Deck 6: Project Schedule Management

Full screen (f)
exit full mode
Question
 In project schedule management, the primary output of defining activities is a schedule management plan.
Use Space or
up arrow
down arrow
to flip the card.
Question
 A merge occurs when one node precedes multiple nodes.
Question
 In a critical path analysis, the shortest path is what drives the completion date for the project.
Question
 Milestones are easy to achieve and are always achieved through one main activity.
Question
 A disadvantage of using Gantt charts is that they do not provide a standard format for displaying planned project schedule information.
Question
 To define activities, the project team should start with reviewing the schedule management plan, scope baseline, enterprise environmental factors, and organizational processes.
Question
 A schedule management plan includes information which describes the format and frequency of schedule reports required for the project.
Question
 Start-to-finish relationships are the most frequently used dependencies between activities.
Question
 A drawback of the precedence diagramming method is that it cannot be used unless dummy activities are employed.
Question
 An activity is an element of work that has an expected duration, cost, and resource requirements.
Question
 A Tracking Gantt chart is based on the percentage of work completed for project tasks or the actual start and finish dates.
Question
 In project schedule management, the next step after sequencing activities is to define these activities.
Question
 A dependency pertains to the sequencing of project activities or tasks.
Question
 In a Gantt chart, thick black bars represent milestones achieved in a project.
Question
 In a network diagram, it is mandatory for every item on the WBS to be shown instead of only those activities with dependencies.
Question
 After defining project activities, the next step in project schedule management is developing the schedule.
Question
 The arrows in a network diagram represent missed milestones in a project.
Question
 Project schedules grow out of basic documents such as the project charter.
Question
 Network diagrams are the preferred technique for showing activity sequencing.
Question
 It is important for the activity list and activity attributes to be in agreement with the work breakdown structure.
Question
 Which statement best describes the difference between an activity list and an activity attribute?

A) As opposed to an activity attribute, an activity list provides resource requirements and constraints related to activities.
B) An activity list provides a more concrete list of milestones for a project than an activity attribute.
C) An activity attribute is a tabulation of activities to be included on a project schedule whereas an activity list is not.
D) An activity attribute provides more schedule-related information about each activity than an activity list.
Question
 Which document is most likely to include planned project start and end dates which serve as the starting points for a detailed schedule?

A) resource breakdown structure
B) milestones list
C) organizational process assets update
D) project charter
Question
 In project schedule management, which process involves analyzing activity sequences, activity resource estimates, and activity duration estimates to create the project schedule?

A) planning schedule management
B) developing the schedule
C) controlling the schedule
D) defining activities
Question
 In project schedule management, which process primarily involves checking and managing changes to the project schedule?

A) estimating activity durations
B) developing the schedule
C) controlling the schedule
D) estimating activity resources
Question
 Critical chain scheduling assumes that resources multitask and maximizes multitasking.
Question
 Knowing the amount of float allows project managers to know whether a project schedule is flexible.
Question
 In project schedule management, which process involves estimating the number of work periods that are needed to complete individual activities?

A) defining activities
B) sequencing activities
C) planning schedule management
D) estimating activity durations
Question
 A drawback of the project management software is that it does not have the capacity to calculate the critical path(s) for a project.
Question
 Which process in project schedule management involves identifying the specific tasks that the project team members and stakeholders must perform to produce the project deliverables?

A) defining activities
B) sequencing activities
C) developing the schedule
D) estimating activity durations
Question
 A backward pass through the network diagram determines the early start and early finish dates for each activity.
Question
 What is the first process involved in project schedule management?

A) defining activities
B) estimating activity durations
C) planning schedule management
D) sequencing activities
Question
 In project schedule management, which process primarily involve identifying and documenting the relationships between project activities?

A) defining activities
B) sequencing activities
C) planning schedule management
D) estimating activity durations
Question
 The final process in project schedule management is developing the schedule.
Question
 In project schedule management, which process generates the main outputs of an activity list, activity attributes, and a milestone list?

A) sequencing activities
B) defining activities
C) resource estimating activities
D) estimating activity durations
Question
 The critical path on a project can change as the project progresses.
Question
 Which term is used for a significant event on a project that normally has no duration?

A) milestone
B) activity attribute
C) activity sequence
D) schedule baseline
Question
 In project schedule management, which is an output of controlling the schedule?

A) activity duration estimate
B) project management plan update
C) activity attribute
D) milestones list
Question
 The technique of fast tracking can result in lengthening the project schedule.
Question
 The main disadvantage of crashing is that it lengthens the time needed to finish a project.
Question
 One of PERT's main disadvantages is that it does not address the risk associated with duration estimates.
Question
 Which is one of the main outputs of estimating activity resources process?

A) project documents update
B) milestone list
C) breakdown structure
D) activity duration estimate
Question
 In project schedule management, what is the next step after defining project activities?

A) planning schedule management
B) determining their dependencies
C) controlling the schedule
D) estimating activity duration
Question
 During which relationship is the "from" activity unable start until the "to" activity is started?

A) start-to-start
B) finish-to-finish
C) finish-to-start
D) start-to-finish
Question
 What term is used for the amount of time an activity can be delayed without delaying the early start date of any immediately following activities?

A) forward pass
B) backward pass
C) fast tracking
D) free slack
Question
 Which dependencies do AOA network diagrams use?

A) start-to-start
B) finish-to-start
C) finish-to-finish
D) start-to-finish
Question
 In project schedule management, the main goal of which process is to ensure that the project team has complete understanding of all the work they must do as part of the project scope so they can start scheduling the work?

A) defining activities
B) estimating activity durations
C) estimating activity resources
D) controlling the schedule
Question
 Which technique involves network diagramming and is used primarily to predict total project duration?

A) Gantt chart
B) critical path analysis
C) resource breakdown structure
D) arrow diagramming method
Question
 Which type of dependencies are inherent in the nature of work being performed on a project?

A) mandatory
B) discretionary
C) external
D) random
Question
 Which is true of a finish-to-finish dependency?

A) It is a dependency in which the "from" activity cannot start until the "to" activity or successor is started.
B) It is a dependency in which in which the "from" activity must finish before the "to" activity or successor can start.
C) It is a dependency in which the "from" activity must be finished before the "to" activity can be finished.
D) It is a dependency in which the "from" activity must start before the "to" activity can be finished.
Question
 Which network diagramming technique uses boxes to represent activities?

A) PDM
B) CPM
C) ADM
D) PERT
Question
 What is the latest possible time an activity might begin without delaying the project finish date?

A) early finish date
B) late finish date
C) late start date
D) early start date
Question
 The critical path is the _____ path through a network diagram, and it represents the _____ amount of slack or float.

A) longest; longest
B) longest; shortest
C) shortest; longest
D) shortest; shortest
Question
 Which dependencies involve relationships between project and non-project activities?

A) mandatory
B) discretionary
C) external
D) inherent
Question
 What term is used for the amount of time an activity can be delayed from its early start without delaying the planned project finish date?

A) total slack
B) free float
C) backward pass
D) forward pass
Question
 Which provide a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a calendar format?

A) Gantt charts
B) Critical path analysis
C) Arrow diagramming method
D) PERT analysis
Question
 Which is true of dummy activities?

A) They have long durations.
B) They show logical relationships between activities.
C) They have a large range of resources.
D) They have limited time periods.
Question
 In project schedule management, the ultimate goal of which process is to provide a basis for monitoring project progress for the time dimension of the project?

A) defining activities
B) sequencing activities
C) developing a schedule
D) estimating activity resources
Question
 In an AOA network diagram, what occurs when two or more activities follow a single node?

A) combinations
B) buffers
C) mergers
D) bursts
Question
 After working with key stakeholders to define activities and calculate their resources, what is the next process in project schedule management?

A) develop the schedule.
B) control the schedule.
C) determine their dependencies.
D) estimate the duration of activities.
Question
 Which dependencies are sometimes referred to as soft logic and should be used with care because they may limit later scheduling options?

A) mandatory
B) discretionary
C) external
D) inherent
Question
 _____ have no duration and no resources but are occasionally needed on AOA network diagrams to show logical relationships between activities.
Question
 _____ involves the processes required to ensure timely completion of a project.
Question
 After reviewing the project management plan, project charter, enterprise environmental factors, and organizational process assets, the project team uses expert judgment, analytical techniques, and meetings to develop the _____.
Question
 Which technique involves doing activities in parallel that one would normally do in sequence?

A) Critical chain scheduling
B) Crashing
C) Fast tracking
D) PERT analysis
Question
 Which law states that work expands to fill the time allowed?

A) Murphy's Law
B) Miller's Law
C) Parkinson's Law
D) Einstein's Law
Question
 In project schedule management, the process of _____ involves deciding how many people, equipment, and materials a project team should use to perform project activities.
Question
 A(n) _____ is a schematic display of the logical relationships among project activities and?their sequencing.
Question
 In the activity defining process, the project team should review the _____ and activity attributes with project stakeholders before moving on to the next step in project schedule management.
Question
 Which is a similarity between scope control and schedule control?

A) Both are initial processes of project time management.
B) Both of their primary goals is to define project goals and milestones.
C) Both are portions of the integrated change control process under project integration management.
D) Both of these processes should occur before estimating activity durations.
Question
 Which is an output of schedule control?

A) change requests
B) activity attributes
C) resource requirements
D) milestones lists
Question
 In a(n) _____ relationship, the "from" activity must start before the "to" activity can be finished.
Question
 In a network diagram, a(n) _____ is the starting and ending point of an activity.
Question
 Which is a similarity between the crashing and fast tracking?

A) both spread out tasks over a long period of time to ensure the quality of work is maintained
B) both invariably result in increases in total project costs
C) both can shorten the time needed to finish a project
D) both are network diagramming techniques used primarily to predict total project duration
Question
 The _____ is a tabulation of activities to be included on a project schedule.
Question
 How does critical chain scheduling protect tasks on the critical chain from being delayed?

A) critical paths
B) feeding buffers
C) dummy activities
D) fast tracking
Question
 Where would a draft schedule for a project most likely be found?

A) project buffer
B) project charter
C) resource breakdown structure
D) project's dummy activities list
Question
 What is an accurate difference between the Program Evaluation and Review Technique (PERT) and critical path method (CPM)?

A) CPM addresses the risk associated with duration estimates whereas PERT does not.
B) Unlike CPM, PERT estimates only when there is no risk of uncertainty.
C) CPM involves more work than PERT because it requires several duration estimates.
D) PERT uses different duration estimates whereas CPM uses one specific duration estimate.
Question
 Which technique is used for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for the least incremental cost?

A) dependency
B) crashing
C) critical chain scheduling
D) feeding buffers
Question
 The activity list should include the _____, an activity identifier, and a brief description of the activity.
Question
 In a project schedule, the variable that has the least amount of flexibility is _____.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/99
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 6: Project Schedule Management
1
 In project schedule management, the primary output of defining activities is a schedule management plan.
False
Explanation: In project schedule management, the main output of defining activities are an activity list, activity attributes, a milestone list, and project management plan updates.
2
 A merge occurs when one node precedes multiple nodes.
False
Explanation: A merge occurs when two or more nodes precede a single node. On the other hand, bursts occur when two or more activities follow a single node.
3
 In a critical path analysis, the shortest path is what drives the completion date for the project.
False
Explanation: In a critical path analysis, several tasks are done in parallel on projects, and most projects have multiple paths through a network diagram. The longest path or the path that contains the critical tasks is what drives the completion date for the project.
4
 Milestones are easy to achieve and are always achieved through one main activity.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
5
 A disadvantage of using Gantt charts is that they do not provide a standard format for displaying planned project schedule information.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
6
 To define activities, the project team should start with reviewing the schedule management plan, scope baseline, enterprise environmental factors, and organizational processes.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
7
 A schedule management plan includes information which describes the format and frequency of schedule reports required for the project.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
8
 Start-to-finish relationships are the most frequently used dependencies between activities.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
9
 A drawback of the precedence diagramming method is that it cannot be used unless dummy activities are employed.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
10
 An activity is an element of work that has an expected duration, cost, and resource requirements.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
11
 A Tracking Gantt chart is based on the percentage of work completed for project tasks or the actual start and finish dates.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
12
 In project schedule management, the next step after sequencing activities is to define these activities.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
13
 A dependency pertains to the sequencing of project activities or tasks.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
14
 In a Gantt chart, thick black bars represent milestones achieved in a project.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
15
 In a network diagram, it is mandatory for every item on the WBS to be shown instead of only those activities with dependencies.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
16
 After defining project activities, the next step in project schedule management is developing the schedule.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
17
 The arrows in a network diagram represent missed milestones in a project.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
18
 Project schedules grow out of basic documents such as the project charter.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
19
 Network diagrams are the preferred technique for showing activity sequencing.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
20
 It is important for the activity list and activity attributes to be in agreement with the work breakdown structure.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
21
 Which statement best describes the difference between an activity list and an activity attribute?

A) As opposed to an activity attribute, an activity list provides resource requirements and constraints related to activities.
B) An activity list provides a more concrete list of milestones for a project than an activity attribute.
C) An activity attribute is a tabulation of activities to be included on a project schedule whereas an activity list is not.
D) An activity attribute provides more schedule-related information about each activity than an activity list.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
22
 Which document is most likely to include planned project start and end dates which serve as the starting points for a detailed schedule?

A) resource breakdown structure
B) milestones list
C) organizational process assets update
D) project charter
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
23
 In project schedule management, which process involves analyzing activity sequences, activity resource estimates, and activity duration estimates to create the project schedule?

A) planning schedule management
B) developing the schedule
C) controlling the schedule
D) defining activities
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
24
 In project schedule management, which process primarily involves checking and managing changes to the project schedule?

A) estimating activity durations
B) developing the schedule
C) controlling the schedule
D) estimating activity resources
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
25
 Critical chain scheduling assumes that resources multitask and maximizes multitasking.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
26
 Knowing the amount of float allows project managers to know whether a project schedule is flexible.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
27
 In project schedule management, which process involves estimating the number of work periods that are needed to complete individual activities?

A) defining activities
B) sequencing activities
C) planning schedule management
D) estimating activity durations
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
28
 A drawback of the project management software is that it does not have the capacity to calculate the critical path(s) for a project.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
29
 Which process in project schedule management involves identifying the specific tasks that the project team members and stakeholders must perform to produce the project deliverables?

A) defining activities
B) sequencing activities
C) developing the schedule
D) estimating activity durations
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
30
 A backward pass through the network diagram determines the early start and early finish dates for each activity.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
31
 What is the first process involved in project schedule management?

A) defining activities
B) estimating activity durations
C) planning schedule management
D) sequencing activities
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
32
 In project schedule management, which process primarily involve identifying and documenting the relationships between project activities?

A) defining activities
B) sequencing activities
C) planning schedule management
D) estimating activity durations
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
33
 The final process in project schedule management is developing the schedule.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
34
 In project schedule management, which process generates the main outputs of an activity list, activity attributes, and a milestone list?

A) sequencing activities
B) defining activities
C) resource estimating activities
D) estimating activity durations
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
35
 The critical path on a project can change as the project progresses.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
36
 Which term is used for a significant event on a project that normally has no duration?

A) milestone
B) activity attribute
C) activity sequence
D) schedule baseline
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
37
 In project schedule management, which is an output of controlling the schedule?

A) activity duration estimate
B) project management plan update
C) activity attribute
D) milestones list
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
38
 The technique of fast tracking can result in lengthening the project schedule.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
39
 The main disadvantage of crashing is that it lengthens the time needed to finish a project.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
40
 One of PERT's main disadvantages is that it does not address the risk associated with duration estimates.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
41
 Which is one of the main outputs of estimating activity resources process?

A) project documents update
B) milestone list
C) breakdown structure
D) activity duration estimate
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
42
 In project schedule management, what is the next step after defining project activities?

A) planning schedule management
B) determining their dependencies
C) controlling the schedule
D) estimating activity duration
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
43
 During which relationship is the "from" activity unable start until the "to" activity is started?

A) start-to-start
B) finish-to-finish
C) finish-to-start
D) start-to-finish
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
44
 What term is used for the amount of time an activity can be delayed without delaying the early start date of any immediately following activities?

A) forward pass
B) backward pass
C) fast tracking
D) free slack
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
45
 Which dependencies do AOA network diagrams use?

A) start-to-start
B) finish-to-start
C) finish-to-finish
D) start-to-finish
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
46
 In project schedule management, the main goal of which process is to ensure that the project team has complete understanding of all the work they must do as part of the project scope so they can start scheduling the work?

A) defining activities
B) estimating activity durations
C) estimating activity resources
D) controlling the schedule
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
47
 Which technique involves network diagramming and is used primarily to predict total project duration?

A) Gantt chart
B) critical path analysis
C) resource breakdown structure
D) arrow diagramming method
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
48
 Which type of dependencies are inherent in the nature of work being performed on a project?

A) mandatory
B) discretionary
C) external
D) random
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
49
 Which is true of a finish-to-finish dependency?

A) It is a dependency in which the "from" activity cannot start until the "to" activity or successor is started.
B) It is a dependency in which in which the "from" activity must finish before the "to" activity or successor can start.
C) It is a dependency in which the "from" activity must be finished before the "to" activity can be finished.
D) It is a dependency in which the "from" activity must start before the "to" activity can be finished.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
50
 Which network diagramming technique uses boxes to represent activities?

A) PDM
B) CPM
C) ADM
D) PERT
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
51
 What is the latest possible time an activity might begin without delaying the project finish date?

A) early finish date
B) late finish date
C) late start date
D) early start date
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
52
 The critical path is the _____ path through a network diagram, and it represents the _____ amount of slack or float.

A) longest; longest
B) longest; shortest
C) shortest; longest
D) shortest; shortest
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
53
 Which dependencies involve relationships between project and non-project activities?

A) mandatory
B) discretionary
C) external
D) inherent
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
54
 What term is used for the amount of time an activity can be delayed from its early start without delaying the planned project finish date?

A) total slack
B) free float
C) backward pass
D) forward pass
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
55
 Which provide a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a calendar format?

A) Gantt charts
B) Critical path analysis
C) Arrow diagramming method
D) PERT analysis
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
56
 Which is true of dummy activities?

A) They have long durations.
B) They show logical relationships between activities.
C) They have a large range of resources.
D) They have limited time periods.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
57
 In project schedule management, the ultimate goal of which process is to provide a basis for monitoring project progress for the time dimension of the project?

A) defining activities
B) sequencing activities
C) developing a schedule
D) estimating activity resources
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
58
 In an AOA network diagram, what occurs when two or more activities follow a single node?

A) combinations
B) buffers
C) mergers
D) bursts
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
59
 After working with key stakeholders to define activities and calculate their resources, what is the next process in project schedule management?

A) develop the schedule.
B) control the schedule.
C) determine their dependencies.
D) estimate the duration of activities.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
60
 Which dependencies are sometimes referred to as soft logic and should be used with care because they may limit later scheduling options?

A) mandatory
B) discretionary
C) external
D) inherent
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
61
 _____ have no duration and no resources but are occasionally needed on AOA network diagrams to show logical relationships between activities.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
62
 _____ involves the processes required to ensure timely completion of a project.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
63
 After reviewing the project management plan, project charter, enterprise environmental factors, and organizational process assets, the project team uses expert judgment, analytical techniques, and meetings to develop the _____.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
64
 Which technique involves doing activities in parallel that one would normally do in sequence?

A) Critical chain scheduling
B) Crashing
C) Fast tracking
D) PERT analysis
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
65
 Which law states that work expands to fill the time allowed?

A) Murphy's Law
B) Miller's Law
C) Parkinson's Law
D) Einstein's Law
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
66
 In project schedule management, the process of _____ involves deciding how many people, equipment, and materials a project team should use to perform project activities.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
67
 A(n) _____ is a schematic display of the logical relationships among project activities and?their sequencing.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
68
 In the activity defining process, the project team should review the _____ and activity attributes with project stakeholders before moving on to the next step in project schedule management.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
69
 Which is a similarity between scope control and schedule control?

A) Both are initial processes of project time management.
B) Both of their primary goals is to define project goals and milestones.
C) Both are portions of the integrated change control process under project integration management.
D) Both of these processes should occur before estimating activity durations.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
70
 Which is an output of schedule control?

A) change requests
B) activity attributes
C) resource requirements
D) milestones lists
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
71
 In a(n) _____ relationship, the "from" activity must start before the "to" activity can be finished.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
72
 In a network diagram, a(n) _____ is the starting and ending point of an activity.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
73
 Which is a similarity between the crashing and fast tracking?

A) both spread out tasks over a long period of time to ensure the quality of work is maintained
B) both invariably result in increases in total project costs
C) both can shorten the time needed to finish a project
D) both are network diagramming techniques used primarily to predict total project duration
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
74
 The _____ is a tabulation of activities to be included on a project schedule.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
75
 How does critical chain scheduling protect tasks on the critical chain from being delayed?

A) critical paths
B) feeding buffers
C) dummy activities
D) fast tracking
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
76
 Where would a draft schedule for a project most likely be found?

A) project buffer
B) project charter
C) resource breakdown structure
D) project's dummy activities list
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
77
 What is an accurate difference between the Program Evaluation and Review Technique (PERT) and critical path method (CPM)?

A) CPM addresses the risk associated with duration estimates whereas PERT does not.
B) Unlike CPM, PERT estimates only when there is no risk of uncertainty.
C) CPM involves more work than PERT because it requires several duration estimates.
D) PERT uses different duration estimates whereas CPM uses one specific duration estimate.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
78
 Which technique is used for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for the least incremental cost?

A) dependency
B) crashing
C) critical chain scheduling
D) feeding buffers
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
79
 The activity list should include the _____, an activity identifier, and a brief description of the activity.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
80
 In a project schedule, the variable that has the least amount of flexibility is _____.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 99 flashcards in this deck.