Multiple Choice
Which of the following improper operation is least likely to extend start-up time and increase start-up cost?
A) Tower not vented
B) No cooling liquid on condenser
C) Opening a bleed valve on a positive pressure column
D) Introduction of steam to reboiler during startup
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q1: What is one component of the distillate
Q3: What must the packing support used in
Q4: In what type of distillation operation are
Q5: What section of the distillation column is
Q6: How could distillation be used in the
Q7: What component of distillation systems are used
Q8: What type of tray design is designed
Q9: What is the material used in a
Q10: What is the distillation component where the
Q11: Which method of distillation occurs when some