Multiple Choice
This level of OPM3 maturity is characterized by standardization of the entire project life cycle and by artifacts, metrics, and an adequate number of trained resources assigned.
A) Standardize
B) Measure
C) Control
D) Optimize
Correct Answer:

Verified
Correct Answer:
Verified