Deck 1: Introduction to Project Management

Full screen (f)
exit full mode
Question
 The primary role of project stakeholder management is to ensure that the project will satisfy the stated needs for which it was undertaken.
Use Space or
up arrow
down arrow
to flip the card.
Question
 A project's stakeholders include its customers, users, and suppliers.
Question
 Maturity models, statistical methods, and test plans are examples of tools used in quality management.
Question
 One of the main reasons why project management is challenging is because of the factor of uncertainty.
Question
 A difference between operations and projects is that operations end when their objectives have been reached, whereas projects do not.
Question
 Projects should be developed in increments.
Question
 Until the 1980s, project management primarily focused on providing schedule and resource data to top management in the military, computer, and construction industries.
Question
 Every project should have a well-defined objective.
Question
 In order to be realistic, a project manager should always set discrete goals instead of a range of objectives.
Question
 Managing the triple constraint primarily involves making trade-offs between resources and quality.
Question
 The importance of stakeholders' needs and expectations is limited to the beginning of a project.
Question
 Questions about how a team will track schedule performance is related to a project's scope.
Question
 Project procurement management primarily involves identifying stakeholder needs while managing their engagement throughout the life of the project.
Question
 A project manager's primary role is to provide the funding for a project.
Question
 Opponents of a project do not belong to the category of stakeholders.
Question
 The only responsibility of a project manager is to meet the specific scope, time, and cost goals of a project.
Question
 Stakeholder analyses, work requests, and project charters are tools used in integration management.
Question
 Responsibility assignment matrices and project organizational charts are examples of tools used in procurement management.
Question
 Project resource management is concerned with making effective use of the people involved with a project.
Question
 Earned value management is a tool primarily used in resource management.
Question
 The introduction of new software makes basic tools, such as Gantt charts and network diagrams, inexpensive and easy to create.
Question
 Which knowledge area involves defining and managing all the work required to complete the project successfully?

A) Project resource management 
B) Project scope management
C) Project time management 
D) Project cost management 
Question
 Individual projects always address strategic goals whereas portfolio management addresses tactical goals.
Question
 Project procurement management mainly involves:

A) making effective use of the people involved with the project.
B) buying goods and services for a project from outside the performing organization.
C) generating, collecting, disseminating, and storing project information.
D) identifying and analyzing stakeholder?needs while managing and controlling their engagement.
Question
 To be a successful manager, the only skills an IT project manager needs to possess are excellent technical skills.
Question
 An important tool for project scope management is _____.

A) fast tracking
B) a kickoff meeting
C) a Gantt chart
D) a work breakdown structure
Question
 It is mandatory for project managers working on large information technology projects to be experts in the field of information technology.
Question
 Which project management knowledge area ensures that the project will satisfy the stated or implied needs for which it was undertaken?

A) Project cost management  
B) Project time management 
C) Project risk management  
D) Project quality management 
Question
 The role of a _____ is to provide direction and funding for a project.

A) project sponsor
B) project manager
C) support staff member
D) project team
Question
 Steve, an engineer in a construction company, is at present working on a home construction project. The home is being built for the Robinson family, the owners of the home. Steve is working with his project team and support staff to ensure the project is completed on time. In such a scenario, the project sponsor is _____.

A) Steve
B) the support staff
C) the project team
D) the Robinson family
Question
 Which project management knowledge area primarily involves generating, collecting, disseminating, and storing project information?

A) Project cost management
B) Project procurement management
C) Project time management
D) Project communications management
Question
 The enterprise project management software, which aids project and portfolio management, is a low-end tool.
Question
 Good project managers assume that their definition of success is the same as the sponsors.
Question
 Which objective is true of projects?

A) They have an indefinite beginning and end.
B) They have a unique purpose.
C) They are developed using regressive elaboration.
D) They are permanent in nature.
Question
 Which characteristic highlights a difference between projects and operations?

A) Projects are undertaken to sustain an organization's business whereas operations are not.
B) Operations are undertaken to create unique products, services, or results whereas projects are not.
C) Projects are temporary endeavors whereas an organization's operations are ongoing in nature.
D) Operations have well-defined objectives whereas projects do not need to have a unique purpose.
Question
 Effective program managers recognize that managing a project is much more complex than managing a program.
Question
 Project managers work with the project sponsors to define success for particular projects.
Question
 Program managers are change agents.
Question
 Galaxy, a construction company, buys a particular brand of tiles manufactured by Tiles and Floors, an eco-friendly tile manufacturing company. However, Tiles and Floors has declared bankruptcy and closed down. At present, Galaxy is facing a crisis because there are no other manufacturers in the market that supplies eco-friendly tiles. Which constraint is Galaxy currently facing?

A) Resources
B) Time
C) Scope
D) Cost
Question
 Which project management knowledge area is an overarching function that affects and is affected by the different knowledge areas?

A) Project cost management
B) Project stakeholder management
C) Project integration management
D) Project communications management
Question
 Which tool can best help in efficient communication management?

A) Kick-off meetings
B) Impact matrices
C) Requests for quotes
D) Fast tracking
Question
 Joe is a project manager in an IT company and has over the years, gained substantial knowledge in his area of work. However, while managing his team, he often loses his temper. In addition, he fails to be an active listener when his team members approach him with work related challenges. In which of the following areas does Joe need to develop his skills in?

A) Application area knowledge
B) Project environment knowledge
C) Standards and regulations
D) Human relations skills
Question
 A Gantt chart is a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a ____ format.

A) calendar
B) line graph
C) bar graph
D) pie chart
Question
 Team building exercises and motivation techniques are tools used in _____ management.

A) procurement
B) scope
C) resource
D) cost
Question
 A _____ is a tool used in quality management.

A) probability matrix
B) checklist
C) request for proposal
D) critical path analysis
Question
 A _____ is an organizational group responsible for coordinating the project management function throughout an organization.

A) Project Management Office
B) Project Management Professional
C) Project Management Center
D) Portfolio Group
Question
 In which of the following areas of management is payback analysis most likely to be used?

A) Resource
B) Communication
C) Cost
D) Quality
Question
 Which attribute is true of low-end tools of project management software?

A) They are designed for especially large projects with multiple users.
B) Their main advantage is that they have unlimited functionality.
C) They provide basic project management features.
D) They are referred to as enterprise project management software.
Question
 Fast tracking is an example of a tool used in _____ management.

A) schedule
B) quality
C) communication
D) risk
Question
 Which organization provides certification as a Project Management Professional?

A) PMS
B) PMC
C) PMI
D) PMP
Question
 Martha works as a project manager at a bank. Due to certain changes in external factors, Martha needs to make a few alterations in the tactical goals of her project. In such a scenario, which of the following will best help Martha cope with the change?

A) Negotiation
B) Project environment knowledge
C) Motivation
D) Soft skills
Question
 Which of the following is true of program managers?

A) They report to project managers who represent the next level in the hierarchy.
B) They recognize that managing a program is simpler than managing a project.
C) They provide leadership and direction for project managers heading the projects within a program.
D) They are responsible solely for the delivery of project results.
Question
 A _____ is a tool used in risk management.

A) work breakdown structure
B) project organizational chart
C) critical path analysis
D) probability matrix
Question
 Which statement is true of project management?

A) It is a simple discipline with a limited scope.
B) It has specific tools which work universally across all kinds of projects.
C) It does not guarantee successes for all projects.
D) Its framework consists solely of project management knowledge areas.
Question
 Which of the following refers to a set of principles that guides decision making based on personal values of what is considered right and wrong?

A) Ethics
B) Civics
C) Laws
D) Politics
Question
 A difference between strategic and tactical goals is:

A) strategic goals are more specific than tactical goals.
B) tactical goals encompass broader dimensions than strategic goals.
C) tactical goals are more important for a project than strategic goals.
D) strategic goals are long-term in nature whereas tactical goals are short-term.
Question
 Which of the following questions reflects the strategic goals of project portfolio management?

A) Are we carrying out projects well?
B) Are projects on time and on budget?
C) Are we investing in the right areas?
D) Do stakeholders know what they should be doing?
Question
 Which attribute best defines the role of leaders?

A) They focus on short-term objectives.
B) They work on achieving primarily tactical goals.
C) They work solely toward day-to-day details of meeting specific tasks.
D) They inspire people to reach goals.
Question
 Which goal distinguishes project management and portfolio management?

A) Project management involves making wise investment decisions whereas portfolio management does not.
B) Portfolio management is an easy task whereas project management is a more difficult task.
C) Portfolio management asks questions like, "Are we carrying out projects efficiently?" whereas project management asks questions such as "Are we investing in the right areas?"
D) Project management addresses specific, short-term goals whereas portfolio management focuses on long-term goals.
Question
 Which tool is most likely to be used in project schedule management?

A) Payback analysis
B) Impact matrices
C) Gantt charts
D) Fishbone diagrams
Question
 Project _____ management includes estimating how long it will take to complete the work, developing an acceptable project schedule, and ensuring timely completion of a project.
Question
 Project _____ management consists of preparing and managing the budget for a project.
Question
 A(n) _____ is "a group of related projects, subsidiary programs, and program activities managed in a coordinated manner to obtain benefits and control not available from managing them individually."
Question
 In project management, the three limitations of scope, time, and cost are referred to as the _____.
Question
 The question, "What unique product, service, or result does the customer or sponsor expect from the project?" is an example of a(n) _____ constraint.
Question
 _____ is "the application of knowledge, skills, tools, and techniques to project activities to meet project requirements."
Question
 Project management _____ describe the key competencies that project managers must develop.
Question
 _____ include people, hardware, software, or other assets.
Question
 Soft skills are also known as _____ skills.
Question
 "What is the project's budget?" This is an example of a project's _____ constraint.
Question
 The term "_____" refers to work done in organizations to sustain the business.
Question
 _____ refers to the process in which organizations group and manage projects and programs as a portfolio of investments that contribute to the entire enterprise's success.
Question
 A(n) _____ is a temporary endeavor undertaken to create a unique product, service, or result.
Question
 What is a difference between low-end and midrange tools of the project management software?

A) Low-end tools are designed to handle primarily multiple users whereas midrange tools are created to handle single users.
B) Low-end tools provide robust capabilities to handle dispersed workgroups whereas midrange tools do not.
C) Midrange tools provide basic project management features whereas low-end tools offer enterprise and portfolio management functions.
D) Midrange tools are designed to handle larger projects than low-end tools.
Question
 A project's sponsor is also known as a(n) _____.
Question
 The _____ of project management includes quality, scope, time, and cost constraints.
Question
 The question, "What is the project's schedule?" is an example of a(n) _____ constraint.
Question
 Until the 1980s, project management primarily focused on providing _____ and resource data to top management in the military, computer, and construction industries.
Question
 Enterprise project management software is also known as a _____ tool of project management software.

A) baseline
B) midrange
C) low-end
D) high-end
Question
 Which type of tool is usually recommended for small projects and single users?

A) Low-end
B) Midrange
C) High-end
D) Upper range
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/91
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 1: Introduction to Project Management
1
 The primary role of project stakeholder management is to ensure that the project will satisfy the stated needs for which it was undertaken.
False
Explanation: Project management knowledge areas describe the key competencies that project managers must develop. Project stakeholder management includes identifying and analyzing stakeholder needs while managing and controlling their engagement throughout the life of the project.
2
 A project's stakeholders include its customers, users, and suppliers.
True
Explanation: Stakeholders are the people involved in or affected by project activities, and include the project sponsor, project team, support staff, customers, users, suppliers, and even opponents of a project.
3
 Maturity models, statistical methods, and test plans are examples of tools used in quality management.
True
Explanation: Quality metrics, maturity models, statistical methods, and test plans are some of the tools used in quality management.
4
 One of the main reasons why project management is challenging is because of the factor of uncertainty.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
5
 A difference between operations and projects is that operations end when their objectives have been reached, whereas projects do not.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
6
 Projects should be developed in increments.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
7
 Until the 1980s, project management primarily focused on providing schedule and resource data to top management in the military, computer, and construction industries.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
8
 Every project should have a well-defined objective.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
9
 In order to be realistic, a project manager should always set discrete goals instead of a range of objectives.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
10
 Managing the triple constraint primarily involves making trade-offs between resources and quality.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
11
 The importance of stakeholders' needs and expectations is limited to the beginning of a project.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
12
 Questions about how a team will track schedule performance is related to a project's scope.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
13
 Project procurement management primarily involves identifying stakeholder needs while managing their engagement throughout the life of the project.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
14
 A project manager's primary role is to provide the funding for a project.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
15
 Opponents of a project do not belong to the category of stakeholders.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
16
 The only responsibility of a project manager is to meet the specific scope, time, and cost goals of a project.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
17
 Stakeholder analyses, work requests, and project charters are tools used in integration management.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
18
 Responsibility assignment matrices and project organizational charts are examples of tools used in procurement management.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
19
 Project resource management is concerned with making effective use of the people involved with a project.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
20
 Earned value management is a tool primarily used in resource management.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
21
 The introduction of new software makes basic tools, such as Gantt charts and network diagrams, inexpensive and easy to create.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
22
 Which knowledge area involves defining and managing all the work required to complete the project successfully?

A) Project resource management 
B) Project scope management
C) Project time management 
D) Project cost management 
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
23
 Individual projects always address strategic goals whereas portfolio management addresses tactical goals.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
24
 Project procurement management mainly involves:

A) making effective use of the people involved with the project.
B) buying goods and services for a project from outside the performing organization.
C) generating, collecting, disseminating, and storing project information.
D) identifying and analyzing stakeholder?needs while managing and controlling their engagement.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
25
 To be a successful manager, the only skills an IT project manager needs to possess are excellent technical skills.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
26
 An important tool for project scope management is _____.

A) fast tracking
B) a kickoff meeting
C) a Gantt chart
D) a work breakdown structure
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
27
 It is mandatory for project managers working on large information technology projects to be experts in the field of information technology.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
28
 Which project management knowledge area ensures that the project will satisfy the stated or implied needs for which it was undertaken?

A) Project cost management  
B) Project time management 
C) Project risk management  
D) Project quality management 
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
29
 The role of a _____ is to provide direction and funding for a project.

A) project sponsor
B) project manager
C) support staff member
D) project team
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
30
 Steve, an engineer in a construction company, is at present working on a home construction project. The home is being built for the Robinson family, the owners of the home. Steve is working with his project team and support staff to ensure the project is completed on time. In such a scenario, the project sponsor is _____.

A) Steve
B) the support staff
C) the project team
D) the Robinson family
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
31
 Which project management knowledge area primarily involves generating, collecting, disseminating, and storing project information?

A) Project cost management
B) Project procurement management
C) Project time management
D) Project communications management
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
32
 The enterprise project management software, which aids project and portfolio management, is a low-end tool.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
33
 Good project managers assume that their definition of success is the same as the sponsors.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
34
 Which objective is true of projects?

A) They have an indefinite beginning and end.
B) They have a unique purpose.
C) They are developed using regressive elaboration.
D) They are permanent in nature.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
35
 Which characteristic highlights a difference between projects and operations?

A) Projects are undertaken to sustain an organization's business whereas operations are not.
B) Operations are undertaken to create unique products, services, or results whereas projects are not.
C) Projects are temporary endeavors whereas an organization's operations are ongoing in nature.
D) Operations have well-defined objectives whereas projects do not need to have a unique purpose.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
36
 Effective program managers recognize that managing a project is much more complex than managing a program.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
37
 Project managers work with the project sponsors to define success for particular projects.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
38
 Program managers are change agents.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
39
 Galaxy, a construction company, buys a particular brand of tiles manufactured by Tiles and Floors, an eco-friendly tile manufacturing company. However, Tiles and Floors has declared bankruptcy and closed down. At present, Galaxy is facing a crisis because there are no other manufacturers in the market that supplies eco-friendly tiles. Which constraint is Galaxy currently facing?

A) Resources
B) Time
C) Scope
D) Cost
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
40
 Which project management knowledge area is an overarching function that affects and is affected by the different knowledge areas?

A) Project cost management
B) Project stakeholder management
C) Project integration management
D) Project communications management
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
41
 Which tool can best help in efficient communication management?

A) Kick-off meetings
B) Impact matrices
C) Requests for quotes
D) Fast tracking
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
42
 Joe is a project manager in an IT company and has over the years, gained substantial knowledge in his area of work. However, while managing his team, he often loses his temper. In addition, he fails to be an active listener when his team members approach him with work related challenges. In which of the following areas does Joe need to develop his skills in?

A) Application area knowledge
B) Project environment knowledge
C) Standards and regulations
D) Human relations skills
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
43
 A Gantt chart is a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a ____ format.

A) calendar
B) line graph
C) bar graph
D) pie chart
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
44
 Team building exercises and motivation techniques are tools used in _____ management.

A) procurement
B) scope
C) resource
D) cost
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
45
 A _____ is a tool used in quality management.

A) probability matrix
B) checklist
C) request for proposal
D) critical path analysis
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
46
 A _____ is an organizational group responsible for coordinating the project management function throughout an organization.

A) Project Management Office
B) Project Management Professional
C) Project Management Center
D) Portfolio Group
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
47
 In which of the following areas of management is payback analysis most likely to be used?

A) Resource
B) Communication
C) Cost
D) Quality
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
48
 Which attribute is true of low-end tools of project management software?

A) They are designed for especially large projects with multiple users.
B) Their main advantage is that they have unlimited functionality.
C) They provide basic project management features.
D) They are referred to as enterprise project management software.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
49
 Fast tracking is an example of a tool used in _____ management.

A) schedule
B) quality
C) communication
D) risk
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
50
 Which organization provides certification as a Project Management Professional?

A) PMS
B) PMC
C) PMI
D) PMP
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
51
 Martha works as a project manager at a bank. Due to certain changes in external factors, Martha needs to make a few alterations in the tactical goals of her project. In such a scenario, which of the following will best help Martha cope with the change?

A) Negotiation
B) Project environment knowledge
C) Motivation
D) Soft skills
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
52
 Which of the following is true of program managers?

A) They report to project managers who represent the next level in the hierarchy.
B) They recognize that managing a program is simpler than managing a project.
C) They provide leadership and direction for project managers heading the projects within a program.
D) They are responsible solely for the delivery of project results.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
53
 A _____ is a tool used in risk management.

A) work breakdown structure
B) project organizational chart
C) critical path analysis
D) probability matrix
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
54
 Which statement is true of project management?

A) It is a simple discipline with a limited scope.
B) It has specific tools which work universally across all kinds of projects.
C) It does not guarantee successes for all projects.
D) Its framework consists solely of project management knowledge areas.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
55
 Which of the following refers to a set of principles that guides decision making based on personal values of what is considered right and wrong?

A) Ethics
B) Civics
C) Laws
D) Politics
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
56
 A difference between strategic and tactical goals is:

A) strategic goals are more specific than tactical goals.
B) tactical goals encompass broader dimensions than strategic goals.
C) tactical goals are more important for a project than strategic goals.
D) strategic goals are long-term in nature whereas tactical goals are short-term.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
57
 Which of the following questions reflects the strategic goals of project portfolio management?

A) Are we carrying out projects well?
B) Are projects on time and on budget?
C) Are we investing in the right areas?
D) Do stakeholders know what they should be doing?
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
58
 Which attribute best defines the role of leaders?

A) They focus on short-term objectives.
B) They work on achieving primarily tactical goals.
C) They work solely toward day-to-day details of meeting specific tasks.
D) They inspire people to reach goals.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
59
 Which goal distinguishes project management and portfolio management?

A) Project management involves making wise investment decisions whereas portfolio management does not.
B) Portfolio management is an easy task whereas project management is a more difficult task.
C) Portfolio management asks questions like, "Are we carrying out projects efficiently?" whereas project management asks questions such as "Are we investing in the right areas?"
D) Project management addresses specific, short-term goals whereas portfolio management focuses on long-term goals.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
60
 Which tool is most likely to be used in project schedule management?

A) Payback analysis
B) Impact matrices
C) Gantt charts
D) Fishbone diagrams
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
61
 Project _____ management includes estimating how long it will take to complete the work, developing an acceptable project schedule, and ensuring timely completion of a project.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
62
 Project _____ management consists of preparing and managing the budget for a project.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
63
 A(n) _____ is "a group of related projects, subsidiary programs, and program activities managed in a coordinated manner to obtain benefits and control not available from managing them individually."
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
64
 In project management, the three limitations of scope, time, and cost are referred to as the _____.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
65
 The question, "What unique product, service, or result does the customer or sponsor expect from the project?" is an example of a(n) _____ constraint.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
66
 _____ is "the application of knowledge, skills, tools, and techniques to project activities to meet project requirements."
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
67
 Project management _____ describe the key competencies that project managers must develop.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
68
 _____ include people, hardware, software, or other assets.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
69
 Soft skills are also known as _____ skills.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
70
 "What is the project's budget?" This is an example of a project's _____ constraint.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
71
 The term "_____" refers to work done in organizations to sustain the business.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
72
 _____ refers to the process in which organizations group and manage projects and programs as a portfolio of investments that contribute to the entire enterprise's success.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
73
 A(n) _____ is a temporary endeavor undertaken to create a unique product, service, or result.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
74
 What is a difference between low-end and midrange tools of the project management software?

A) Low-end tools are designed to handle primarily multiple users whereas midrange tools are created to handle single users.
B) Low-end tools provide robust capabilities to handle dispersed workgroups whereas midrange tools do not.
C) Midrange tools provide basic project management features whereas low-end tools offer enterprise and portfolio management functions.
D) Midrange tools are designed to handle larger projects than low-end tools.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
75
 A project's sponsor is also known as a(n) _____.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
76
 The _____ of project management includes quality, scope, time, and cost constraints.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
77
 The question, "What is the project's schedule?" is an example of a(n) _____ constraint.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
78
 Until the 1980s, project management primarily focused on providing _____ and resource data to top management in the military, computer, and construction industries.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
79
 Enterprise project management software is also known as a _____ tool of project management software.

A) baseline
B) midrange
C) low-end
D) high-end
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
80
 Which type of tool is usually recommended for small projects and single users?

A) Low-end
B) Midrange
C) High-end
D) Upper range
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 91 flashcards in this deck.