Short Answer
A bakery produces muffins and doughnuts.Let x1 be the number of doughnuts produced and x2 be the number of muffins produced.The profit function for the bakery is expressed by the following equation: profit = 4x1 + 2x2 + 0.3x12 + 0.4x22.The bakery has the capacity to produce 800 units of muffins and doughnuts combined and it takes 30 minutes to produce 100 muffins and 20 minutes to produce 100 doughnuts.There is a total of 4 hours available for baking time.There must be at least 200 units of muffins and at least 200 units of doughnuts produced.How many doughnuts and muffins should the bakery produce in order to maximize profit?
Correct Answer:

Verified
Correct Answer:
Verified
Q76: Allied Manufacturing has three factories located in
Q77: Quadratic programming contains squared terms in the
Q78: Which of the following statements is false
Q79: A quadratic programming problem involves which of
Q80: A goal programming problem had two goals
Q81: Consider the following 0-1 integer programming problem:
Q82: An integer programming (maximization)problem was first solved
Q83: The constraint X<sub>1</sub> - X<sub>2</sub> = 0
Q84: An integer programming (minimization)problem was first solved
Q86: Terms that are minimized in goal programming