Carter,Inc.produces two different products,Product A and Product B.Carter uses a traditional volume-based costing system in which direct labor hours are the allocation base.Carter is considering switching to an ABC system by splitting its manufacturing overhead cost of $1,000,000 across three activities: Design,Production,and Inspection.Under the traditional volume-based costing system,the predetermined overhead rate is $2.50/direct labor hour.Under the ABC system,the rate for each activity and usage of the activity drivers are as follows:
Carter,Inc.produces two different products,Product A and Product B.Carter uses a traditional volume-based costing system in which direct labor hours are the allocation base.Carter is considering switching to an ABC system by splitting its manufacturing overhead cost of $1,000,000 across three activities: Design,Production,and Inspection.Under the traditional volume-based costing system,the predetermined overhead rate is $2.50/direct labor hour.Under the ABC system,the rate for each activity and usage of the activity drivers are as follows:    Required: a.Calculate the indirect manufacturing costs assigned to Product A under the traditional costing system. b.Calculate the indirect manufacturing costs assigned to Product B under the traditional costing system. c.Calculate the indirect manufacturing costs assigned to Product A under the ABC system. d.Calculate the indirect manufacturing costs assigned to Product B under the ABC system. e.Which product is under-costed and which is over-costed under the volume-based cost system compared to ABC? Required:
a.Calculate the indirect manufacturing costs assigned to Product A under the traditional costing system.
b.Calculate the indirect manufacturing costs assigned to Product B under the traditional costing system.
c.Calculate the indirect manufacturing costs assigned to Product A under the ABC system.
d.Calculate the indirect manufacturing costs assigned to Product B under the ABC system.
e.Which product is under-costed and which is over-costed under the volume-based cost system compared to ABC?

Correct Answer:

verifed

Verified

a.$250,000 = $2.50 × 100,000
b.$750,000 ...