A Methods and Measurements Analyst for Timepiece,Inc.needs to develop a time standard for the task of attaching a watch to a wristband.In a preliminary study,he observed one of his employees perform this task five times,with the following results: What is the standard time (ST) for this task if the employee worked at a twenty percent faster pace than is average,and an allowance of twenty percent of job time is used?
A) 4.5 seconds
B) 5 seconds
C) 20 seconds
D) 28.8 seconds
E) 100 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q64: A Methods and Measurements Analyst for Timepiece,Inc.needs
Q65: In a stopwatch time study,which of the
Q66: The owner of Kat Motel wants to
Q67: The behavioural approach to job design which
Q69: Work measurement concentrates on how long it
Q70: A work sampling study of kitchen help
Q71: The methods analysis chart which describes the
Q72: More strenuous work typically leads to a
Q73: The methods analysis chart which describes the
Q91: A worker-machine chart can be used to