Multiple Choice
Editing a PLC program normally refers to:
A) replacement of an existing program.
B) monitoring of an existing program.
C) making changes to an existing program.
D) all of these.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q52: Leakage current can falsely activate a PLC
Q53: In Allen-Bradley controllers, RSLinx software is needed
Q54: I/O leakage problems usually occur with devices
Q55: Which of the following would not normally
Q56: To make sure that equipment does not
Q58: Program addressing conflicts can be caused by:<br>A)using
Q59: The first step in troubleshooting is to:<br>A)identify
Q60: A driver is a computer program that
Q61: Most solid-state switches will conduct a small
Q62: The PLC will only accept multiple programs.