Multiple Choice
A project organization that becomes permanent is often referred to as a
A) fixed project organization.
B) matrix organization.
C) normal organization.
D) standard organization.
E) mixed-function organization.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q27: The PERT pessimistic time estimate is an
Q32: PERT calculations typically include the duration variance
Q34: Consider the network presented in the
Q35: Which of the following statements regarding PERT
Q37: Given the project within the table
Q39: In PERT analysis, the identification of the
Q47: One phase of a large project is
Q60: What are the advantages of using PERT
Q66: Identify, in order, the six steps basic
Q117: If an activity whose normal duration is