Multiple Choice
A basic concept of variable costing is that period costs should be currently expensed.What is the rationale behind this procedure?
A) Period costs are uncontrollable and should not be charged to a specific product.
B) Period costs are generally immaterial in amount and the cost of assigning the amounts to specific products would outweigh the benefits.
C) Allocation of period costs is arbitrary at best and could lead to erroneous decision by management.
D) Because period costs will occur whether production occurs,it is improper to allocate these costs to production and defer a current cost of doing business.
Correct Answer:

Verified
Correct Answer:
Verified
Q24: In a(n)_ cost system,factory overhead is assigned
Q25: Another name for variable costing is<br>A)full costing.<br>B)direct
Q26: A functional classification of costs would classify
Q27: When variable costing is used,<br>A)all product costs
Q28: Landon Corporation wishes to develop a single
Q30: Which of the following is not a
Q31: Applied overhead consists of which of the
Q32: The Internal Revenue Service allows the use
Q33: How do differences in sales and production
Q34: Discuss underapplied and overapplied overhead and its