Exam 7: Lean Thinking and Lean Systems
Exam 1: The Operations Function25 Questions
Exam 2: Operations and Supply Chain Strategy26 Questions
Exam 3: Product Design27 Questions
Exam 4: Process Selection35 Questions
Exam 5: Service Process Design30 Questions
Exam 6: Process-Flow Analysis27 Questions
Exam 7: Lean Thinking and Lean Systems33 Questions
Exam 8: Managing Quality31 Questions
Exam 9: Quality Control and Improvement36 Questions
Exam 10: Supply Chain Management29 Questions
Exam 11: Forecasting31 Questions
Exam 12: Capacity Planning23 Questions
Exam 13: Scheduling Operations23 Questions
Exam 14: Project Planning and Scheduling22 Questions
Exam 15: Independent Demand Inventory30 Questions
Exam 16: Materials Requirements Planning and ERP30 Questions
Select questions type
External setups refer to actions that require stoppage of the production process.
Free
(True/False)
4.9/5
(42)
Correct Answer:
False
If a manufacturer has daily requirements for products A,B and C of 360,100,and 300,respectively,then the daily schedule will call for the following amounts of each product to be produced per cycle:
Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
B
The principal objective of a lean system is:
Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
D
When kanban is used,only the final assembly department will receive a schedule from the dispatching office.
(True/False)
4.8/5
(36)
Lean is an example of a pull system while lean thinking is an example of a push system.
(True/False)
4.8/5
(45)
A Kanban card system finds good utility in a job shop type of production process in regulating the workflow through the shop.
(True/False)
4.8/5
(40)
What are the five essential elements of lean thinking? In your own words,provide a road map for implementing lean thinking in a manufacturing or service operations.
(Essay)
4.8/5
(32)
Takt time is calculated by taking demand over some period divided by the available time for production during that period.
(True/False)
4.8/5
(37)
For production control,lean pull systems are best suited for:
(Multiple Choice)
4.8/5
(29)
The time it takes a container to complete an entire circuit consists of:
(Multiple Choice)
4.9/5
(31)
"Gemba" refers to data collection using the company's information system.
(True/False)
4.8/5
(37)
Given the following information pertaining to item AX143,determine the appropriate number of kanban cards that should be used to support production. Demand rate = 500 units/week
Lead time = 2 weeks
Safety Stock = 30 percent
Size of Container = 5 units
(Multiple Choice)
4.9/5
(36)
How many cycles are required each day for the above daily requirements?
(Multiple Choice)
4.8/5
(37)
Showing 1 - 20 of 33