Multiple Choice
If the internal rate of return project evaluation method is utilized an individual project would be accepted if it had:
A) an IRR greater than the discount rate.
B) a positive IRR.
C) an IRR that was less than the discount rate.
D) an IRR equal to zero.
E) a negative IRR.
Correct Answer:

Verified
Correct Answer:
Verified