Multiple Choice
Which of the following procedures for dealing with an unstable baseline might be appropriate in some situations?
A) Introduce intervention anyway, recognizing that a stable baseline is not feasible.
B) Delay intervention until the baseline becomes stable.
C) all of these.
Correct Answer:

Verified
Correct Answer:
Verified
Q1: What would you infer from the
Q2: Ideally,baselines should be extended until a stable
Q3: Target problems can be quantified in terms
Q5: Identify three qualitative methods that can be
Q7: Suppose you obtained the following results
Q8: The length of the baseline in single-case
Q9: A practitioner tests whether a new technique
Q11: The ability to construct a retrospective baseline
Q11: Multiple measurement points during baseline control for
Q20: Although AB designs offer the least control