Multiple Choice
When a process is judged out of control for an important character?istic,what corrective action should be taken?
A) The process should be stopped and corrective action must be taken.
B) The process should be investigated for Type I error.
C) The process should be investigated for Type II error.
D) The process should continue,however,100% inspection is required.
E) The process should continue until another sample is taken.
Correct Answer:

Verified
Correct Answer:
Verified
Q20: Sample range control charts are used to
Q21: The probability of a Type I error
Q22: A Quality Analyst wants to construct a
Q23: Given the following process control data for
Q24: When a process is not centred,its capability
Q26: A design engineer wants to construct a
Q27: The Chair of the Operations Management Department
Q28: A sample statistic that falls outside the
Q29: There is no direct link between design
Q30: This involves performing experiments by changing levels