In a time study the standard time is computed by
A)multiplying the elemental average time by the rating factor
B)dividing the average elemental time by the rating factor
C)multiplying the normal cycle time by the rating factor
D)multiplying the normal cycle time by one plus the allowance factor
A)multiplying the elemental average time by the rating factor
B)dividing the average elemental time by the rating factor
C)multiplying the normal cycle time by the rating factor
D)multiplying the normal cycle time by one plus the allowance factor
D
2
In work measurement,a performance rating factor
A)allows the transferability of a standard to other workers
B)does not require that the analyst be specially trained
C)is the same regardless of the effort and skill of the operator observed
D)converts the time of the operator observed to the expected performance of the best worker
A)allows the transferability of a standard to other workers
B)does not require that the analyst be specially trained
C)is the same regardless of the effort and skill of the operator observed
D)converts the time of the operator observed to the expected performance of the best worker
A
3
A retail catalog company wants to perform a work sampling study of its call center,and if the company estimates its operators are busy answering calls 80% of the time,and it wants the study to be accurate with + or - 4% with a 95% degree of accuracy,the number of sample observations the study should include is approximately
A)8
B)49
C)384
D)2,401
A)8
B)49
C)384
D)2,401
C
4
In a work sampling study the percentage of time a worker is idle is called the
A)normal time proportion
B)sampling error
C)sampling period
D)ratio delay
A)normal time proportion
B)sampling error
C)sampling period
D)ratio delay
Unlock Deck
Unlock for access to all 8 flashcards in this deck.
Unlock Deck
k this deck
5
A primary use of work sampling is to analyze jobs that have
A)very short,clearly defined tasks
B)highly repetitive tasks
C)non-repetitive tasks
D)a large number of tasks
A)very short,clearly defined tasks
B)highly repetitive tasks
C)non-repetitive tasks
D)a large number of tasks
Unlock Deck
Unlock for access to all 8 flashcards in this deck.
Unlock Deck
k this deck
6
A company conducted a single sample of a time study for 10 cycles of a job and if the average cycle time was 0.60 minutes,and the standard deviation of the sample was 0.075 minutes,for the company to be 95% confident that the average time computed for the time study is within 5% of the true average cycle time,the time study would need to encompass
A)16 cycles
B)20 cycles
C)24 cycles
D)32 cycles
A)16 cycles
B)20 cycles
C)24 cycles
D)32 cycles
Unlock Deck
Unlock for access to all 8 flashcards in this deck.
Unlock Deck
k this deck
7
If the normal cycle time for a job is 1.25 minutes and the allowance factor is 1.20,the number of units that an average worker can produce in an hour is
A)45.5
B)48.0
C)50.0
D)52.5
A)45.5
B)48.0
C)50.0
D)52.5
Unlock Deck
Unlock for access to all 8 flashcards in this deck.
Unlock Deck
k this deck
8
For a time study normal times developed in a laboratory environment for basic,generic micromotions that are common to many jobs are
A)elemental standard times
B)predetermined motion times
C)time measurement units
D)normal cycle times
A)elemental standard times
B)predetermined motion times
C)time measurement units
D)normal cycle times