Multiple Choice
Failure to integrate the new system with the old system is an example of ________.
A) A poor break even analysis
B) Failure to create an adequate project scope statement
C) Failure to recognize tangible benefits
D) Failure to assess and manage risks
Correct Answer:

Verified
Correct Answer:
Verified