Multiple Choice
As a supervisor of a production department, you must decide the daily production totals of a certain product that has two models, the Deluxe and the Special.The profit on the Deluxe model is $12 per unit and the Special's profit is $10.Each model goes through two phases in the production process, and there are only 100 hours available daily at the construction stage and only 80 hours available at the finishing and inspection stage.Each Deluxe model requires 20 minutes of construction time and 10 minutes of finishing and inspection time.Each Special model requires 15 minutes of construction time and 15 minutes of finishing and inspection time.The company has also decided that the Special model must comprise at least 40 percent of the production total.The optimal product mix should include
A) 120D's.
B) 120S's.
C) 200D's.
D) 200S's.
Correct Answer:

Verified
Correct Answer:
Verified
Q73: What is the most you would
Q74: The rationality assumption implies that solutions need
Q75: Which of the following is a basic
Q76: Consider the sensitivity report above.<br>(a)Which constraints are
Q77: You don't use any of the<br>A)pecans.<br>B)rum.<br>C)cane syrup.<br>D)vanilla.
Q79: The term slack is associated with ≥
Q80: Consider the following constraints from a two-variable
Q81: Suppose a linear programming (minimization)problem has been
Q82: As a supervisor of a production department,
Q83: The shadow price is the same as