Deck 14: Material Requirements Planning Mrpand Erp
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/113
Play
Full screen (f)
Deck 14: Material Requirements Planning Mrpand Erp
1
Reduced inventory levels and faster response to market changes are both benefits of MRP.
True
2
What is MRP? Identify four benefits from its use.
MRP or material requirements planning is a dependent demand technique that uses a bill of material,inventory,expected receipts,and a master production schedule to determine material requirements.The benefits of MRP include (1)better response to customer orders, (2)faster response to market changes, (3)improved utilization of facilities and labor,and (4)reduced inventory levels.
3
MRP is generally practiced on items with dependent demand.
True
4
"Phantom bills" are bills of material for subassemblies that do not exist in reality.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
5
Dependent demand and independent demand items differ in that:
A)for any product,all components are dependent-demand items.
B)the need for independent-demand items is forecast.
C)the need for dependent-demand items is calculated.
D)All of the above are true.
E)None of the above is true.
A)for any product,all components are dependent-demand items.
B)the need for independent-demand items is forecast.
C)the need for dependent-demand items is calculated.
D)All of the above are true.
E)None of the above is true.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
6
By convention,the top level in a product structure is designated level 1.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
7
Planning bills of material are bills of material for "kits" of inexpensive items such as washers,nuts,and bolts.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
8
________ is a dependent demand technique that uses a bill of material,inventory,expected receipts,and a master production schedule to determine material requirements.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
9
Lead times,inventory availability,and purchase orders outstanding are among the five things operations managers must know for effective use of dependent inventory models.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
10
Demand for a given item is said to be dependent if:
A)it originates from the external customer.
B)there is a deep bill of material.
C)the finished products are mostly services (rather than goods).
D)there is a clearly identifiable parent.
E)the item has several children.
A)it originates from the external customer.
B)there is a deep bill of material.
C)the finished products are mostly services (rather than goods).
D)there is a clearly identifiable parent.
E)the item has several children.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following is NOT one of the four key tasks that Wheeled Coach insists are necessary for successful MRP implementation?
A)The material plan must meet both schedule requirements and facility capabilities.
B)The plan must be executed as designed.
C)Inventory investment must be minimized.
D)Excellent record integrity must be maintained.
E)The process must adhere to stringent quality control standards.
A)The material plan must meet both schedule requirements and facility capabilities.
B)The plan must be executed as designed.
C)Inventory investment must be minimized.
D)Excellent record integrity must be maintained.
E)The process must adhere to stringent quality control standards.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
12
Wheeled Coach obtains competitive advantage through MRP in part because of their excellent record integrity and insistence on record accuracy.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
13
The quantity required of a dependent demand item is computed from the demand for the final products in which the item is used.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
14
The time-phased product structure,unlike the bill of material,adds the concept of lead times.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
15
Describe the role of record accuracy in Wheeled Coach's successful use of MRP.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
16
If X consists of one A and one B,and each A consists of one F and two Gs,then A is the "parent" component of G.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
17
A dependent demand item is so called because its demand is dependent on customer preferences.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following is NOT a key benefit of MRP?
A)increased quality
B)better response to customer orders
C)faster response to market changes
D)improved utilization of facilities and labor
E)reduced inventory levels
A)increased quality
B)better response to customer orders
C)faster response to market changes
D)improved utilization of facilities and labor
E)reduced inventory levels
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
19
Wheeled Coach uses ________ as the catalyst for low inventory,high quality,tight schedules,and accurate records.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
20
Which of the following statements regarding Wheeled Coach is FALSE?
A)Wheeled Coach has found competitive advantage through MRP.
B)Wheeled Coach builds ambulances in a repetitive process.
C)Wheeled Coach's MRP system allowed the company to meet tight schedules,but caused inventory to rise.
D)Wheeled Coach's MRP system maintains excellent record integrity.
E)Low inventory and high quality are two positive outcomes of Wheeled Coach's use of MRP.
A)Wheeled Coach has found competitive advantage through MRP.
B)Wheeled Coach builds ambulances in a repetitive process.
C)Wheeled Coach's MRP system allowed the company to meet tight schedules,but caused inventory to rise.
D)Wheeled Coach's MRP system maintains excellent record integrity.
E)Low inventory and high quality are two positive outcomes of Wheeled Coach's use of MRP.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
21
The minimum record accuracy required for successful MRP is approximately which of the following?
A)lower than 90%
B)90%
C)95%
D)97%
E)99%
A)lower than 90%
B)90%
C)95%
D)97%
E)99%
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
22
Consider the following product structure.
If the demand for product A is 50 units,how many units of component E will be needed?
A)4
B)100
C)200
D)250
E)300

A)4
B)100
C)200
D)250
E)300
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
23
Construct a product structure tree for a movie purchased in DVD format.Assume that it contains a single DVD disk.Don't be concerned with artwork-you may use labeled boxes for your parts and assemblies.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
24
Consider the following product structure.Fifty units of Product A are needed.How many units of B,C,D,E,and F are needed? 

Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
25
By convention,what is the top level in a product structure?
A)level 0
B)level 1
C)level T
D)level 10
E)level 100
A)level 0
B)level 1
C)level T
D)level 10
E)level 100
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
26
Consider the following product structure.
If the demand for product A is 50 units,how many units of component E will be needed?
A)50
B)100
C)150
D)200
E)300

A)50
B)100
C)150
D)200
E)300
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
27
A(n)________ is a bill of material for components,usually subassemblies,that exist only temporarily;they are never inventoried.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
28
A manufacturing company is trying to determine the cost of materials used to produce an A.If Fs cost $1 and Ds cost $2 how much does it cost to produce an A (in F and D materials only)? 

Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
29
If the explosion of the bill of material tells MRP how much of each part is needed,how does MRP learn when each of these parts is needed?
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
30
Firms making many different final products use ________ to facilitate production scheduling.
A)planning bills
B)modular bills
C)phantom bills
D)overdue bills
E)gross requirements bills
A)planning bills
B)modular bills
C)phantom bills
D)overdue bills
E)gross requirements bills
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
31
Low-level coding means that:
A)a final item has only a few levels in the BOM structure.
B)the code being used is the code for the lowest level in the BOM structure.
C)a component item is coded at the lowest level at which it appears in the BOM structure.
D)the top level of the BOM is below level zero and that BOMs are not organized around the finished product.
E)the lowest-paid staff member in the production department performs the coding.
A)a final item has only a few levels in the BOM structure.
B)the code being used is the code for the lowest level in the BOM structure.
C)a component item is coded at the lowest level at which it appears in the BOM structure.
D)the top level of the BOM is below level zero and that BOMs are not organized around the finished product.
E)the lowest-paid staff member in the production department performs the coding.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
32
A paint company mixes ten different base colors into 3,000 different color options.If production scheduling is organized around the ten different base colors ,then the bills of material are classified as which of the following?
A)phantom
B)planning
C)modular
D)low-level
E)A and B
A)phantom
B)planning
C)modular
D)low-level
E)A and B
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
33
Consider the following product structure.Forty units of Product A are needed.How many units of B,C,D,E,F,and G are needed? 

Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
34
Which of the following statements best compares modular bills and phantom bills?
A)Both pertain to assemblies that are not inventoried.
B)There is no difference between the two.
C)Both pertain to assemblies that are inventoried.
D)Modular bills are used for assemblies that are not inventoried,unlike phantom bills.
E)Modular bills represent subassemblies that actually exist and are inventoried,while phantom bills represent subassemblies that exist only temporarily and are not inventoried.
A)Both pertain to assemblies that are not inventoried.
B)There is no difference between the two.
C)Both pertain to assemblies that are inventoried.
D)Modular bills are used for assemblies that are not inventoried,unlike phantom bills.
E)Modular bills represent subassemblies that actually exist and are inventoried,while phantom bills represent subassemblies that exist only temporarily and are not inventoried.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
35
A grill assembly takes 20 washers.Instead of listing these washers separately,they are grouped into a single kit for production.How is the bill of material for the washers classified?
A)"pseudo"
B)planning
C)modular
D)low-level
E)A and B
A)"pseudo"
B)planning
C)modular
D)low-level
E)A and B
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
36
Four A washers,five B washers,two C bolts,and a D bolt are required to make one grill parts kit.If 100 grill parts kits are needed,how many more washers will be consumed than bolts?
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
37
What information is necessary for an operations manager to make effective use of a dependent inventory demand model?
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
38
Effective use of MRP and other dependent demand models does not require which of the following?
A)master production schedule
B)bill of materials
C)inventory availability
D)lead times
E)cost of individual components
A)master production schedule
B)bill of materials
C)inventory availability
D)lead times
E)cost of individual components
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
39
Consider the following product structure.Fifty units of Product A are needed.How many units of B,C,D,and E are needed? 

Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
40
Bills of material organized by major subassemblies or by product options are called ________.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
41
An order for 110 units of Product M has been placed.There are currently 30 units of Product M on hand.Each M requires 4 units of Component N.There are 20 units of N on hand.What are the net requirements for N?
A)150
B)170
C)300
D)320
E)440
A)150
B)170
C)300
D)320
E)440
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
42
If 100 units of Q are needed and 10 are already in stock,then the gross requirement is 100 and the net requirement is 90.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
43
When safety stock is deemed absolutely necessary,the usual policy is to build it into (increase)the inventory requirement of the MRP logic.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
44
An order for 120 units of Product M has been made.There are currently 30 units of Product M on hand.Each M requires 4 units of Component N.There are 20 units of N on hand.
(a)Calculate the net requirements for M.
(b)Calculate the gross requirements for N.
(c)Calculate the net requirements for N.
(a)Calculate the net requirements for M.
(b)Calculate the gross requirements for N.
(c)Calculate the net requirements for N.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
45
(a)Consider the product structure shown below.Assuming 1 A is to be made,how many units of each of the other items would need to be made?
(b)If there are 20 of every item except A in on-hand inventory,how many As can be assembled?
(b)If there are 20 of every item except A in on-hand inventory,how many As can be assembled?

Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
46
It is week 1 and there are currently 20 As in stock.We need 300 As at the start of week 5.If there are scheduled receipts planned for week 3 and week 4 of 120 As each and A has a lead time of 1 week,when and how large of an order should be placed to meet the requirement of 300 As?
A)Week 1,300 As
B)Week 1,40 As
C)Week 5,40 As
D)Week 4,40 As
E)Week 4,300 As
A)Week 1,300 As
B)Week 1,40 As
C)Week 5,40 As
D)Week 4,40 As
E)Week 4,300 As
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
47
________ are the result of adjusting gross requirements for inventory on hand and scheduled receipts.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
48
Which of the following best describes a gross material requirements plan?
A)a schedule that shows total demand for an item,and when it must be ordered from a supplier or when production must be started
B)an intermediate range plan for the scheduling of families of products
C)a chart illustrating whether capacity has been exceeded
D)a table that corrects scheduled quantities for inventory on hand
E)a schedule showing which products are to be manufactured and in what quantities
A)a schedule that shows total demand for an item,and when it must be ordered from a supplier or when production must be started
B)an intermediate range plan for the scheduling of families of products
C)a chart illustrating whether capacity has been exceeded
D)a table that corrects scheduled quantities for inventory on hand
E)a schedule showing which products are to be manufactured and in what quantities
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
49
A material requirements plan contains information with regard to all of the following EXCEPT:
A)quantities and required delivery dates of all subassemblies.
B)quantities and required delivery dates of final products.
C)the capacity needed to provide the projected output rate.
D)inventory on hand for each final product.
E)inventory on hand for each subassembly.
A)quantities and required delivery dates of all subassemblies.
B)quantities and required delivery dates of final products.
C)the capacity needed to provide the projected output rate.
D)inventory on hand for each final product.
E)inventory on hand for each subassembly.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
50
An order for 110 units of Product A has been placed.There are currently 60 units of Product A on hand.Each A requires 4 units of Part B.There are 20 units of B available.What are the net requirements for B?
A)20
B)120
C)180
D)240
E)440
A)20
B)120
C)180
D)240
E)440
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
51
Explain the difference between a gross requirements plan and a net requirements plan.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
52
An order for 50 units of Product A and 60 of B has been placed.There are currently 25 units of Product B on hand.Each A requires 2 units of Part C;each B requires 5 units of C.There are 160 units of C available.What are the net requirements for C?
A)115
B)175
C)240
D)690
E)700
A)115
B)175
C)240
D)690
E)700
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
53
In MRP,the number of units projected to be available at the beginning of each time period refers to:
A)net requirements.
B)scheduled receipts.
C)planned order releases.
D)projected on hand.
E)the amount necessary to cover a shortage.
A)net requirements.
B)scheduled receipts.
C)planned order releases.
D)projected on hand.
E)the amount necessary to cover a shortage.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
54
An order has been placed for 50 units of Product A and 60 units of Product B.There are currently 35 units of Product B on hand.Each A requires 2 units of Part C;each B requires 5 units of C.There are 160 units of C available.
(a)Calculate the net requirements for B.
(b)Calculate the gross requirements for C.
(c)Calculate the net requirements for C.
(a)Calculate the net requirements for B.
(b)Calculate the gross requirements for C.
(c)Calculate the net requirements for C.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
55
Which of the following statements regarding the gross material requirements plan is TRUE?
A)It shows total demand for an item.
B)It shows when an item must be ordered from a supplier or when production must be started.
C)It combines a master production schedule with the time-phased schedule.
D)It requires several inputs,including an accurate bill of material.
E)All of the above are true.
A)It shows total demand for an item.
B)It shows when an item must be ordered from a supplier or when production must be started.
C)It combines a master production schedule with the time-phased schedule.
D)It requires several inputs,including an accurate bill of material.
E)All of the above are true.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
56
Distortion in MRP systems can be minimized when safety stock is held at the:
A)purchased component or raw material level.
B)work-in-process level.
C)finished goods level.
D)A and B
E)A and C
A)purchased component or raw material level.
B)work-in-process level.
C)finished goods level.
D)A and B
E)A and C
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
57
Gross material requirements do not take into account the amount of inventory on hand.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
58
An order for 110 units of Product A has been made.There are currently 60 units of Product A on hand.Each A requires 2 units of Part B.There are 30 units of B available.
(a)Calculate the net requirements for A.
(b)Calculate the gross requirements for B.
(c)Calculate the net requirements for B.
(a)Calculate the net requirements for A.
(b)Calculate the gross requirements for B.
(c)Calculate the net requirements for B.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
59
Consider the following product structure.
If the demand for product A is 30 units,and there are 10 units of B on hand and none of C,how many units of part D will be needed?
A)3
B)40
C)70
D)90
E)110

A)3
B)40
C)70
D)90
E)110
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
60
If safety stock is desired,it should be built into which portion of MRP?
A)any
B)none
C)raw materials
D)finished goods
E)either C or D
A)any
B)none
C)raw materials
D)finished goods
E)either C or D
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
61
In MRP,system nervousness is caused by:
A)management's attempt to continually respond to minor changes in production requirements.
B)the use of the lot-for-lot approach.
C)management's marking part of the master production schedule as "not to be rescheduled".
D)the use of phantom bills of material.
E)management's attempt to evaluate alternative plans before making a decision.
A)management's attempt to continually respond to minor changes in production requirements.
B)the use of the lot-for-lot approach.
C)management's marking part of the master production schedule as "not to be rescheduled".
D)the use of phantom bills of material.
E)management's attempt to evaluate alternative plans before making a decision.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
62
Which of the following statements regarding lot-sizing is TRUE?
A)EOQ principles should be followed whenever economical.
B)Too much concern with lot-sizing results in false accuracy.
C)Lot-for-lot cannot be modified for scrap allowance or process constraints.
D)The Wagner-Whitin algorithm simplifies lot size calculations.
E)All of the above are true.
A)EOQ principles should be followed whenever economical.
B)Too much concern with lot-sizing results in false accuracy.
C)Lot-for-lot cannot be modified for scrap allowance or process constraints.
D)The Wagner-Whitin algorithm simplifies lot size calculations.
E)All of the above are true.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
63
MRP is an excellent tool for scheduling components with variable lead times.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
64
A working MRP system allows a firm to react to even minor changes in production requirements.Discuss both the advantage and disadvantage of having such ability.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
65
What lot-sizing technique is generally preferred when inventory holding costs are extremely high?
A)lot-for-lot
B)EOQ
C)POQ
D)the Wagner-Whitin algorithm
E)All of the above are appropriate for the situation.
A)lot-for-lot
B)EOQ
C)POQ
D)the Wagner-Whitin algorithm
E)All of the above are appropriate for the situation.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
66
For the lot-sizing technique known as lot-for-lot to be appropriate:
A)future demand should be known for several weeks.
B)setup cost should be relatively small.
C)annual volume should be rather low.
D)item unit cost should be relatively small.
E)the independent demand rate should be very stable.
A)future demand should be known for several weeks.
B)setup cost should be relatively small.
C)annual volume should be rather low.
D)item unit cost should be relatively small.
E)the independent demand rate should be very stable.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
67
What is the process of tracing upward in the bill of material from the component to the parent item in order to determine the cause for the component requirement?
A)net requirements planning
B)time fencing
C)pegging
D)backtracking
E)leveling
A)net requirements planning
B)time fencing
C)pegging
D)backtracking
E)leveling
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
68
Which of the following lot-sizing techniques results in the lowest holding costs?
A)lot-for-lot
B)EOQ
C)POQ
D)Wagner-Whitin algorithm
E)the quantity discount model
A)lot-for-lot
B)EOQ
C)POQ
D)Wagner-Whitin algorithm
E)the quantity discount model
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
69
________ are the time units in a material requirements planning (MRP)system.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
70
________ are a way of allowing a segment of the master schedule to be designated as "not to be rescheduled."
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
71
Time fences divide that segment of the master schedule that can be revised from that section that is "not to be rescheduled."
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
72
Explain what is meant by "nervousness" of the MRP schedule.Provide an example.Name two tools that are particularly useful in reducing system nervousness in MRP systems.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
73
The lot-for-lot lot-sizing technique is particularly appropriate when demand is not very smooth and set up cost is small compared to holding cost.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
74
MRP can be effective only if very accurate lot sizes are calculated in advance.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
75
In general,the lot-for-lot approach should be used whenever economical.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
76
What is one of the tools that is particularly useful in reducing system nervousness in an MRP system?
A)modular bills
B)time phasing
C)time fences
D)lot sizing
E)closed loop system
A)modular bills
B)time phasing
C)time fences
D)lot sizing
E)closed loop system
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
77
Product A is made from 2 Bs and 1 C.Lead times for A,B,and C are 2,3,and 2 weeks respectively.Currently there are 2 Bs and a 5 Cs on hand,with 5 of each scheduled to arrive at the end of week 1.If 20 As are needed during week 4,can the order be completed (it is the start of week 0 currently)?
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
78
What are time fences? Why are they used?
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
79
Which of the following statements is TRUE about the MRP plan when using lot-for-lot ordering?
A)The quantity of gross requirements for a child item is always equal to the quantity of planned order releases for its parent.
B)The quantity of gross requirements for a child item is equal to the quantity of planned order release(s)multiplied by the number of child items used in the parent assembly.
C)The quantity of gross requirements for a child item is always equal to the quantity of gross requirements for its parent.
D)The quantity and gross requirements for a child item is always equal to the quantity of net requirements for its parent.
E)All of the above are true.
A)The quantity of gross requirements for a child item is always equal to the quantity of planned order releases for its parent.
B)The quantity of gross requirements for a child item is equal to the quantity of planned order release(s)multiplied by the number of child items used in the parent assembly.
C)The quantity of gross requirements for a child item is always equal to the quantity of gross requirements for its parent.
D)The quantity and gross requirements for a child item is always equal to the quantity of net requirements for its parent.
E)All of the above are true.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck
80
In MRP,a "bucket" refers to a fixed order quantity,such as an EOQ.
Unlock Deck
Unlock for access to all 113 flashcards in this deck.
Unlock Deck
k this deck