Multiple Choice
A Methods and Measurements Analyst needs to develop a time standard for a certain task.In a preliminary study,he observed one of his employees perform this task five times,with the following results: What is the standard time (ST) for this task if the employee worked at a twenty-five percent faster pace than the average and an allowance of twenty percent of the workday is used?
A) 80 seconds
B) 96 seconds
C) 100 seconds
D) 120 seconds
E) 125 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q30: In a stopwatch time study, adjusting the
Q54: Which of the following is not related
Q56: A Methods and Measurements Analyst for Digital
Q57: Given the following work sampling data,based upon
Q59: Time-based pay compensates employees according to the
Q60: Many organizations have begun to realize that
Q61: 11eab92b_c497_db25_99e6_e51aa0167b03 If the person observed worked at
Q62: Job enrichment involves giving a worker a
Q91: A worker-machine chart can be used to
Q141: Work sampling provides a detailed elemental breakdown