Multiple Choice
A bank is designing a new branch office and needs to determine how much driveway space to allow for cars waiting for drive up teller service.The drive up service will have three tellers and a single waiting line.At another branch of the bank in a similar setting,the average service time for drive up tellers is 4 minutes per customer and average arrival rate is 36 customers per hour.It is expected that the new bank will have similar characteristics. What is the average time that a customer would have to wait in line before being served?
A) 4.3 minutes
B) 8.3 minutes
C) 2.7 minutes
D) 6.7 minutes
E) 8.3 minutes.
Correct Answer:

Verified
Correct Answer:
Verified
Q53: A bank is designing a new branch
Q54: The basic multiple-server-with-priority queuing model assumes that:<br>A)arrival
Q55: Which of the following is not generally
Q56: The following questions refer to this data
Q57: A bank is designing a new branch
Q59: Which of the following is not an
Q60: In an infinite source model,the average time
Q61: The following questions refer to this data
Q62: In a single server,exponential service durations,and finite
Q63: A queuing system has four work stations