Multiple Choice
Which of the following statistics from studies on failed projects is not true?
A) Only 32 percent of all technology investments were completed on time,on budget,and with all features and functions originally specified.
B) Large software projects on average run 66 percent over budget and 33 percent over schedule.
C) Between 30 and 40 percent of all software projects are "runaway" projects that far exceed the original schedule and budget projections and fail to perform as originally specified.
D) Thirty-two percent of technology investments are completed on time,within budget,and with requirements met.
E) The average cost overrun of IT projects is 20 percent.
Correct Answer:

Verified
Correct Answer:
Verified
Q62: An example of using an internal integration
Q63: The project risk will rise if the
Q64: At the top of the management structure
Q66: What is the purpose of using a
Q68: To best evaluate,from a financial standpoint,an IT
Q69: Which of the following tools is not
Q70: External integration tools<br>A)enable a project to have
Q71: Which of the following types of projects
Q72: The central method used in a portfolio
Q99: A Gantt chart graphically depicts project tasks