A crew of mechanics at the Highway Department Garage repair vehicles that break down at an average of λ = 8 vehicles per day (approximately Poisson in nature). The mechanic crew can service an average of μ = 11 vehicles per day with a repair time distribution that approximates an exponential distribution. The crew cost is approximately $300 per day. The cost associated with lost productivity from the breakdown is estimated at $150 per vehicle per day (or any fraction thereof). Which is cheaper, the existing system with one service crew, or a revised system with two service crews?
Correct Answer:

Verified
Ls for the single server is 8 / (11 - 8) ...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q48: In the finite population waiting line model,
Q49: Which one of the following is NOT
Q50: Suppose that 2 customers arrive on average
Q51: A waiting line, or queuing, system has
Q52: Arrivals or inputs to a waiting-line system
Q54: A single-phase waiting-line system meets the assumptions
Q55: A waiting line model meeting the assumptions
Q56: The _ probability distribution is a continuous
Q57: A crew of mechanics at the Highway
Q58: A finite population waiting line model is