Solved

Quality Control Is Performed on a Cartridge-Based Blood Gas Analyzer,and

Question 7

Multiple Choice

Quality control is performed on a cartridge-based blood gas analyzer,and the following control chart is recorded for the pH: Quality control is performed on a cartridge-based blood gas analyzer,and the following control chart is recorded for the pH:   What action should the pulmonary function technologist take,based on these results? A)  Begin analyzing blood gases because the instrument is in control. B)  Run one additional Level 2 control to determine instrument status. C)  Take the instrument out of service because it is out of control. D)  Re-membrane the pH electrode and rerun Level 2. What action should the pulmonary function technologist take,based on these results?


A) Begin analyzing blood gases because the instrument is in control.
B) Run one additional Level 2 control to determine instrument status.
C) Take the instrument out of service because it is out of control.
D) Re-membrane the pH electrode and rerun Level 2.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions