Exam 26: Systems Development Project Management

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

With respect to work breakdown structure (WBS),________ means to define the boundaries of a system.

Free
(Multiple Choice)
4.9/5
(31)
Correct Answer:
Verified

D

In the context of a systems development project,which of the following statements is true of the relationships between requirements,cost,and time?

Free
(Multiple Choice)
4.7/5
(40)
Correct Answer:
Verified

C

A loss of control over a project's configuration can be easily fixed through remedial measures.

Free
(True/False)
4.9/5
(34)
Correct Answer:
Verified

False

________ is the knowledge area that refers to the management of an entire project and the construction of the final product.

(Multiple Choice)
4.8/5
(32)

One approach businesses take to address scheduling challenges in large-scale systems is avoiding the development of software in-house.

(True/False)
4.8/5
(30)

________ is a knowledge area that concerns the creation of contracts with outside vendors for services,materials,and outsourcing of functions.

(Multiple Choice)
4.7/5
(27)

Which of the following activities is the biggest challenge in planning systems development?

(Multiple Choice)
4.9/5
(33)

In the Project Management Body of Knowledge (PMBOK®)Guide,________ refer to the different stages in the life of a project.

(Multiple Choice)
4.8/5
(37)

What is a critical path? How is a critical path analysis done?

(Essay)
4.8/5
(34)

Larger projects with longer development intervals will find it easier to meet baseline requirements.

(True/False)
4.8/5
(41)

Increasing the cost of a project can reduce the time required to complete the project up to a certain point,beyond which,the time required would increase due to ________.

(Multiple Choice)
4.9/5
(35)

What are the characteristics of large-scale systems development projects?

(Essay)
4.9/5
(40)

A well-managed project will never face problems of diseconomies of scale.

(True/False)
4.9/5
(38)

Which of the following is a technique that stipulates phases and processes for constructing information systems (IS),but does not address the management of large-scale projects?

(Multiple Choice)
4.8/5
(37)

The challenges of managing large-scale systems development projects arise from ________.

(Multiple Choice)
4.9/5
(39)

In case of task dependencies in a project,all tasks must begin and end at the same time.

(True/False)
4.9/5
(40)

A plan that stipulates the tasks to be accomplished in a project,the labour and other resources assigned to those tasks,and the schedule for completion of the project is called the ________.

(Multiple Choice)
4.7/5
(33)

A(n)________ is the sequence of activities that determine the earliest date by which a project can be completed.

(Multiple Choice)
4.7/5
(32)

Prototypes are examples of deliverables in a systems development project.

(True/False)
4.9/5
(28)

The Project Management Body of Knowledge (PMBOK®)Guide identifies those practices that are known to be effective for different situations and briefly describes their use.

(True/False)
4.8/5
(45)
Showing 1 - 20 of 44