Multiple Choice
Table 8-1
A small furniture manufacturer produces tables and chairs.Each product must go through three stages of the manufacturing process: assembly,finishing,and inspection.Each table requires 3 hours of assembly,2 hours of finishing,and 1 hour of inspection.Each chair requires 2 hours of assembly,2 hours of finishing,and 1 hour of inspection.The profit per table is $120 while the profit per chair is $80.Currently,each week there are 200 hours of assembly time available,180 hours of finishing time,and 40 hours of inspection time.Linear programming is to be used to develop a production schedule.Define the variables as follows:
T = number of tables produced each week
C = number of chairs produced each week
-According to Table 8-1,which describes a production problem,suppose it is decided that there must be 4 chairs produced for every table.How would this constraint be written?
A) T ≥ C
B) T ≤ C
C) 4T = C
D) T = 4C
Correct Answer:

Verified
Correct Answer:
Verified
Q8: Three types of gasoline are manufactured by
Q31: What is another name for blending problems?<br>A)diet
Q32: The shipping problem in LP is also
Q34: Which of the following is considered a
Q35: Table 8-5<br>Each coffee table produced by Timothy
Q37: Green Grass,Inc.just ran out of stock and
Q38: Table 8-2<br>Diamond Jeweler's is trying to determine
Q39: When formulating transportation LP problems,constraints usually deal
Q40: A mail order firm,AmazingCo,can use one of
Q41: A cruise line is planning its menu