Multiple Choice
A DRP system is usually coupled with a _______ system in an attempt to manage the flow and timing of both inbound materials and outbound finished goods.
A) Kan Ban
B) VMI/ Consignment
C) MRP
D) JIT
Correct Answer:

Verified
Correct Answer:
Verified