True/False
A major difference between kanban and MRP in scheduling the products to be built is that kanban is primarily a manual system.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q71: Which of the following are potentially negative
Q72: A set of tools and methods for
Q73: The control of the flow of work
Q74: Which of the following is not a
Q75: The ultimate goal of a lean system
Q77: JIT was developed at the Ford Motor
Q78: JIT philosophy tries to eliminate work-in-process inventory
Q79: Which of the following does not contribute
Q80: A visual tool consisting of process flow
Q81: JIT refers to a production system in