Essay
A work cell is required to make 140 computerized diagnostic assemblies (for installation into hybrid automobiles) each day. The cell currently works an eight hour shift, of which seven hours is available for productive work. These assemblies require five operations. Standard times for these operations are: Operation A, 3.0 minutes, B, 1.8 minutes, C, 2.4 minutes, D, 2.5 minutes, and E, 1.4 minutes. What is takt time for this cell? How many workers will be needed to achieve this schedule? Use the grid below to construct a work balance chart for this cell.
Correct Answer:

Verified
Takt time = 420 / 140 = 3 minutes/unit. ...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q6: Job lots are groups or batches of
Q34: The central problem in product-oriented layout planning
Q42: _ is that element of balancing a
Q54: Balancing low-cost storage with low-cost material handling
Q66: To develop a good facility layout, what
Q68: Which type of layout is specifically designed
Q93: The dominant problem associated with the fixed-position
Q110: Which of the following is not a
Q124: ASRS stands for<br>A) automated storage and retrieval
Q159: In the Office Relationship Chart, which rating