Multiple Choice
A bank is designing a new branch office and needs to determine how much driveway space to allow for cars waiting for drive up teller service.The drive up service will have three tellers and a single waiting line.At another branch of the bank in a similar setting,the average service time for drive up tellers is 4 minutes per customer and average arrival rate is 36 customers per hour.It is expected that the new bank will have similar characteristics. For how many tellers should the system be designed if the managers want the average time a customer spends in the system to be no more than 5 minutes?
A) at least 3
B) at least 4
C) at least 5
D) at least 6
E) It is impossible to say without more information.
Correct Answer:

Verified
Correct Answer:
Verified
Q69: The cost of having customers wait has
Q70: If wait times are too long managers
Q71: Why is there waiting in a queue
Q72: A bank of ten machines requires regular
Q73: A single server queuing system has an
Q74: For a server that already has a
Q76: All of the following are characteristics of
Q77: The multiple server queuing table cannot be
Q78: As the ratio of arrival rate to
Q79: The following questions refer to this data