Exam 7: Lean Thinking and Lean Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

External setups refer to actions that require stoppage of the production process.

Free
(True/False)
4.9/5
(42)
Correct Answer:
Verified

False

If a manufacturer has daily requirements for products A,B and C of 360,100,and 300,respectively,then the daily schedule will call for the following amounts of each product to be produced per cycle:

Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
Verified

B

The principal objective of a lean system is:

Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
Verified

D

When kanban is used,only the final assembly department will receive a schedule from the dispatching office.

(True/False)
4.8/5
(36)

Lean is an example of a pull system while lean thinking is an example of a push system.

(True/False)
4.8/5
(45)

The Japanese term for waste is "gemba."

(True/False)
4.7/5
(34)

A Kanban card system finds good utility in a job shop type of production process in regulating the workflow through the shop.

(True/False)
4.8/5
(40)

What are the five essential elements of lean thinking? In your own words,provide a road map for implementing lean thinking in a manufacturing or service operations.

(Essay)
4.8/5
(32)

The ideal setup time for a lean system is:

(Multiple Choice)
4.9/5
(34)

The key to reducing inventory is reducing lead-time.

(True/False)
4.9/5
(32)

Takt time is calculated by taking demand over some period divided by the available time for production during that period.

(True/False)
4.8/5
(37)

For production control,lean pull systems are best suited for:

(Multiple Choice)
4.8/5
(29)

Kaizen events typically take between 1 to 2 months.

(True/False)
4.8/5
(27)

What are the eight forms of waste?

(Essay)
4.9/5
(38)

One-touch setups could require as long as 9 minutes to perform.

(True/False)
4.8/5
(30)

Poka-yoke is another term for stabilizing the master schedule.

(True/False)
4.8/5
(33)

The time it takes a container to complete an entire circuit consists of:

(Multiple Choice)
4.9/5
(31)

"Gemba" refers to data collection using the company's information system.

(True/False)
4.8/5
(37)

Given the following information pertaining to item AX143,determine the appropriate number of kanban cards that should be used to support production. Demand rate = 500 units/week Lead time = 2 weeks Safety Stock = 30 percent Size of Container = 5 units

(Multiple Choice)
4.9/5
(36)

How many cycles are required each day for the above daily requirements?

(Multiple Choice)
4.8/5
(37)