 The executing process group generally requires the most resources.
Use Space or
up arrow
down arrow
to flip the card.
Question
 The WBS provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.
Question
 Initiating processes are not required to end a project.
Question
 The output of the stakeholder management strategy results is a project charter.
Question
 Identifying the project sponsor is a pre-initiation task.
Question
 In the Scrum method, team members work as a self-directed group coached by the ScrumMaster.
Question
 Key outcomes of the executing process group are formal acceptance of the work and creation of closing documents.
Question
 The level of activity and length of each process group varies for every project.
Question
 Project initiation involves taking the actions necessary to ensure that activities in the project plan are completed.
Question
 Agile methods are used when deliverables have a low degree of change.
Question
 An organization's project management plan expresses the vision, mission, goals, objectives, and strategies of the organization.
Question
 The kick-off meeting is always held before the business case and project charter are completed.
Question
 Initiating processes take place during each phase of a project.
Question
 Initiating and closing tasks are usually the longest and require the most amount of resources and time.
Question
 The Rational Unified Process (RUP) framework is incompatible with the PMBOK process.
Question
 Many project management activities occur as part of the planning process group.
Question
 Decisions and actions taken in one knowledge area at a certain time rarely affect other knowledge areas.
Question
 A milestone list is an output associated with the Project Scope Management knowledge area.
Question
 Monitoring and controlling processes overlap all of the other project management process groups.
Question
 The DMAIC (Define, Measure, Analyze, Improve, and Control) methodology of the Six Sigma projects, is used to improve an existing business process.
Question
 The project stakeholder management knowledge area maps to which process group by identifying stakeholders?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Question
 The pre-initiation phase of a project using the Scrum method does not involve project charters, stakeholder management strategy, and kick-off meetings.
Question
 The two main items for monitoring and controlling in the Scrum framework are the daily Scrum and the sprint retrospectives.
Question
 Which is an example of a pre-initiation task?

A) Drawing up a work breakdown structure
B) Developing a business case for a project
C) Drafting the project charter
D) Identifying stakeholders
Question
 The project cost management knowledge area maps to which process group through the activities of estimating costs and budget determination?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Question
 The project scope management knowledge area maps to which process group through the activities of scope validation and scope control?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Question
 What is developed in the Project Integration Management knowledge area?

A) schedule management plan
B) project management plan
C) WBS
D) quality management
Question
 Which framework is an iterative software development process that focuses on team productivity and delivers software best practices to all team members?

A) Agile Unified Process
B) Dynamic Systems Development Method
C) Rational Unified Process
D) Six Sigma
Question
 Administrative activities, such as archiving project files, closing out contracts, documenting lessons learned, and receiving formal acceptance of the delivered work as part of the phase or project, are often involved in which processes?

A) monitoring and controlling
B) executing
C) initiating
D) closing
Question
 The burndown chart is a Scrum created artifact that provides a list of features prioritized by business value.
Question
 What processes include defining and authorizing a project or project phase?

A) Initiating
B) Planning
C) Executing
D) Monitoring and controlling
Question
 Kick-off meeting agendas are usually recorded in a Word document.
Question
 What processes include devising and maintaining a workable scheme to ensure that the project addresses the organization's needs?

A) Initiating
B) Planning
C) Executing
D) Monitoring and controlling
Question
 The project schedule management knowledge area maps to which process group through the activity of schedule control?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Question
 The organization recognizes that a new project exists and completes a project charter during which processes for a new project?

A) initiating
B) planning
C) opening
D) controlling
Question
 A sprint review is a meeting in which the team demonstrates to the product owner what it has completed during the sprint.
Question
 Which processes include acquiring and developing the project team, performing quality assurance, distributing information, managing stakeholder expectations, and conducting procurements?

A) monitoring and controlling
B) executing
C) planning
D) initiating
Question
 Reporting performance, where project stakeholders can identify any necessary changes that may be required to keep the project on track, is a common part of which process?

A) executing
B) closing
C) monitoring and controlling
D) planning
Question
 What process group does the project integration management knowledge area map to through the activities of developing project charters?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Question
 Which planning process is within the Project Scope Management knowledge area?

A) Schedule development
B) Developing a project management plan
C) Creation of a WBS
D) Quality planning
Question
 Which planning process is associated with project scope management?

A) Collecting requirements
B) Performing qualitative risk analysis
C) Planning schedule management
D) Estimating costs
Question
 A _____ is usually not necessary to the Scrum method, because Scrum implies that team members work as a self-directed group.

A) team charter
B) velocity estimate
C) Gantt chart
D) product backlog
Question
 A(n)_____ is a series of actions directed toward a particular result.
Question
 What tool provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance?

A) scope statement
B) cost management plan
C) work breakdown structure
D) project charter
Question
 Which is true about the agile method?

A) It is often used when a project team can express the scope early in the product life cycle.
B) It is used when a project team wants to provide a potentially shippable product earlier rather than later.
C) It uses several iterations or deliveries of software instead of waiting until the end of the project to provide a product.
D) It is used when project teams want to use the predicative approach to a project.
Question
 What process provides enterprise environmental factors as an output?

A) project integration management
B) project quality management
C) project human resource management
D) project procurement management
Question
 What is the main purpose of project plans?

A) schedule management plans
B) define project scope
C) estimate activity resources
D) guide project execution
Question
 The project management plan is the output of which project planning process?

A) integration management
B) quality management
C) scope management
D) procurement management
Question
 What is one of the main outputs of the initiation process?

A) creating the work breakdown structure
B) selecting the project manager
C) developing the project charter
D) identifying the project sponsor
Question
 Which activity is a part of the Scrum planning process?

A) Determining how many sprints will compose each release
B) Demonstrating the product during a sprint review meeting
C) Completing tasks each day during sprints
D) Creating sprint backlog
Question
 Which process involves gaining stakeholder and customer acceptance of the final products and services and bringing the project, or project phase, to an orderly end?

A) executing
B) closing
C) planning
D) monitoring
Question
 _____ progress from initiation activities to planning activities, executing activities, monitoring and controlling activities, and closing activities.
Question
 Which process includes measuring progress toward project objectives and taking corrective action to match progress with the plan?

A) Planning
B) Monitoring and controlling
C) Executing
D) Initiating
Question
 In the Scrum method, during which meeting is the improvement of the product and process discussed?

A) sprint retrospective
B) sprint review
C) kick-off
D) daily Scrum
Question
 The ideal outcome of the _____ process group is to complete a project successfully by delivering the agreed-upon project scope within time, cost, and quality constraints.
Question
 What important Scrum artifact is used to graphically display progress on each sprint during the monitoring and controlling process?

A) WBS
B) sprint backlog
C) burndown chart
D) product backlog
Question
 An organizational process assets update is the output of which closing process?

A) project integration management
B) project quality management
C) project procurement management
D) project time management
Question
 Which are outputs of the executing process of project integration management?

A) Deliverables
B) Issue logs
C) Resource calendars
D) Enterprise environmental factor updates
Question
 What is often the most difficult and unappreciated process in project management?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Question
 Which project would be compatible with the use of the agile approach?

A) Projects with inexperienced and dispersed teams
B) Projects that have a fairly rigid completion date
C) Projects with clear-up front requirements
D) Projects that have more flexible scheduling
Question
 A(n) _____ is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans.
Question
 A(n) _____ describes how things should be done.
Question
 _________ issues often occur during project execution, especially conflicts.
Question
 List and describe the five process management groups.
Question
 _____ the project includes work required to introduce any new hardware, software, and procedures into normal operations.
Question
 If done well, the _________ can produce several releases of useful software.
Question
 A(n) _____ is the person responsible for the business value of the project and for deciding what work to do and in what order when using a Scrum method.
Question
 _____ are people involved in or affected by project activities and include the project sponsor, project team, support staff, customers, users, suppliers, and even opponents to the project.
Question
 _____ are short descriptions written by customers of what they need a Scrum system to do for them.
Question
 A(n) _____ is a Scrum artifact and consists of the highest-priority items from the product backlog to be completed in a sprint.
Question
 The most time and money should be spent on ______.
Question
 In Scrum, a(n) _____ is a useful object created by people.
Question
 What is a methodology and what are some methodologies other than the PMBOK Guide do organizations use as a basis for project management methodology?
Question
 _____ is a project management methodology that defines 45 separate subprocesses and organizes these into eight process groups.
Question
 The _____  is a very important tool in project management because it provides the basis for deciding how to do the work.
Question
 A(n) _____ is a cross-functional team of five to nine people who organize themselves and the work to produce the desired results for each sprint.
Question
 A(n) _____ is a set period of time, normally two to four weeks, during which specific work must be completed and made ready for review when using Scrum methods.
Question
 A risk register is the output of _____.
Question
 A(n) _____ is the person who ensures that the team is productive, facilitates the daily Scrum, enables close cooperation across all roles and functions, and removes barriers that prevent the team from being effective.
Question
 A(n) _____ is a document that includes stakeholders' roles, names, organizations, and contact information.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/83
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: The Project Management Process Groups
1
 The executing process group generally requires the most resources.
True
Explanation: The executing process group takes the actions necessary to complete the work described in the planning activities. It should overlap the other process groups, and generally requires the most resources.
2
 The WBS provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.
True
Explanation: The WBS is a very important tool in project management because it provides the basis for deciding how to do the work. The WBS also provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.
3
 Initiating processes are not required to end a project.
False
Explanation: Initiating processes are also required to end a project. Someone must initiate activities to ensure that the project team completes all the work, documents lessons learned, assigns project resources, and that the customer accepts the work.
4
 The output of the stakeholder management strategy results is a project charter.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
5
 Identifying the project sponsor is a pre-initiation task.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
6
 In the Scrum method, team members work as a self-directed group coached by the ScrumMaster.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
7
 Key outcomes of the executing process group are formal acceptance of the work and creation of closing documents.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
8
 The level of activity and length of each process group varies for every project.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
9
 Project initiation involves taking the actions necessary to ensure that activities in the project plan are completed.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
10
 Agile methods are used when deliverables have a low degree of change.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
11
 An organization's project management plan expresses the vision, mission, goals, objectives, and strategies of the organization.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
12
 The kick-off meeting is always held before the business case and project charter are completed.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
13
 Initiating processes take place during each phase of a project.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
14
 Initiating and closing tasks are usually the longest and require the most amount of resources and time.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
15
 The Rational Unified Process (RUP) framework is incompatible with the PMBOK process.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
16
 Many project management activities occur as part of the planning process group.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
17
 Decisions and actions taken in one knowledge area at a certain time rarely affect other knowledge areas.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
18
 A milestone list is an output associated with the Project Scope Management knowledge area.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
19
 Monitoring and controlling processes overlap all of the other project management process groups.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
20
 The DMAIC (Define, Measure, Analyze, Improve, and Control) methodology of the Six Sigma projects, is used to improve an existing business process.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
21
 The project stakeholder management knowledge area maps to which process group by identifying stakeholders?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
22
 The pre-initiation phase of a project using the Scrum method does not involve project charters, stakeholder management strategy, and kick-off meetings.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
23
 The two main items for monitoring and controlling in the Scrum framework are the daily Scrum and the sprint retrospectives.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
24
 Which is an example of a pre-initiation task?

A) Drawing up a work breakdown structure
B) Developing a business case for a project
C) Drafting the project charter
D) Identifying stakeholders
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
25
 The project cost management knowledge area maps to which process group through the activities of estimating costs and budget determination?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
26
 The project scope management knowledge area maps to which process group through the activities of scope validation and scope control?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
27
 What is developed in the Project Integration Management knowledge area?

A) schedule management plan
B) project management plan
C) WBS
D) quality management
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
28
 Which framework is an iterative software development process that focuses on team productivity and delivers software best practices to all team members?

A) Agile Unified Process
B) Dynamic Systems Development Method
C) Rational Unified Process
D) Six Sigma
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
29
 Administrative activities, such as archiving project files, closing out contracts, documenting lessons learned, and receiving formal acceptance of the delivered work as part of the phase or project, are often involved in which processes?

A) monitoring and controlling
B) executing
C) initiating
D) closing
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
30
 The burndown chart is a Scrum created artifact that provides a list of features prioritized by business value.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
31
 What processes include defining and authorizing a project or project phase?

A) Initiating
B) Planning
C) Executing
D) Monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
32
 Kick-off meeting agendas are usually recorded in a Word document.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
33
 What processes include devising and maintaining a workable scheme to ensure that the project addresses the organization's needs?

A) Initiating
B) Planning
C) Executing
D) Monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
34
 The project schedule management knowledge area maps to which process group through the activity of schedule control?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
35
 The organization recognizes that a new project exists and completes a project charter during which processes for a new project?

A) initiating
B) planning
C) opening
D) controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
36
 A sprint review is a meeting in which the team demonstrates to the product owner what it has completed during the sprint.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
37
 Which processes include acquiring and developing the project team, performing quality assurance, distributing information, managing stakeholder expectations, and conducting procurements?

A) monitoring and controlling
B) executing
C) planning
D) initiating
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
38
 Reporting performance, where project stakeholders can identify any necessary changes that may be required to keep the project on track, is a common part of which process?

A) executing
B) closing
C) monitoring and controlling
D) planning
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
39
 What process group does the project integration management knowledge area map to through the activities of developing project charters?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
40
 Which planning process is within the Project Scope Management knowledge area?

A) Schedule development
B) Developing a project management plan
C) Creation of a WBS
D) Quality planning
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
41
 Which planning process is associated with project scope management?

A) Collecting requirements
B) Performing qualitative risk analysis
C) Planning schedule management
D) Estimating costs
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
42
 A _____ is usually not necessary to the Scrum method, because Scrum implies that team members work as a self-directed group.

A) team charter
B) velocity estimate
C) Gantt chart
D) product backlog
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
43
 A(n)_____ is a series of actions directed toward a particular result.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
44
 What tool provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance?

A) scope statement
B) cost management plan
C) work breakdown structure
D) project charter
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
45
 Which is true about the agile method?

A) It is often used when a project team can express the scope early in the product life cycle.
B) It is used when a project team wants to provide a potentially shippable product earlier rather than later.
C) It uses several iterations or deliveries of software instead of waiting until the end of the project to provide a product.
D) It is used when project teams want to use the predicative approach to a project.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
46
 What process provides enterprise environmental factors as an output?

A) project integration management
B) project quality management
C) project human resource management
D) project procurement management
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
47
 What is the main purpose of project plans?

A) schedule management plans
B) define project scope
C) estimate activity resources
D) guide project execution
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
48
 The project management plan is the output of which project planning process?

A) integration management
B) quality management
C) scope management
D) procurement management
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
49
 What is one of the main outputs of the initiation process?

A) creating the work breakdown structure
B) selecting the project manager
C) developing the project charter
D) identifying the project sponsor
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
50
 Which activity is a part of the Scrum planning process?

A) Determining how many sprints will compose each release
B) Demonstrating the product during a sprint review meeting
C) Completing tasks each day during sprints
D) Creating sprint backlog
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
51
 Which process involves gaining stakeholder and customer acceptance of the final products and services and bringing the project, or project phase, to an orderly end?

A) executing
B) closing
C) planning
D) monitoring
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
52
 _____ progress from initiation activities to planning activities, executing activities, monitoring and controlling activities, and closing activities.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
53
 Which process includes measuring progress toward project objectives and taking corrective action to match progress with the plan?

A) Planning
B) Monitoring and controlling
C) Executing
D) Initiating
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
54
 In the Scrum method, during which meeting is the improvement of the product and process discussed?

A) sprint retrospective
B) sprint review
C) kick-off
D) daily Scrum
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
55
 The ideal outcome of the _____ process group is to complete a project successfully by delivering the agreed-upon project scope within time, cost, and quality constraints.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
56
 What important Scrum artifact is used to graphically display progress on each sprint during the monitoring and controlling process?

A) WBS
B) sprint backlog
C) burndown chart
D) product backlog
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
57
 An organizational process assets update is the output of which closing process?

A) project integration management
B) project quality management
C) project procurement management
D) project time management
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
58
 Which are outputs of the executing process of project integration management?

A) Deliverables
B) Issue logs
C) Resource calendars
D) Enterprise environmental factor updates
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
59
 What is often the most difficult and unappreciated process in project management?

A) initiating
B) planning
C) executing
D) monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
60
 Which project would be compatible with the use of the agile approach?

A) Projects with inexperienced and dispersed teams
B) Projects that have a fairly rigid completion date
C) Projects with clear-up front requirements
D) Projects that have more flexible scheduling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
61
 A(n) _____ is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
62
 A(n) _____ describes how things should be done.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
63
 _________ issues often occur during project execution, especially conflicts.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
64
 List and describe the five process management groups.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
65
 _____ the project includes work required to introduce any new hardware, software, and procedures into normal operations.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
66
 If done well, the _________ can produce several releases of useful software.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
67
 A(n) _____ is the person responsible for the business value of the project and for deciding what work to do and in what order when using a Scrum method.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
68
 _____ are people involved in or affected by project activities and include the project sponsor, project team, support staff, customers, users, suppliers, and even opponents to the project.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
69
 _____ are short descriptions written by customers of what they need a Scrum system to do for them.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
70
 A(n) _____ is a Scrum artifact and consists of the highest-priority items from the product backlog to be completed in a sprint.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
71
 The most time and money should be spent on ______.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
72
 In Scrum, a(n) _____ is a useful object created by people.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
73
 What is a methodology and what are some methodologies other than the PMBOK Guide do organizations use as a basis for project management methodology?
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
74
 _____ is a project management methodology that defines 45 separate subprocesses and organizes these into eight process groups.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
75
 The _____  is a very important tool in project management because it provides the basis for deciding how to do the work.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
76
 A(n) _____ is a cross-functional team of five to nine people who organize themselves and the work to produce the desired results for each sprint.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
77
 A(n) _____ is a set period of time, normally two to four weeks, during which specific work must be completed and made ready for review when using Scrum methods.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
78
 A risk register is the output of _____.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
79
 A(n) _____ is the person who ensures that the team is productive, facilitates the daily Scrum, enables close cooperation across all roles and functions, and removes barriers that prevent the team from being effective.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
80
 A(n) _____ is a document that includes stakeholders' roles, names, organizations, and contact information.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 83 flashcards in this deck.