Multiple Choice
Table 8-2
A small furniture manufacturer produces tables and chairs. Each product must go through three stages of the manufacturing process: assembly, finishing, and inspection. Each table requires 4 hours of assembly, 3 hours of finishing, and 1 hour of inspection. Each chair requires 3 hours of assembly, 2 hours of finishing, and 2 hours of inspection. The selling price per table is $140 while the selling price per chair is $90. Currently, each week there are 220 hours of assembly time available, 160 hours of finishing time, and 45 hours of inspection time. Assume that one hour of assembly time costs $5.00; one hour of finishing time costs $6.00; one hour of inspection time costs $4.50; and that whatever labor hours are not required for the table and chairs can be applied to another product. Linear programming is to be used to develop a production schedule. Define the variables as follows:
-According to Table 8-2, which describes a production problem, suppose it was decided that all the labor hour costs have to be covered through the sale of the tables and chairs, regardless of whether or not all the labor hours are actually used. How would the objective function be written?
A) Maximize 140T + 90C
B) Minimize 140T + 90C
C) Maximize 97.5T + 54C
D) Maximize T + C
E) Maximize 140T + 90C - 1100(T+C) - 960(T+C) - 202.5(T+C)
Correct Answer:

Verified
Correct Answer:
Verified
Q9: Determining the mixture of ingredients for a
Q22: Table 8-4<br>The following is a linear programming
Q24: A mail order firm, AmazingCo, can use
Q25: The following table provides shipping costs from
Q32: A computer start-up named Pear is considering
Q40: Describe the production scheduling linear programming application.
Q47: Linear programming is usually used by managers
Q72: The linear programming truck loading model always
Q77: The linear programming model of the production
Q80: Dr.Malcomb Heizer wishes to invest his retirement