Multiple Choice
All pieces of a project must be developed and assembled to produce the final product functionality.Designing,making,and assembling these components is the role of:
A) configuration management.
B) baseline scope control.
C) systematic management.
D) baseline configuration.
Correct Answer:

Verified
Correct Answer:
Verified