Multiple Choice
In applying MRP concepts and logic to the remanufacturing environment, which are the following concepts need to be considered for alteration?
1) Size of the time buckets
2) Sales promotion techniques
3) Bill of Materials (BOM)
4) Safety stock location
A) (3) and (4)
B) (2)
C) (1) and (4)
D) (1) , (3) , and (4)
Correct Answer:

Verified
Correct Answer:
Verified