Multiple Choice
A design engineer wants to construct a sample mean chart for controlling the service life of one of the types of light bulbs his company produces.He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours.On three recent production batches,he tested service life on random samples of four bulbs,with these results: What value should be used as the mean of the sampling distribution of sample means?
A) 470 hours
B) 495 hours
C) 500 hours
D) 515 hours
E) 525 hours
Correct Answer:

Verified
Correct Answer:
Verified
Q99: Control limits are specifications established by engineering
Q100: A Quality Analyst wants to construct a
Q101: Concluding that a process has changed when
Q102: Given the following process control data for
Q103: The probability of concluding that an assignable
Q105: A Quality Analyst wants to construct a
Q106: As a rule of thumb,operations with a
Q107: A point which is outside of the
Q108: What should managers have in place if
Q109: Given the following process control data for