Multiple Choice
For each component in the Work Breakdown Structure (WBS) ,the WBS dictionary includes:
A) the name of the originator
B) a list of concurrent activities from related work packages
C) the physical location where the work will be performed
D) none of these
Correct Answer:

Verified
Correct Answer:
Verified