or function of a new program.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following shows the tasks,dates,and task dependencies in a project?

A)push report
B)scatter plot
C)Gantt chart
D)exception report
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
26
Prototypes are examples of deliverables in a systems development project.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
27
A(n)________ is a hierarchy of the tasks required to complete a project.

A)encryption algorithm
B)V-Model
C)scatter plot
D)work breakdown structure
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
28
The biggest challenge in planning systems development is scheduling.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
29
The biggest challenge in planning large-scale systems development is scheduling.Describe the three approaches that organisations can take to address this challenge.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
30
________ refers to a set of management policies,practices,and tools that developers use to maintain control over a project's resources.

A)Configuration control
B)Critical path analysis
C)Perceptual mapping
D)Coordination control
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
31
The smaller and shorter a project,the greater the chance of disruption due to unanticipated events.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
32
What is a critical path? How is a critical path analysis done?
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
33
Each task in a systems development project should culminate in one or more ________.

A)zones
B)deliverables
C)segments
D)designs
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
34
With respect to work breakdown structure (WBS),________ means to define the boundaries of a system.

A)code
B)scale
C)trade-off
D)scope
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following activities is the biggest challenge in planning systems development?

A)creating
B)testing
C)scheduling
D)analysing
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
36
The critical path is a hierarchy of the tasks required to complete a project.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
37
In case of task dependencies in a project,all tasks must begin and end at the same time.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
38
Baseline WBS can be used for monitoring a project.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
39
One approach businesses take to address scheduling challenges in large-scale systems is avoiding the development of software in-house.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
40
The challenges of managing large-scale systems development projects arise from ________.

A)economies of scale
B)increase in configuration control
C)economies of scope
D)lack of coordination
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
41
What are the biggest challenges for managing a large-scale systems development project?
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
42
Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
43
________ is the process by which users agree to one set of conditions,then add a bit more,then add a bit more,and so forth.

A)Requirements creep
B)Diseconomies of scale
C)Configuration control
D)Coordination
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
44
Requirements creep is the process by which a project manager reduces his/her responsibilities for requirements through miniscule rollbacks.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 44 flashcards in this deck.