Question
The ideal setup time for a lean system is:

A)5 minutes
B)The time it takes the line to get ready
C)0 minutes
D)1 hour
Use Space or
up arrow
down arrow
to flip the card.
Question
If a manufacturer has daily requirements for products A,B and C of 360,100,and 300,respectively,then the daily schedule will call for the following amounts of each product to be produced per cycle:

A)| (36)A (10)B (30)C |
B)| (18)A (5)B (15)C |
C)| (72)A (20)B (60)C |
D)| (18)A (10)B (30)C |
Question
How many cycles are required each day for the above daily requirements?

A)16
B)10
C)20
D)5
Question
Which of the following is not an element of lean?

A)Small-lot production
B)Modularized master schedule
C)Multifunction workers
D)Kanban pull system
E)Perfect or nearly perfect quality
Question
The time it takes a container to complete an entire circuit consists of:

A)Move time,time used,and wait time
B)Wait time,run time,setup time,and idle time
C)Fill time,wait time,move time,time used,and time to be returned to be filled again
D)None of the above
Question
According to the lean philosophy,it is required to maintain a stable master production schedule to reduce the work-in-process inventories.
Question
For production control,lean pull systems are best suited for:

A)Repetitive manufacturing
B)Job shop production
C)Semi-repetitive batch manufacturing
D)None of the above
Question
Reduction of setup time is accomplished by separating internal and external setups and:

A)Reducing inventory
B)Implementing a Kanban system
C)Converting internal setup time to external setup time
D)Reducing lot sizes
Question
The principal objective of a lean system is:

A)Worker participation
B)Reduction of inventory
C)Reduction of setup times
D)Improve the ROI of the firm
Question
External setups refer to actions that require stoppage of the production process.
Question
Value stream maps are similar to flowcharts and are used for identifying the waste and non-value-added steps in the current process.
Question
External setup time refers to:

A)The time it takes workers to set up a machine during scheduled maintenance
B)The time to complete setup activities that do not require that the machine be stopped
C)The time it takes equipment vendors to set up the machine
D)None of the above
Question
Given the following information pertaining to item AX143,determine the appropriate number of kanban cards that should be used to support production. Demand rate = 500 units/week
Lead time = 2 weeks
Safety Stock = 30 percent
Size of Container = 5 units

A)260 units
B)200 units
C)150 units
D)250 units
Question
Why is production leveled in a lean system?

A)To create a uniform workload on all work centers
B)To allow for production of safety stock
C)To signal the need for more parts
D)To increase the time for scheduled maintenance
Question
The ideal lot size for a lean system is:

A)Infinite
B)One
C)The capacity of the machine
D)Variable according to the production requirements
E)None of the above
Question
If it takes 100 minutes to complete a circuit,demand at the next work center is 5 parts per minute,and a container will hold 20 parts,how many containers are required?

A)25
B)5
C)40
D)20
Question
A kanban card is used to signal that:

A)The next work center is stopped
B)A materials handler has run out of parts
C)A machine has broken down
D)Parts are needed by the subsequent work center
E)A machine is ready for preventive maintenance
Question
If a work center has no empty containers,the workers at the work center will do which of the following?

A)Continue to produce as much inventory as they can
B)Produce enough inventory to meet the following day's demand
C)Produce enough inventory to satisfy the master production schedule
D)Stop production
Question
Which of the following is not required for a lean system?

A)Flexible workforce
B)A Type II MRP system
C)A stable master schedule
D)Kanban pull system
Question
With regards to suppliers,lean systems typically require:

A)Delivery of large lots at frequent intervals
B)Buyer inspection of goods and materials
C)Multiple sources from which to purchase
D)Long-term relationships and commitments
E)The lowest price possible
Question
What are the eight forms of waste?
Question
When kanban is used,only the final assembly department will receive a schedule from the dispatching office.
Question
Kaizen events typically take between 1 to 2 months.
Question
With lean thinking,a company's operations layout should evolve to a cellular manufacturing layout.
Question
Lean is an example of a pull system while lean thinking is an example of a push system.
Question
One-touch setups could require as long as 9 minutes to perform.
Question
The key to reducing inventory is reducing lead-time.
Question
Poka-yoke is another term for stabilizing the master schedule.
Question
What are the five essential elements of lean thinking? In your own words,provide a road map for implementing lean thinking in a manufacturing or service operations.
Question
The Japanese term for waste is "gemba."
Question
A Kanban card system finds good utility in a job shop type of production process in regulating the workflow through the shop.
Question
"Gemba" refers to data collection using the company's information system.
Question
Takt time is calculated by taking demand over some period divided by the available time for production during that period.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/33
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 7: Lean Thinking and Lean Systems
1
The ideal setup time for a lean system is:

A)5 minutes
B)The time it takes the line to get ready
C)0 minutes
D)1 hour
C
2
If a manufacturer has daily requirements for products A,B and C of 360,100,and 300,respectively,then the daily schedule will call for the following amounts of each product to be produced per cycle:

A)| (36)A (10)B (30)C |
B)| (18)A (5)B (15)C |
C)| (72)A (20)B (60)C |
D)| (18)A (10)B (30)C |
B
3
How many cycles are required each day for the above daily requirements?

A)16
B)10
C)20
D)5
C
4
Which of the following is not an element of lean?

A)Small-lot production
B)Modularized master schedule
C)Multifunction workers
D)Kanban pull system
E)Perfect or nearly perfect quality
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
5
The time it takes a container to complete an entire circuit consists of:

A)Move time,time used,and wait time
B)Wait time,run time,setup time,and idle time
C)Fill time,wait time,move time,time used,and time to be returned to be filled again
D)None of the above
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
6
According to the lean philosophy,it is required to maintain a stable master production schedule to reduce the work-in-process inventories.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
7
For production control,lean pull systems are best suited for:

A)Repetitive manufacturing
B)Job shop production
C)Semi-repetitive batch manufacturing
D)None of the above
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
8
Reduction of setup time is accomplished by separating internal and external setups and:

A)Reducing inventory
B)Implementing a Kanban system
C)Converting internal setup time to external setup time
D)Reducing lot sizes
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
9
The principal objective of a lean system is:

A)Worker participation
B)Reduction of inventory
C)Reduction of setup times
D)Improve the ROI of the firm
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
10
External setups refer to actions that require stoppage of the production process.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
11
Value stream maps are similar to flowcharts and are used for identifying the waste and non-value-added steps in the current process.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
12
External setup time refers to:

A)The time it takes workers to set up a machine during scheduled maintenance
B)The time to complete setup activities that do not require that the machine be stopped
C)The time it takes equipment vendors to set up the machine
D)None of the above
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
13
Given the following information pertaining to item AX143,determine the appropriate number of kanban cards that should be used to support production. Demand rate = 500 units/week
Lead time = 2 weeks
Safety Stock = 30 percent
Size of Container = 5 units

A)260 units
B)200 units
C)150 units
D)250 units
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
14
Why is production leveled in a lean system?

A)To create a uniform workload on all work centers
B)To allow for production of safety stock
C)To signal the need for more parts
D)To increase the time for scheduled maintenance
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
15
The ideal lot size for a lean system is:

A)Infinite
B)One
C)The capacity of the machine
D)Variable according to the production requirements
E)None of the above
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
16
If it takes 100 minutes to complete a circuit,demand at the next work center is 5 parts per minute,and a container will hold 20 parts,how many containers are required?

A)25
B)5
C)40
D)20
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
17
A kanban card is used to signal that:

A)The next work center is stopped
B)A materials handler has run out of parts
C)A machine has broken down
D)Parts are needed by the subsequent work center
E)A machine is ready for preventive maintenance
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
18
If a work center has no empty containers,the workers at the work center will do which of the following?

A)Continue to produce as much inventory as they can
B)Produce enough inventory to meet the following day's demand
C)Produce enough inventory to satisfy the master production schedule
D)Stop production
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following is not required for a lean system?

A)Flexible workforce
B)A Type II MRP system
C)A stable master schedule
D)Kanban pull system
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
20
With regards to suppliers,lean systems typically require:

A)Delivery of large lots at frequent intervals
B)Buyer inspection of goods and materials
C)Multiple sources from which to purchase
D)Long-term relationships and commitments
E)The lowest price possible
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
21
What are the eight forms of waste?
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
22
When kanban is used,only the final assembly department will receive a schedule from the dispatching office.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
23
Kaizen events typically take between 1 to 2 months.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
24
With lean thinking,a company's operations layout should evolve to a cellular manufacturing layout.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
25
Lean is an example of a pull system while lean thinking is an example of a push system.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
26
One-touch setups could require as long as 9 minutes to perform.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
27
The key to reducing inventory is reducing lead-time.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
28
Poka-yoke is another term for stabilizing the master schedule.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
29
What are the five essential elements of lean thinking? In your own words,provide a road map for implementing lean thinking in a manufacturing or service operations.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
30
The Japanese term for waste is "gemba."
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
31
A Kanban card system finds good utility in a job shop type of production process in regulating the workflow through the shop.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
32
"Gemba" refers to data collection using the company's information system.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
33
Takt time is calculated by taking demand over some period divided by the available time for production during that period.
Unlock Deck
Unlock for access to all 33 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 33 flashcards in this deck.