Multiple Choice
There are 8 types of lean waste.Which of following is not a clear example of motion waste?
A) The location of the office fax machine is across the hall. Every time you are expecting a fax, you need to pass several offices to get it.
B) The process of connecting to the school website takes 8 steps compared to the normal 3 steps.
C) The TV remote is kept on top of the TV and not near the TV viewing couch
D) The office staple is never kept at the same location twice.
Correct Answer:

Verified
Correct Answer:
Verified