Multiple Choice
For constructing a p-chart,it is recommended that ________.
A) a minimum of 100 samples be taken,each with a minimum sample size of 25
B) a minimum of 10 samples be taken,each with a minimum sample size of 30
C) a minimum of 1776 samples be taken,each with a minimum sample size of 74
D) a minimum of 25 samples be taken,each with a minimum sample size of 100
Correct Answer:

Verified
Correct Answer:
Verified