Multiple Choice
A Methods and Measurements Analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse.In a preliminary study,she observed one of her employees perform this task six times with the following results: What is the observed time (OT) for this task?
A) 34 seconds
B) 40 seconds
C) 46 seconds
D) 48 seconds
E) 240 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q30: In a stopwatch time study, adjusting the
Q43: A Methods and Measurements Analyst for Timepiece,Inc.needs
Q44: Which of the following is not one
Q45: Methods analysis cannot be done for jobs
Q46: For purposes of obtaining good time standards
Q50: Which of the following most closely describes
Q51: Tables of predetermined time standards make work
Q52: In a stopwatch time study, the average
Q52: Specialization is a primary point of disagreement
Q123: Potential benefits of self-directed teams include higher