Multiple Choice
A goal programming problem had two goals (with no priorities assigned) .Goal number 1 was to achieve a cost of $2,400 and goal number 2 was to have no idle time for workers in the factory.The optimal solution to this problem resulted in a cost of $2,400 and no idle time.What was the value for the objective function for this goal programming problem?
A) 2300
B) 100
C) -100
D) 0
Correct Answer:

Verified
Correct Answer:
Verified
Q59: The three types of integer programs are:
Q60: The global optimum point may be superior
Q61: Another name for a 0-1 variable is
Q62: Assignment problems solved previously by linear programming
Q63: The concept of a local optimum is
Q65: What is the optimal solution to the
Q66: We do not have a general method
Q67: The overall best solution in a nonlinear
Q68: An integer programming solution can never produce
Q69: Data Equipment Inc.produces two models of a