Essay
A crew of mechanics at the Highway Department garage repair vehicles that break down at an average of λ = 8 vehicles per day (approximately Poisson in nature). The mechanic crew can service an average of μ= 11 vehicles per day with a repair time distribution that approximates an exponential distribution. The crew cost is approximately $300 per day. The cost associated with lost productivity from the breakdown is estimated at $150 per vehicle per day (or any fraction thereof). Which is cheaper, the existing system with one service crew, or a revised system with two service crews?
Correct Answer:

Verified
Ls for the single server is 8 / (11-8) =...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q18: A copy center has five machines that
Q19: A crew of mechanics at the Highway
Q20: Four of the most widely used waiting
Q21: A waiting-line system that meets the assumptions
Q24: A crew of mechanics at the Highway
Q25: Which one of the following is <b>not</b>
Q28: A single-phase waiting-line system meets the assumptions
Q44: Which of the following is most likely
Q51: At the order fulfillment center of a
Q107: A(n) _ queuing system is one in