Multiple Choice
Manufacturing cycle time is best defined as the:
A) length of the work shift,expressed in minutes per day.
B) time it takes a unit to move from one workstation to the next.
C) time between the start of one unit and the start of the next unit.
D) sum of all the task times to make one unit of a product.
E) time from raw materials receipt to finished product exit.
Correct Answer:

Verified
Correct Answer:
Verified
Q13: Which one of the following is a
Q15: When suppliers are encouraged to locate near
Q20: Which of the following is specifically characterized
Q29: Weekly usage of a product is 8
Q55: _ is the minimum inventory necessary to
Q62: Which of the following is not characteristic
Q64: Increasing inventory exposes variability in production processes.
Q66: The number of kanbans should be equal
Q69: Which of the following is not a
Q117: Many suppliers feel that having a variety