The operations manager of a body and paint shop has five cars to schedule for repair.He would like to minimize the make-span to complete all work on these cars.Each car requires body work prior to painting.The estimates of the times required to do the work at each of the two stations are as follows: What is the idle time at the paint work centre for the optimal schedule?
A) 1 hour
B) 2 hours
C) 4 hours
D) 7 hours
E) 10 hours
Correct Answer:

Verified
Correct Answer:
Verified
Q65: Priority rules generally assume that a job's
Q66: Determine the minimum number of workers needed,and
Q67: In job scheduling,most loading of work centres
Q68: The Theory of Constraints focuses on developing
Q69: Job scheduling pertains to:<br>A)hiring workers.<br>B)capacity planning.<br>C)buying machinery.<br>D)timing
Q71: Given the following data for jobs awaiting
Q72: Backward scheduling is based on working back
Q73: The table below contains information about five
Q74: Jack,the owner of Jack's Electronic Repair,currently has
Q75: Loading refers to the assignment of jobs