True/False
It is sometimes not necessary to determine new control limits after special cause variation has been identified if the source has been eliminated without changing the process.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q4: Control chart sample sizes are becoming smaller
Q23: A company produces a product which is
Q29: Special cause variation can be identified using
Q29: Process control charts are often used at
Q44: Construction and use of an <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB5643/.jpg"
Q48: When a control chart detects no special
Q50: An x-bar and R-chart constructed to monitor
Q63: The range is the difference between the
Q75: Statistical process control involves monitoring and controlling
Q85: It is possible to have low variation